Title: Environmental Issues


1
Environmental Issues ISR Part II
(Environment) DPW Future Concerns
2
Installation Status Report Part II (Environment)
3
Changes Made for FY00 Data Call
  • The following changes were a result of
    recommendations by the ISR 2 Workgroup in July
    and approved by the DEP for the current data
    call
  • 1. The ISR2 software was rewritten as 32-bit
    application, Access database
  • 2. Media were reduced from 23 to 19.
  • Asbestos, Radon, Lead PCB TSCA
  • Wetlands Natural Resources
  • 3. Review of all standards. Standards reduced
    from 620 to 401.
  • 4. 20 of standards auto-populated from EPR, EQR
    and DSERTS.
  • 5. Critical Element designation eliminated.
  • 6. Must Fund standard has been modified to
    include two classifications legally-mandated
    and policy-driven.

4
ISR ENVIRONMENT PROCESS
15 May
11-13 Jul
ACSIM has not granted an extension for ISR 2 data
submission to date. ISR 2 Workgroup reps
indicated on 6 Apr that they do not anticipate a
problem meeting that suspense.
5
Current MACOM Concerns
  • Funding standards causing inordinate of
    commanders overwrites.
  • Request to review the impact of the Must Fund
    standards on the Armys C-Ratings for FY00.
  • Keep the ISR 2 software as a PC-based application
    and not move it to the web until the
    infrastructure and technology improves.
  • Do not make any major changes to the software or
    standards until the Environmental Funding
    Predictive Model concept with linkage to ISR 2 is
    developed.

6
Current MACOM Concerns
  • Request for commitment by ACSIM not to distribute
    the software until fully tested by installation
    personnel.
  • Ensure sufficient time for the workgroup to fully
    test any new and potentially complex policy,
    standards, or software changes before they are
    implemented.

7
Future of ISR 2
  • Efforts to develop an environmental funding model
    for ISR 2.
  • Consistency with approach in ISR-1 and AIM-HI.
  • Links performance with funding.
  • More defensible POM submission to OSD and
    Congress.
  • Adds accountability in terms of measurable
    performance indicators.
  • All ISR software will eventually be web-based.
  • ISR 2 Workgroup will continue to be driving force
    in making improvements to the program.

8
ISR Assistance
  • ISR help desk
  • Phone (703) 412-7681
  • (703) 602-0231
  • DSN-332-0231
  • Fax (703) 412-7694
  • Email hotline_isr_at_bah.com
  • Hours 0800-1700 M-F EST
  • WEB SITE
  • http//isr.xservices.com/
  • Available for download from Web Site
  • All ISR Software
  • Implementing Instructions
  • Standards and Instruction Package
  • Software Users Manuals
  • Training Addendum
  • FAQs, Important Notes, and Alerts

9
ODEPs Requested DPW Environmental Focus in the
Future
10
Get personally involved!
11
DPW Enviro Staff one TEAM
12
ECAS
ICAP - ensure execution - get Garrison and
Installation Commanders support ECAR - new
policy - Exec summary through Garrison Cdr to
ACSIM - ACSIM may help with People Tiger
team(s) 1/4ly IPR - ICAP status brief (account
for every ENF)
13
ECAS
Improvements Windows based Root cause
analysis tools - management -
infrastructure - operational - natural event
14
Environmental Projects
Report accurately on EPR - Compliance vs P-2 -
upgrading Class 2 / 3 to Class 2-high Maintain
properly - oil-water separators - removing
asbestos w/o notification Operate properly -
certify operators - get permits first -
establish follow local SOPs
15
INRMP / ICRMP
Do them - Do NEPA assessment - collect very
specific spatial data ( location of
endangered species, wetlands, burn areas,
archeological sites, soil series, topo, lakes,
hunting / grazing areas, timber, game) -
ensure they support the mission - get
commanders commitment! - get community
support - establish systems for updating
data Enforce them Review them
16
UXO(C)
A/I Ranges - Inactive vs Closed Ranges and the
EPA - Range Inventory DPW Range Control BIG
BUDS UXO(C) beyond ranges
17
Chiefs Transformation vs NEPA
Programmatic EIS - DA HQ level Installation EA
/ EIS - Installation level - satellite
installations / training areas Concerns - Long
lead times (6 to 9 months) - public comment /
support - if in doubt, evaluate it
18
Show Stoppers
NOVs INRMP UXO(C) Unfunded Environmental
Projects