  • FIRE RETARDANT SYSTEMS AND SOLUTIONS

Marketed by
2
INTRODUCTION
  • We at Multi kilfire believe strongly in the
    adage PREVENTION IS BETTER THAN CURE. Active
    Fire Systems which include hydrants, sprinklers
    smoke detectors, come into play only after the
    fire breaks out whereas Passive Systems help in
    preventing and retarding fires. While Passive
    systems cannot be considered to be an alternative
    to Active systems, they definitely rationalize
    the need for extensive deployment of Active
    Systems. A marriage between both types of systems
    is not only physically safer but also more cost
    effective.

3
PRODUCTS APPROVED BY
  • Raytheon U.S.A.
  • Tata Consulting Engineers
  • Rolls Royce U.K.
  • BHEL
  • MECON
  • M. N. Dastur Co.
  • DEISIN
  • DCL
  • FICHTNER
  • EIL

4
FIRE RETARDANT COATING FOR ELECTRICAL CABLES
KF600
5
EFFECTIVENESS OF FIRE RETARDANT COATING
  • Functions by limiting the oxygen drawn from the
    atmosphere, thereby inhibiting the combustion and
    heat build-up process in the immediate vicinity
    of the cable insulation.
  • The coating converts the bunch of cables into
    one coated cable
  • and compartmentalizes an uncoated fire zone
    from the coated
  • non fire zone.
  • Dissipates the heat generated by the fire and
    thereby prevents heat conduction.

6
TECHNICAL DATA
7
RECOMMENDED DIMENSIONS AREAS CABLE COATING KF
600
8
(No Transcript)
9
COATING ILLUSTRATION
10
LIVE DEMONSTRATION
11
FIRE SPREAD TEST KF 600AT UKAI TPS
12
(No Transcript)
13
(No Transcript)
14
(No Transcript)
15
IEEE 383 FLAMMABILITY TESTAT ERDA, BARODA
16
TEST CHAMBER
17
INSIDE TEST CHAMBER
18
WRAPPING BURLAP ON COATED CABLE- 2.45 M LONG
19
BURLAP TIED AT 1 M FROM BOTTOM
20
BURLAP LIT
21
(No Transcript)
22
CONTROL PANEL - SUZLON
23
ADITYA BIRLA, ULTRATECH CEMENT, TADAPATRI
24
GSPCL
25
JSPL
26
KF 604 FIRE STOP BARRIERS.
27
NOMENCLATURE DIFFERENT NAMES
  • FIRE STOP COMPOUND
  • FIRE STOP BARRIER
  • FIRE SEALING SYSTEM
  • FIRE PENETRATION SEALING SYSTEM
  • FIRE COMPARTMENTILISATION
  • FIREPROOF SEALING
  • FPSS

28
DESCRIPTION
29
TECHNICAL DATA
30
(No Transcript)
31
FIRE TEST AT CBRI ROURKEE
  • Electrical cables are extensively used in all
    major industries. These are mostly run through
    underground cable tunnels, trenches, overhead
    cable trays and ducts. Any fire incidence in the
    vicinity of these may result in spread of fire
    along the cable trays as modern production
    facilities demand long run of power and control
    cables all over the Plant area.

32
FIRE TEST AT CBRI ROURKEE
  • The fire safety can be enhanced by providing Fire
    Stop Barriers at different intervals and by
    sealing the openings.
  • The complete cable Barrier should be thoroughly
    evaluated before its installation for providing
    compartmentation

33
FIRE TEST AT CBRI ROURKEE
  • We sponsored the Project to evaluate the
    performance of our cable Fire Barrier KF-604 with
    respect to furnace heating conditions and other
    appropriate procedures specified in relevant
    Standards.
  • The Fire Research Laboratory at Rourkee approved
    by CSIR Laboratory has established standard
    facilities conforming to various National and
    International Standards for evaluating Fire
    Resistance of different type of systems.

34
TYPE TEST SAMPLE FOR TESTING AT CBRI, ROURKEE
35
KF-604 BEING READIED FOR FIRE TEST AT C.B.R.I.
ROORKEE
36
ILLUSTRATIONS
37
WALL AND FLOOR OPENINGS
38
LIVE DEMONSTRATIONS
39
FLOOR OPENING
40
(No Transcript)
41
(No Transcript)
42
(No Transcript)
43
(No Transcript)
44
WALL OPENING
45
(No Transcript)
46
SOME INSTALLATIONS
47
POWDER MIXED WITH WATER TO MAKE ATTA LIKE DOUGH
48
(No Transcript)
49
AT WANAKBORI TPS WALL OPENING
50
(No Transcript)
51
WALL OPENING INSTALLATION AT BALCO
52
(No Transcript)
53
WALL OPENING INSTALLATION AT ADITYA BIRLA -
ULTRATECH POWER PLANT OF AP CEMENT AT TADAPATRI
A.P.
54
(No Transcript)
55
FLOOR OPENING INSTALLATION AT RAICHUR TPS
56
(No Transcript)
57
OUR CLIENTSPOWER PLANTS
SRL CLIENT PLANT / LOCATION
1 Gujarat Electricity Board Wanakbori, Ukai, Gandhinagar TPS.
2 Rajasthan Electricity Board Kota TPS
3 Andhra Pradesh Electricity Board Vijaywada, Ramagundam TPS
4 Tamilnadu Electricity Board Kadampari (Hydro)
5 Nuclear Power Corporation Narora, Kakrapar, Kaiga Kalpakkam. NFC IGCAR
6 Bhakra Beas Management Board Nangal, Ganguwal Kotla
58

SRL CLIENT PLANT / LOCATION
7 M.P. State Electricity Board Sanjay Gandhi TPS, Birsinghpur.
8 Karnataka Power Corp. Ltd. Raichur TPS
9 Ahmedabad Elect. Co. Ltd. Sabarmati TPS, Vatva Gas
10 ---- DO --- Project Division Vijaywada TPS, Kothagundam TPS, Basin Bridge Gas, Jindal Tractbel gas
11 Gujarat Ind. Power Co. Ltd. Baroda, Mangrol
12 Tata Power Ltd Chembur, Sewri, Bhira, Khopoli
13 Rolls Royce Industrial Power Kakinada
59

SRL CLIENT PLANT/ LOCATION
14 Crompton Greaves Ltd Godavari gas project
15 Neyveli Lignite Corp. Ltd. Neyveli
16 GE Power Kondapalli
17 BHEL Basin Bridge Gas Turbine, Vizag Lehra Mohabbat
18 L T IPCL Gandhar CPP, Usha Martin CPP
19 Tata Chemicals Okha
20 Thermax Torrent Power Plant
21 Gujarat Power Gen. Ltd. Bharuch
22 UB Engineering Ltd. Raichur TPS
60

SRL CLIENT PLANT/ LOCATION
23 Tata Projects Ltd ACC Wadi TPS
24 BSES Ltd. GSECL CPP Dhuvaran
25 Wartsila Tata Power Belgaum
26 BALCO CPP NTPC Korba
CEMENT PLANTS CEMENT PLANTS CEMENT PLANTS
27 Ambuja Cement Kodinar, Ropar, Darlaghat
28 Maratha Cement Chandrapur
29 Vikram Cement Jawad
30 Ultra tech Aditya Birla Chittorgarh, Tadapatri, Grasim, Hirmi

61

SRL CLIENT PLANT/ LOCATION
31 ACC Through L T Jamul, Kymore
32 Birla White Cement Kharia Khangar
FERTILIZER PLANTS FERTILIZER PLANTS FERTILIZER PLANTS
33 Gujarat State Fertilizer Co. Baroda, Sikka
34 National Fertilizer Nangal
35 Shriram Fertilizer Kota
36 Rourkela Fertilizer Rourkela
37 KRIBHCO CO-OP Ltd. Hazira
62

SRL CLIENT PLANT/ LOCATION
PETRO CHEMICALS REFINERIES PETRO CHEMICALS REFINERIES PETRO CHEMICALS REFINERIES
38 Indian Oil Corporation Ltd. Baroda, Panipat, Mathura
39 GACL Baroda
40 Numaligarh Refinery Numaligarh Through Blue Star
41 Indian Petrochemicals Ltd. Baroda, Nagothane, Dahej
42 Gujarat heavy Chemicals Ltd. Veraval
43 Rayalseema Alkalies Rayalseema
44 Digboi Refinery Thru LT and BHPV DIGBOI
63

SRL CLIENT PLANT/ LOCATION
PETRO CHEMICALS REFINERIES PETRO CHEMICALS REFINERIES PETRO CHEMICALS REFINERIES
45 Chennai Petroleum thru LT, Punj Lloyd, Nitson Amitsu Chennai
46 IOCL Panipat thru LT, Daelim Panipat
47 Deepak Nitrite Ltd. Nandesari - Vadodara
STEEL PLANTS STEEL PLANTS STEEL PLANTS
48 Steel Authority of India Ltd. Bhilai, Rourkela, Burnpur.
49 Essar Steel Hazira and Jamnagar
50 Rashtriya ispat Nigam Vishakhapatnam
51 Jindal Steel Power Raigarh, Chhattisgarh
64

SRL CLIENT PLANT/ LOCATION
THROUGH COMPANIES UNDER SUB-CONTRACT THROUGH COMPANIES UNDER SUB-CONTRACT THROUGH COMPANIES UNDER SUB-CONTRACT
52 Bells CEREBRUS Ltd., BHEL Bhilai
53 ABB, MUKAND, EPIL, SIEMENS, PHILIPS, ANDREW YULE, MECON Rourkela
54 L T TISCO, Jamshedpur
55 BHEL, MECON Vishakhapatnam
56 Llyod Insulation Ltd. Bhilai
57 Technico I Pvt. Ltd. TISCO, Jamshedpur
58 Mahati Electrics Pune Raichur TPS
59 Driplex Water Engg Ltd Neyveli Lignite
60 Ahluwalia Const India Ltd. Reliance Power, M.P.
65

SRL CLIENT PLANT/ LOCATION
OTHERS OTHERS OTHERS
58 GRASIM Nagda
59 AMUL Dairy Anand - Gujarat
60 Heavy Water Plant Tuticorin, RCF, Alibaug
61 BHEL, ELECON Open Cast Mines, Ramagundam
62 Hotel LEELA Mumbai
63 Electrical Sub-stations Surat, CESC Kolkata, Asoj, Soja, Limdi, Kasor, Karamsad. MSTCL, Pune.