Gaviota Beach Road Transportation Division County Project Summer Crossing Pre 1997

Description:

Located west of Highway 101. Access to Gaviota Beach and Hollister Ranch. Gaviota Beach Road ... Gathered input from Hollister Ranch and State Parks ... – PowerPoint PPT presentation

Number of Views:61
Avg rating:3.0/5.0
Slides: 14
Provided by: Ben92
Category:

less

Transcript and Presenter's Notes

Title: Gaviota Beach Road Transportation Division County Project Summer Crossing Pre 1997


1
Gaviota Beach Road Transportation Division
County Project Summer Crossing Pre 1997
  • Located west of Highway 101
  • Access to Gaviota Beach and Hollister Ranch

2
Gaviota Beach Road Bridge No. 51C-324
  • 80 foot long railcar bridge at existing roadway
    grade
  • Bridge construction completed 1997 looking
    upstream

3
Gaviota Beach Road Bridge No. 51C-324
  • Situation on February 2, 1998
  • Debris blocked flow under bridge and washed out
    the north approach roadway

4
Gaviota Beach Road Bridge No. 51C-324
  • Immediately following the 1998 storm, a concrete
    road approach was constructed
  • Repaired north approach road.

5
Gaviota Beach Road Bridge No. 51C-324
  • FEMA H.M.P. 406 100 approved funding for bridge
    replacement with all-weather crossing _at_ 3.8
    Million Dollars
  • FEMA 75 OES 25
  • Request for Proposals for design services May
    2002
  • Contract Awarded to Quincy Engineering-June
    2002
  • URS Corp preparing EIR/EA

6
Gaviota Beach Road Bridge No. 51C-324
  • Preferred Project Selection
  • Project Development Team
  • Determined criteria for design
  • Gathered input from Hollister Ranch and State
    Parks
  • Developed alternatives providing the greatest
    service with the least disruption

7
(No Transcript)
8
(No Transcript)
9
(No Transcript)
10
(No Transcript)
11
Gaviota Beach Road Bridge No. 51C-324
  • Stakeholders Meeting held -December 2002
  • Resource Agencies and affected parties in
    attendance
  • Permitting Agencies in support of proposed
    project
  • Project viewed as environmental benefit and
    safety improvement

12
Gaviota Beach Road Bridge No. 51C-324
  • Project Issues
  • Approach Roadway
  • Elevation increase of 12 feet
  • 600 feet to the north, 200 feet to the south
  • New bridge 250 feet in length
  • New roadway and bridge built to current standards
  • Access road to Gaviota State Park
  • Temporary access road during construction

13
Gaviota Beach Road Bridge No. 51C-324
  • Project Status
  • Project Report complete-Jan 2003
  • Notice of Preparation complete-March 2003
  • Funding Complete December 2003
  • Preliminary Engineering design to URS for use in
    EIR March 2004
  • Environmental Review Complete December 2004
  • FEMA Section 7 Consultation August 2004
  • Permits January 2005
  • Final Design and Bidding Process February 2004
    (65 design) May-2005 to Proceed