PETE 689 Underbalanced Drilling, UBD - PowerPoint PPT Presentation

1 / 46
About This Presentation
Title:

PETE 689 Underbalanced Drilling, UBD

Description:

... rocks, a positive differential pressure will decrease penetration because. ... To double the penetration rate the BHP would have to be dropped to ~ 1500 psi. ... – PowerPoint PPT presentation

Number of Views:963
Avg rating:3.0/5.0
Slides: 47
Provided by: drjeromejs
Category:

less

Transcript and Presenter's Notes

Title: PETE 689 Underbalanced Drilling, UBD


1
PETE 689 - Underbalanced Drilling, UBD
  • Lesson 3
  • Benefits of Underbalanced Drilling
  • Read UDM - Chapter 3

Harold Vance Department of Petroleum Engineering
2
Benefits of Underbalanced Drilling
  • Increased penetration rate.
  • Increased bit life.
  • Minimize lost circulation.
  • Improved formation evaluation.
  • Reduced formation damage.

Harold Vance Department of Petroleum Engineering
3
Benefits of Underbalanced Drilling
  • Reduced probability of differential sticking.
  • Earlier production.
  • Environmental benefits.
  • Improved safety.
  • Increased well productivity.
  • Less need for stimulation treatments.

Harold Vance Department of Petroleum Engineering
4
Increased Penetration Rate
  • In permeable rocks, a positive differential
    pressure will decrease penetration because.
  • Increases the effective confining stress which.
  • Increases the rocks shear strength.
  • Therefore increasing shear stress (by drilling
    UB) increases penetration rate.
  • And increases the chip hold down effect.

Harold Vance Department of Petroleum Engineering
5
Chip Hold Down Effect
Bit tooth.
As drilling fluid enters the fracture, the
pressure differential across the rock fragment
decreases, releasing the chip.
Crack in the formation.
Harold Vance Department of Petroleum Engineering
6
Effect of Pressure Differential
Micro-bit test
  • In permeable rocks penetration rate is a function
    of the differential pressure not the absolute
    pressure.

12
Indiana Limestone Confining Pressure 6000
psi Bit weight 1000 lbm 50 rpm
10
8
Drilling Rate (ft/hr)
6
4
2
0
0 1000 2000 3000
4000 5000
Overbalanced Differential Pressure (psl)
Harold Vance Department of Petroleum Engineering
7
Gas Drilling Vs. Mud Drilling
Drilling Days
0 20 40 60 80
100 120
0
Drilled With Mud Drilled
With Gas
1000
2000
3000
Mud
4000
Depth (feet)
5000
6000
7000
8000
Gas
9000
10000
Harold Vance Department of Petroleum Engineering
8
Penetration Rate As A Function Of The
Differential Pressure Across The Workfront
Harold Vance Department of Petroleum Engineering
9
Penetration Rate in Impermeable Rocks
Bit tooth
In impermeable rock, the instantaneous initial
pressure in the crack itself is close to zero,
i.e. the penetration rate is now a function of
absolute wellbore pressure.
Crack in the formation.
Harold Vance Department of Petroleum Engineering
10
Borehole pressure 440 psi
150
X Pore Pressure 87 psi O Pore Pressure 508
psi
125
100
75
Rate of Penetration (ft/hr)
50
25
0
0 5000 10000 15000 20000
25000 30000 35000 40000 45000
50000
Downhole Weight on Bit (lbf)
Harold Vance Department of Petroleum Engineering
11
Borehole pressure 1.450 psi
150
X Pore Pressure 580 psi O Pore Pressure 870
psi Pore Pressure 116 psi
125
100
Rate of Penetration (ft/hr)
75
50
25
0
0 5000 10000 15000 20000
25000 30000 35000 40000 45000
50000
Downhole Weight on Bit (lbf)
Harold Vance Department of Petroleum Engineering
12
Borehole pressure 4.800 psi
150
X Pore Pressure 2320 psi Pore Pressure 4930
psi
125
100
Rate of Penetration (ft/hr)
75
50
25
0
0 5000 10000 15000 20000
25000 30000 35000 40000 45000
50000
Downhole Weight on Bit (lbf)
Harold Vance Department of Petroleum Engineering
13
Normalized Drilling Strength

WOB x RPM
ROP Pb
WOB x RPM
ROP Po DSn Normalized Drilling
Strength Index. WOB Weight on Bit (lbf). RPM
Rotary speed (rpm). ROP Rate of penetration
(ft/hr). P Pressure (psia). Subscript
b Indicates borehole conditions. Subscript
o Indicates atmospheric conditions.
DSn
Harold Vance Department of Petroleum Engineering
14
Influence Of BHP On Normalized Drilling Strength
In Hard Shales
Normalized Rock Drilling Strength, DSn
A value of 5 means that the penetration rate at
an specific BHP will be 1/5 of the penetration
rate at atmospheric pressure.
0 500 1000 1500 2000
2500 3000 3500 4000 4500
5000
Bottomhole Pressure (psi)
Harold Vance Department of Petroleum Engineering
15
Normalized Shale Strength Example
  • A well drilled with an unweighted
  • (8.5 ppg) mud at a depth of 6000.
  • BHP 2900 psi.
  • Reducing the effective MW to 7 ppg reduces BHP to
    2400 psi.
  • Decreases the drilling strength, i.e., increase
    the penetration rate by less than 15.

Harold Vance Department of Petroleum Engineering
16
Normalized Shale Strength Example
  • To double the penetration rate the BHP would have
    to be dropped to
  • 1500 psi.
  • A BHP of 100 psi might be expected if drilling
    with air and would increase the penetration rate
    approximately 5 times.
  • Note This assumes equal WOB and RPM.

Harold Vance Department of Petroleum Engineering
17
Normalized Shale Strength Example
10
9
8
7
6
5
Normalized Rock Drilling Strength, DSn
4
3
2
1
0
0 500 1000 1500 2000
2500 3000 3500 4000
4500 5000
Bottomhole Pressure (psi)
Harold Vance Department of Petroleum Engineering
18
Field Example Switching From Air To Mud
3000
Well 1 Well 2
Well 3
4000
DRY AIR
5000
SWITCH TO MUD
Depth (feet)
6000
7000
8000
9000
5 10 15
20 25
30
Days
Harold Vance Department of Petroleum Engineering
19
Increased Bit Life???
  • Increased vibration with air drilling may
    actually decrease bearing life.
  • Bit may drill fewer rotating hours but drill more
    footage.
  • The number of bits required to drill an interval
    will be inversely proportional to the footage
    drilled by each bit.

Harold Vance Department of Petroleum Engineering
20
Effect Of UBD On Cutting Structure Of Roller Cone
Bits
  • Mechanical Specific Energy, MSE, is defined as
    the mechanical work that must be done to excavate
    a unit volume of rock.

Harold Vance Department of Petroleum Engineering
21
The Work Done By The Bit Is
WOB x ROP 60 x RPM
W 2 pt
Where W work done by the bit (ft/ lbf/
revolution) t torque (ft- lbf) WOB weight on
bit (lbf) ROP rate of penetration (ft/hr) RPM
revolutions per minute
Harold Vance Department of Petroleum Engineering
22
The Volume Of Rock Excavated Per Revolution Is
V volume of rock excavated per revolution (ft
3) db bit diameter (feet)
Harold Vance Department of Petroleum Engineering
23
The Mechanical Specific Energy Is Give By
480 t x RPM 4WOB d b2 x ROP pd b2


MSE
MSE mechanical specific energy (psi)
Harold Vance Department of Petroleum Engineering
24
What Does This Mean?
480 t x RPM 4WOB d b2 x ROP pd b2


MSE
  • Bit torque is not a function of borehole
    pressures.
  • Penetration rates generally increase with
    decreasing borehole pressures.
  • MSE are therefore, usually lower at lower
    borehole pressures.

Harold Vance Department of Petroleum Engineering
25
What Does This Mean?
  • Therefore, cutting structure wear rates (in terms
    of distance drilled) should be inversely related
    to the MSE.
  • If the bit has to do less work to remove a given
    volume of rock, its cutting elements should wear
    less.
  • A bit should be able to drill more footage, when
    drilling underbalanced.

Harold Vance Department of Petroleum Engineering
26
Reduced Differential Sticking
  • Fs Ac DPms 144 sq.in./sq.ft.
  • Fs Force required to free pipe (lbf)
  • Ac Contact area (sq. ft)
  • DP Pressure differential across the mud cake
    (psid)
  • ms Coefficient of friction between the
    string and the mud cake.

Harold Vance Department of Petroleum Engineering
27
Example
  • Contact area is 30 feet long and 0.25 ft wide.
  • Pressure differential is 300 psid.
  • The coefficient of friction is 0.3
  • The force to free the pipe (in excess of string
    weight) is
  • 30 x 0.25 x 300 x 0.3 x 144 97,200 lbf.
  • Note Equation 3.5 in text is incorrect.

Harold Vance Department of Petroleum Engineering
28
Minimized Lost Circulation
  • If the pressure in the wellbore is less than the
    formation pressure in the entire open hole
    section, lost circulation will not occur.

Harold Vance Department of Petroleum Engineering
29
Improved Formation Evaluation
  • Production rates while drilling UB can be
    measured with no filtrate invasion occurring.
  • No filtrate invasion can mean more accurate LWD
    measurements.

Harold Vance Department of Petroleum Engineering
30
Reduces Formation Damage
Harold Vance Department of Petroleum Engineering
31
Formation Damage Mechanisms During Drilling
(Overbalanced)
  • Scales, sludges or emulsions due to interaction
    between filtrates and pore fluids.
  • Interaction between aqueous mud filtrate and clay
    particles in the formation.
  • Solids invasion.

Harold Vance Department of Petroleum Engineering
32
Formation Damage Mechanisms During Drilling
(Overbalanced)
  • Phase trapping or blocking.
  • Adsorption of drilling fluid additives, leading
    to permeability reductions or changes in
    wettability.
  • Migration of fines in the formation.
  • Generation of pore-blocking organic byproducts
    from bacteria entering the formation from the
    drilling fluid.

Harold Vance Department of Petroleum Engineering
33
Formation Damage Mechanisms During Drilling
(Overbalanced)
  • Temporary overbalance.
  • Spontaneous imbibition.
  • Gravity-induced invasion.
  • Wellbore glazing.
  • Post-drilling damage.
  • Mechanical degradation.

Harold Vance Department of Petroleum Engineering
34
Temporary Overbalance
  • Can be intentional to
  • Kill well for trips.
  • Transmit MWD surveys.
  • Log the well.
  • Completion and WO operations.

Harold Vance Department of Petroleum Engineering
35
Temporary Overbalance
  • Can be unintentional
  • Slug flow or liquid holdup causing fluctuations
    in downhole pressure.
  • High fluid pressures across the face of diamond
    and TSP bits.
  • Near wellbore production reduces the formation
    pressure near the face of the wellbore.

Harold Vance Department of Petroleum Engineering
36
Temporary Overbalance
  • Can be unintentional
  • Varying pore pressure along the wellbore.
  • Drill string running too fast after a bit is
    changed.
  • Equipment malfunctions or procedural errors.

Harold Vance Department of Petroleum Engineering
37
Spontaneous Imbibition
  • Due to capillary effects - even if drilling
    underbalanced.
  • The underbalance pressure necessary to prevent
    water from being drawn from an aqueous drilling
    fluid into the formation will depend on the
    initial formation water saturation and the pore
    sizes.

Harold Vance Department of Petroleum Engineering
38
Spontaneous Imbibition
800
Countercurrent Imbibition is Possible for Initial
Wetting Phase Saurations Between 20 and 47 for
the Underbalance Pressure Shown in this Example
(200 psi).
Zone of Potential Spontaneous Imbibition
700
600
500
Capillary Pressure (psi)
400
300
Example Underbalance Pressure
200
100
Sa c 47 (Equilibrium)
Sa i 20
S a irr 40
0
0 20
40 60
80 100
Wetting Phase, a, Saturation ()
Harold Vance Department of Petroleum Engineering
39
Gravity-induced Invasion
  • Can occur during UBD in the
  • formation produces from
  • natural fractures or vugs.

Harold Vance Department of Petroleum Engineering
40
Wellbore Glazing
  • UBD can result in high wellbore temperatures due
    to the friction between the rotating drillstring
    and the borehole wall.
  • This can cause a thin low permeability glazed
    zone.

Harold Vance Department of Petroleum Engineering
41
Post-drilling Damage
  • Due to
  • Killing the well for completion.
  • Cementing.
  • Mobilization of fines during production.
  • Liquid coning in gas reservoir.

Harold Vance Department of Petroleum Engineering
42
Mechanical Degradation
  • Rock around the wellbore experiences a
    concentration of in-situ stresses due to drilling
    the well.
  • As the wellbore pressure is lowered, the
    effective stresses increase.
  • Resulting in a decrease in porosity and available
    flow channels leading to reduced permeability.

Harold Vance Department of Petroleum Engineering
43
Earlier Production
  • With the necessary equipment on location during
    UBD operations, produced fluids can go to sales.
  • Open-hole completions are sometimes performed.
  • If the well is drilled and completed
    underbalanced, wells from depleated reservoirs
    will not need swabbing.

Harold Vance Department of Petroleum Engineering
44
Environmental Benefits
  • Closed loop systems produce less wasted drilling
    fluids.

Harold Vance Department of Petroleum Engineering
45
Less Need for Stimulation
  • If the formation is not damaged during drilling
    and completion, stimulation to remove the damage
    will not be needed.

Harold Vance Department of Petroleum Engineering
46
End of Lesson 3
Harold Vance Department of Petroleum Engineering
Write a Comment
User Comments (0)
About PowerShow.com