WG 2 Chairmans Report Airspace and Procedure Designers - PowerPoint PPT Presentation

1 / 13
About This Presentation
Title:

WG 2 Chairmans Report Airspace and Procedure Designers

Description:

... workload eg replacement of difficult conventional procedures (NDB and Circling) ... Route spacing criteria needed for P-RNAV and RNP x RNAV. ... – PowerPoint PPT presentation

Number of Views:79
Avg rating:3.0/5.0
Slides: 14
Provided by: toto4
Category:

less

Transcript and Presenter's Notes

Title: WG 2 Chairmans Report Airspace and Procedure Designers


1
WG 2 Chairmans ReportAirspace and Procedure
Designers
2
Topics Covered
  • Airspace Design and Route Spacing
  • Quality Assurance and Data Integrity
  • Publication Issues
  • Validation of RNAV procedures

3
Benefits
  • Safety
  • Reduced crew workload eg replacement of difficult
    conventional procedures (NDB and Circling)
  • Stabilised approaches
  • Flexibility - revised sectors
  • Environment
  • Cost savings through shorter routes
  • Effective use of existing equipment

4
Issues - Airspace Design and Route Spacing
  • Revise Sectorisation
  • Introduce co-operative planning
  • Route spacing criteria needed for P-RNAV and RNP
    x RNAV.
  • Resolve conflict between Annex 11 definition of
    RNP4 procedural spacing criteria and EUROCONTROL
    B-RNAV safety case.
  • Provide clear definition of protected area
  • Address separation from military airspace.

5
Issues - Quality Assurance and Data Integrity
  • Harmonised method for applying CRCs.
  • Standards for procedure designers.
  • Widen ICAO Safety Oversight Programme to include
    PANSOPS issues.
  • Encourage implementation of QA procedures and
    application of ED 77/DO 201A.
  • Encourage implementation of existing ICAO
    standards (Annex 4, 15 and PANS-OPS)
  • Need for adherence to AIRAC dates
  • Many aircraft have limited database capacity
  • ARINC 424 format showing age but unlikely to be
    replaced in near future.

6
Issues - Publication
  • No standardisation of commercial charts
  • Standards for AIS staff
  • Standardisation of naming convention
  • Lack of co-ordination between designer and
    database coder
  • Standards for RNAV charts
  • True bearings?
  • Co-ordinates - only runway threshold?
  • Define RNAV Transitions in ICAO material

7
Issues - Implementation of RNAV Procedures
  • New design criteria.
  • Need to understand coding issues.
  • Need for validation - what tools?
  • Educate users on limitations of RNAV

8
Conclusion
  • EUROCONTROL and ICAO to address
  • Route spacing
  • AIS, charting and procedure design standards
  • Support tools for designers - validation, DME
    screening, CRMs, etc
  • Frequency spectrum issues for DME and GNSS

9
Conclusion
  • States to address
  • Quality assurance
  • Education of AIS and designers
  • Adherence to ICAO standards e.g AIRAC cycle, WGS
    84

10
Conclusion
  • Operators to address
  • Database checking
  • Training
  • Meeting the RNAV procedure requirements

11
How to Get There?
  • Education, education, education.
  • International co-operation including regulatory
    authorities and industry.

12
  • KEEP TALKING
  • but
  • START WORKING

13
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com