Step 1 : Barrel 3 arrives and is unloaded from outer transport container (9/03) - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

Step 1 : Barrel 3 arrives and is unloaded from outer transport container (9/03)

Description:

TRT barrel is transferred in ID-barrel trolley = SCT- TRT insertion tools are installed ... EC-C TRT is moved into trolley and insertion tools are setup (location? ... – PowerPoint PPT presentation

Number of Views:15
Avg rating:3.0/5.0
Slides: 23
Provided by: pernegW
Category:

less

Transcript and Presenter's Notes

Title: Step 1 : Barrel 3 arrives and is unloaded from outer transport container (9/03)


1
Step 1 Barrel 3 arrives and is unloaded from
outer transport container (9/03)
2
Step 2 Barrel 3 is moved to visual inspection in
AA in inner transport container
3
  • Step 3 Barrel 3 is place in AA for visual
    inspection
  • Panels are removed
  • Air cleaner is installed above barrel
  • camera/microscope support is added

4
  • Step 4 Barrel 3 is transfered to test area for
    acceptance tests
  • Connect services and add thermal panels
  • Follow acceptance test procedure on B3

5
Step 5 B3 remains on test stand for stability
checks until B6 arrives B 6 arrives, is unloaded
and transferred to visual inspection
6
Step 6 Visual inspection of B6 B3 is
disconnected from services (thermal enclosure
panels are removed) and storage panels are
mounted in B3
7
Step 7B3 is moved to "park area" B6 is moved to
test area for acceptance tests ( connect
services, add thermal panels, follow acceptance
test procedure)
8
Step 8 Barrel 4 and Barrel 5 will arrive at
roughly same time B6 continues on acceptance test
9
Step 9 Visual inspection of B5 and B4 (one after
the other)
10
Step 10 B5 and B4 are moved to Test area for
acceptance tests need to forsee parallel work
on B4 and B5 (depends on schedule) follow
acceptance test like B6
11
Step 11 4-Barrel assembly tool is being
installed and prepared in assembly area and
tested B4/5 acceptance test continue
12
Step 12 4-barrel assembly starts with thermal
enclosure and B6
13
Step 13 assembly area 4-barrel assembly
continues test area is prepared for ID tests,
TRT/SCT insertion, X-ray system test area
acceptance test stand is moved to center of
platform (preparation for SCT-TRT insertion and
ID tests) additional 1400 cables/fibres arrive
from macro assembly sites and are installed in
test area
14
Step 14 SCT barrel assembly is finished (some
small checks are performed using the assembly
area small test system)
15
Step 15 OPTION 1 TRT/SCT insertion on large
platform TRT barrel is transferred in ID-barrel
trolley SCT-gtTRT insertion tools are installed
16
Step 15 OPTION 2 TRT/SCT insertion on test area
platform TRT barrel is transferred in ID-barrel
trolley SCT-gtTRT insertion tools are installed
17
Step 16 Option 1 SCT insertion on large
platform
18
Step 16 Option 2 SCT insertion in test area
19
Step 17 ID barrel is connected to services
SCT EC C arrives and is setup for acceptance
tests in assembly area
20
Step 18 add panels/enclosures are required,
prepare for X-ray equipment assembly area EC
add wings/thermal enclosure, test thermal
enclosure
21
Step 19 X-ray tube is installed in ID barrel
and detector is closed common power tests SCT
full power readout test EC-A arrives
22
Step 20 Common readout tests and stability
checks on ID barrel EC-A is connected and
acceptance test starts EC-C TRT is moved into
trolley and insertion tools are setup (location?)