Title: AWARENESS TRAINING PROGRAMME Technical Standard and Protocol for Companies Supplying Retailer Branded Food Products
1 AWARENESS TRAINING PROGRAMMETechnical Standard
and Protocol for Companies Supplying Retailer
Branded Food Products
2Who Were Involved ?
- Inspection
- Bodies
- EFSIS
- TLC
- Law Labs
- RSSL
- National Britannia
- Trade
- Associations
-
- FDF
- BACFID
- Accreditation
- Body
- UKAS
- Retailers
- Safeway
- Tesco
- Asda
- Sainsbury
- Iceland
- Somerfield
- CWS
- Boots
- Waitrose
3Consistency of Inspection
HIGHER LEVEL Additional Beneficial Practices
BEST PRACTICE RECOMMENDATIONS
UKAS EN 45004 NEW EN 45011
4Benefits of the Standard
- Accepted Standard based on best practice
- Inspection bodies accredited to EN45004 to
achieve maximum consistency in application and
interpretation (this is changing to EN 45011,
refer to Protocol section) - Open and transparent
- Encourages continuous improvement
- Cost effective, removes need for multiple
inspections
5UKAS Accreditation (Mark)
6Benefits for the Retailer
- Removes burden of routine visits
- Focus on HACCP development
- Focus on quality
- Focus on complaint issues
- Focus on hot issues e.g GMO,allergen
7Benefits for the Manufacturer
- Resource benefit as due diligence visits
- are reduced
- Focus on factory issues
- Focus on development
- Focus on specific Retailer requirements
- Cost effective, independent and professional
audit
8CERTIFICATION
- Accredited Certification (UKAS)
- Quality Management
- Product Certification
9TYPES OF STANDARDS
- Food Standards in Europe
- Voluntary Codes
- EU Legislated
10TYPES OF STANDARDS
- Voluntary Codes (for example)
- Animal Feeds
- Cereals
- Horticultural Produce
- Dairy Produce
- Beef, Lamb, Pork
11TYPES OF STANDARDS
- EU Legislated (for example)
- Food Labelling
- Beef Labelling
- Organic Food Production
- Egg Production
- Animal Welfare
- Environment
12HACCP
- Majority of Food Chain Standards incorporate
- Hazard Analysis Critical Control Point (HACCP)
13BRC - STANDARD CONTENTS
- 1. HACCP System
- 2. Quality Management System
- 3. Factory Environment Standards
- 4. Product Control
- 5. Process Control
- 6. Personnel
14BRC - TECHNICAL STANDARD
- The BRC Standard is divided into two levels, as
follows - Foundation Level
- Higher Level
15BRC HACCP
- Useful reference documentation as suggested by
the BRC Working Group - Title
- Hazard Analysis Critical Control Points (HACCP)
system Guidelines for its Application - Published in
- Codex Alimentarius Food Hygiene Texts
- Ref. Number
- ISBN 92-5-104021-4
16THE STANDARD REQUIREMENTS
- 1. HACCP
- HACCP - Principles
- Conduct hazard analysis
- Determine critical control points
- Establish critical limits programme
- Monitor against programme
- Establish corrective action
- Verification and validation records
- Establish documentation
17THE STANDARD REQUIREMENTS
- HACCP - Risk
- Assessment of the identified risk
- Reference to appropriate technical documentation
- Prioritisation of monitoring programme
- Monitor recurring trends
- Underpinned by technical personnel
18THE STANDARD REQUIREMENTS
- HACCP - Management
- HACCP led by Senior Management commitment
- Reference to product legal and safety obligations
- Technically competent HACCP team
- Plotting the CCP through the production process
- Identification with reference to technical
working instructions / methods for CCP - Proof of training / awareness for HACCP at all
appropriate levels
19THE STANDARD REQUIREMENTS
- 2. QUALITY MANAGEMENT SYSTEM
- 2.1 Quality Management System (QMS)
- General Requirements
- Identify the processes needed for the QMS
application - Sequence and interaction of processes
- Determine criteria and methods to ensure
operational control(s) - Resources management
- Monitor, measurement and analysis
- Implementation, planning and improvement
20THE STANDARD REQUIREMENTS
- 2. QUALITY MANAGEMENT SYSTEM
- 2.2 Quality Policy Statement
- Published statement by the Top Management
- Commitment to the Standard requirements
- Appropriate to the purpose of the company
- Commitment to continuous improvement
- Establishing and reviewing quality objectives
- Communicated and understood
- Reviewed for continuing suitability
- Authorised and approved by Top Management
21THE STANDARD REQUIREMENTS
- 2.3 Quality Manual
- Development and maintenance of a formal
documented management system - The manual should be fully implemented and
supported by documented evidence (internal
systems auditing) - Procedures, and where applicable, referring to
specification and methods
22THE STANDARD REQUIREMENTS
- 2.4 Organisational Structure, Responsibility and
Management Authority - Authority and communication at appropriate levels
- Responsibility of the management
- Including clear responsibility of safety, legal,
environmental and quality matters - Technical responsibility of product compliance to
specification - Details of deputy personnel
23THE STANDARD REQUIREMENTS
- 2.5 Management Commitment
- Top management commitment to the QMS
- Importance of meeting customer, statutory and
regulatory requirements - establishing the quality policy
- Ensuring quality and business objectives are
established - Conducting management reviews
- Ensuring the availability of resources
24THE STANDARD REQUIREMENTS
- 2.6 Customer Focus
- Top management shall ensure that the customer
requirements (and expectations) are determined
and are met with the aim of enhancing customer
satisfaction - Customers may include
- The immediate retailer
- The transporter
- The wider community, and consumer
25THE STANDARD REQUIREMENTS
- 2.7 Management Review
- Top management shall ensure that the QMS is
reviewed at regular intervals, consistent with
the management objectives. - Agenda (may include)
- Internal audit
- Customer complaints
- Production issues
- Supplier evaluation of performance
26THE STANDARD REQUIREMENTS
- 2.8 Resource Management
- The company shall determine and provide the
resources needed - To implement and maintain the QMS and continually
improve its effectiveness, and - to enhance customer satisfaction by meeting
customer requirements - To provide financial resources required for HACCP
study and implementation
27THE STANDARD REQUIREMENTS
- 2.9 Internal Auditing
- Programme of audits in consideration of risk
- Senior management approval
- Technical personnel
- Documented results of audit
- Review of audit results
- Corrective and preventive actions
28THE STANDARD REQUIREMENTS
- 2.10 Purchasing
- Purchasing information shall describe the product
to be purchased, including requirements - For approval of product, procedures, processing
and equipment - For qualification of personnel, and
- Quality management system
29THE STANDARD REQUIREMENTS
- 2.10.1 Supplier Performance Monitoring
- The evaluation and selection of suppliers
- Formal evaluation and selection
- Approved supplier list (product impact)
- Product receipt inspection
- Performance monitoring
30THE STANDARD REQUIREMENTS
- 2.10.1 Supplier Performance Monitoring
- Supplier conformance with HACCP
- Traceability of product supplied
- Verification of supplier claims / approvals
- Method and frequency of assessment in
consideration of risk - Supplier audits (programme)
31THE STANDARD REQUIREMENTS
- 2.11 General Documentation Requirements
- 2.11.1 Document Control
- 2.11.2 Specifications
- 2.11.3 Procedures
- 2.11.4 Record Keeping
32THE STANDARD REQUIREMENTS
- 2.11.1 Document Control
- Policy statement
- Quality manual
- Technical procedures and methods
- Administration procedures
- Supporting records and archives
- Reference standards appropriate to the scope
33THE STANDARD REQUIREMENTS
- 2.11.2 Specifications
- Product specification
- Product name
- Customer supplied specifications
- Unique reference / issue number
- Authorisation
- Availability at point of use
34THE STANDARD REQUIREMENTS
- 2.11.2 Specifications
- The company shall ensure that appropriate
specifications exist for - Raw materials (including packaging)
- Completed products (including packaging)
- In-process / part completed (where applicable)
35THE STANDARD REQUIREMENTS
- 2.11.3 Procedures
- Production and administration control
- Procedure / process name
- Customer supplied procedures (and methods)
- Unique reference / issue number
- Authorisation
- Availability at point of use
36THE STANDARD REQUIREMENTS
- 2.11.3 Procedures
- Production and administration control
- Process and performance driven
- Clear, unambiguous and legible
- Issued to appropriate personnel
- Readily accessible at all times
37THE STANDARD REQUIREMENTS
- 2.11.4 Record Keeping
- Information and data generated from the QMS
- Name of record(s)
- Location of record(s) and traceability
- Unique reference / issue number
- Retention period (legal and/or contract
obligation) - Disposal of archive records
38THE STANDARD REQUIREMENTS
- 2.11.4 Record Keeping
- (continued summary)
- In line with procedures
- Records must be legible and genuine
- Safe storage, traceable and retrievable
- Contain appropriate information safety, testing,
legality and product quality - Computer back-up (as applicable)
39THE STANDARD REQUIREMENTS
- 2.11 General Documentation Requirements
- (continued summary)
- Reference standards appropriate to the scope, may
include - Food Safety
- Compositional standards
- Metrology
- Additives
- Lot identification and traceability
- Labelling and packaging information
40THE STANDARD REQUIREMENTS
- 2.11 Documentation Control (continued summary)
- Approved for adequacy prior to issue
- Documents shall be authorised
- Identification and issue status controlled
- Ensure access to documentation at all appropriate
levels - Control of customer / supplier documents
- Obsolete documentation removed from use
- Completed documents and records controlled
41THE STANDARD REQUIREMENTS
- 2.12 Corrective Action
- Investigation of cause
- Assessment of risk
- Corrective actions completed in a timely manner
- Implementation of corrective actions
- Review of corrective actions
- Verification of actions
- Impact - Refer to HACCP
42THE STANDARD REQUIREMENTS
- 2.13 Traceability
- Raw materials
- Work in progress
- Finished goods
- Product identifiable at all stages of production
43THE STANDARD REQUIREMENTS
- 2.13 Traceability (continued summary)
- Raw materials supply
- Component supply
- Packaging supply
- Product re-call at all stages of production
- Appropriate reference documentation
- Reworking operations control
44THE STANDARD REQUIREMENTS
- 2.14 Management Of Incidents and
- Product Recall
- Product re-call at all stages of production
- Appropriate reference documentation
- Testing of the system(s)
45THE STANDARD REQUIREMENTS
- 2.14 Management Of Incidents and
- Product Recall
- Documented incident reporting procedure
- Customer notification
- Documented recall procedure
- Product re-call at all stages of production
- Control of non conforming products
- Corrective and preventive actions
- Verification of recall systems
46THE STANDARD REQUIREMENTS
- 2.15 Complaint Handling
- Documented system for complaints
- Effective management review
- Implementation of corrective and preventive
actions - Complete records of action taken
- Approval of actions
47THE STANDARD REQUIREMENTS
- 3. FACTORY ENVIRONMENT STANDARDS
- 3.1 Location
- Location away from offensive trades
- Maintenance of buildings and infrastructures
- Internal fabric to prevent contamination
- Boundaries clearly defined
- Security of site location
- Authorised movement of personnel
48THE STANDARD REQUIREMENTS
- 3.2 Perimeter Grounds
- Proper drainage
- Waste water
- Contaminated water / effluent
- Storage protected from contamination
- Security of the site boundary
- Regular monitoring (audited)
49THE STANDARD REQUIREMENTS
- 3.3 Layout / Product Flow
- Process flow to prevent contamination
- Operative working space
- Cross contamination (biological / chemical)
- Laboratory facilities (where provided)
- Environmental controls
- Washing of equipment
50THE STANDARD REQUIREMENTS
- 3.4 Fabrication
- 3.4.1Walls
- Should be appropriate design
- Finished surfaces
- Removal of dirt, mould, bacteria
- Consideration when cleaning of corners
51THE STANDARD REQUIREMENTS
- 3.4 Fabrication
- 3.4.2 Floors
- Water / drainage flow away from high risk
- Clean and well maintained
- Should be appropriate design
- Finished surfaces
- Removal of dirt, mould, bacteria
- Consideration when cleaning of corners
52THE STANDARD REQUIREMENTS
- 3.4 Fabrication
- 3.4.3 Ceilings / Overheads
- Clean and well maintained
- Should be appropriate design
- Finished surfaces
- Removal of dirt, mould, bacteria
- Consideration when cleaning of corners
- Falling items / dirt
53THE STANDARD REQUIREMENTS
- 3.4 Fabrication
- 3.4.4 Windows
- Clean and well maintained
- Should be appropriate design
- Prevention of ingress of pests
- Glass should be protected from breakage
- Use of glass should be avoided
54THE STANDARD REQUIREMENTS
- 3.4 Fabrication
- 3.4.5 Doors
- Clean and well maintained
- Should be appropriate design
- Prevention of ingress of pests
- Use of glass should be avoided
- Use of curtains
- Secure
55THE STANDARD REQUIREMENTS
- 3.4 Fabrication
- 3.4.6 Lighting
- Should be adequate to carry out the function
- Should be appropriate design
- Glass (bulb, strip lights) should be protected
- EFK tubes should be protected
- Procedures for replacement of lighting
- Glass management
56THE STANDARD REQUIREMENTS
- 3.4 Fabrication
- 3.4.7 Air Conditioning / Ventilation
- Should be appropriate design
- Adequate ventilation
- Dust and fume extraction
- Use of filters
- Air movement monitoring
57THE STANDARD REQUIREMENTS
- 3.4 Fabrication
- 3.4.8 Services
- Use of water, ice, and steam supply
- Cleaning according to source
- Monitored to prevent risk of contamination
58THE STANDARD REQUIREMENTS
- 3.5 Equipment
- Positioned to give access
- Ease of cleaning
- Properly specified and commissioned
- Planned maintenance programmes
- Working use and set-up instructions
- Operate to legal and safety requirements
59THE STANDARD REQUIREMENTS
- 3.6 Maintenance
- Planned maintenance programme
- Technically competent personnel
- Outside Contractors
- Manufacturers instruction (where applicable)
- Breakdown procedures
60THE STANDARD REQUIREMENTS
- 3.7 Staff Facilities
- Changing facilities
- Work-wear appropriate to the task for staff and
visitors - Suitable equipment
- Hand-washing / shower facilities
- Toilet, smoking and catering facilities
- Personal lockers and food controls
61THE STANDARD REQUIREMENTS
- 3.8 Physical Chemical Contamination Risk
- Appropriate and secure storage areas
- Handling procedures and personnel training
- Elimination (where possible) of wood, glass,
clear plastics in the raw material process areas - Glass and hard plastic register
62THE STANDARD REQUIREMENTS
- 3.9 Housekeeping Hygiene
- Cleaning schedules
- Approved cleaning instruction / methods
- Use of approved cleaning detergents
- Cleaning practices to minimise the risk of cross
contamination - Monitoring of effectiveness
63THE STANDARD REQUIREMENTS
- 3.10 Waste / Waste Disposal
- Minimise accumulation of waste in production
- Disposal must meet legal requirements
- Use of licensed waste contractors
- Use of appropriate containers (closed / covered)
- Aware of waste packaging regulations (obligation
towards recovery / recycling initiatives)
64THE STANDARD REQUIREMENTS
- 3.11 Pest Control
- Use of approved contractors for pest control
- Records and location of pest control baits
- Correctly sited E.F.Ks
- Use of screens on drains
- Minimise waste materials on site
- Raw materials inspected for pest infestation
- Baits identified on plan
65THE STANDARD REQUIREMENTS
- 3.12 Transport
- All vehicles must be fit for purpose
- Good repair and hygienic
- Part of a cleaning programme
- Refrigeration controls must be to specification
- In transit breakdown procedures (product
controls safety, legality and quality) - Maintenance programme
66THE STANDARD REQUIREMENTS
- 4. PRODUCT CONTROL
- 4.1 Product Design / Development
- New products shall under-go production trials
- Processes reviewed to ensure legally safe
- Product testing and verification of methods
- Shelf life cycles to be confirmed / verified
- Use of storage conditions detailed
- Plot new processes (HACCP)
67THE STANDARD REQUIREMENTS
- 4.2 Product Packaging
- Minimise risk of contamination from packaging
- Confirm packaging conforms to specification
- Food safety legislation
- Use of metal staples / other items
- Packaging stored separate from raw materials
68THE STANDARD REQUIREMENTS
- 4.3 Product Analysis
- Confirm product conforms to specification
- Test results reliable
- Use of accredited test laboratory
- Technically qualified personnel
- Records of results and verification
69THE STANDARD REQUIREMENTS
- 4.4 Segregation
- Prevention of cross-contamination
- In-process controls
- raw meat
- cooked meat
- packaging
- waste materials
70THE STANDARD REQUIREMENTS
- 4.5 Stock Rotation
- Identification of product location
- Unique stock / item number
- Details of shelf life
- Product labelling (supplier traceable)
- Internal audit programme
71THE STANDARD REQUIREMENTS
- 4.6 Metal Detection / Foreign Body Detection
- Form a part of the HACCP documentation
- Appropriate to the nature of the product
- Minimise the risk
- Procedures for equipment use
- Maintenance of equipment
- Isolation and quarantine procedures
- Form a part of the internal audit programme
72THE STANDARD REQUIREMENTS
- 4.7 Product Release
- Final product inspections / tests
- Records of all inspections
- Authorised personnel only (procedures)
- Use of despatch documentation
73THE STANDARD REQUIREMENTS
- 4.8 Control of Non-Conforming Product
- The company shall deal with non-conformity using
one or more of the following methods - Reject, remove and destroy product
- Authorising product use by concession
- Taking action to preclude product original use
- Product correction, verified to specification
74THE STANDARD REQUIREMENTS
- 4.8 Control of Non-Conforming Product
- (continued summary)
- Identification of product
- Segregation of product
- Total rejection controls
- Re-working and concessions
- Product disposal (confirmation)
- Records for all actions
75THE STANDARD REQUIREMENTS
- 4.8 Control of Non-Conforming Product
- (continued summary)
- Final product inspections / tests
- Records of all inspections
- Authorised personnel only (procedures)
- Use of despatch documentation
76THE STANDARD REQUIREMENTS
- 5. PROCESS CONTROL
- 5.1 Temperature / Time Control
- Where applicable
- Control of raw materials
- Control of work-in-progress
- Environmental controls
- Use of alarms in case of temperature failure
- Procedures for all areas
77THE STANDARD REQUIREMENTS
- 5.2 Quantity Control
- EU (UK) legal requirements
- Quantity (average / minimum)
- Measurement / weight (calibration)
- Importers shall control packaging in line with EU
regulations - Inspection and testing records
78THE STANDARD REQUIREMENTS
- 5.3 Equipment Process Validation
- Validation of
- Process methods (HACCP)
- Product formulation (Specification)
- Use of equipment (calibration and maintenance)
- Regular review (internal auditing)
- Control of records
79THE STANDARD REQUIREMENTS
- 5.4 Calibration and Control of Measuring and
Monitoring Devices - Traceable calibration of all test and measurement
equipment, including - Scales and weigh bridges
- Temperature
- Control of equipment calibration / test records
80THE STANDARD REQUIREMENTS
- 5.5 Specific Handling Requirements
- Prevent cross-contamination (all areas)
- Example
- Meat / vegetarian products
- Peanuts anaphylactic shock
- Use of handling methods / procedures
- Use of customer specified procedures, as required
under contract
81THE STANDARD REQUIREMENTS
- 6. PERSONNEL
- 6.1 Personal Hygiene controls
- Raw material handling
- Processing
- Packing
- Storage areas
82THE STANDARD REQUIREMENTS
- 6.1 Personal Hygiene controls
- Finger nails
- Jewellery
- Exposed skin / cuts
- Smoking / eating
- Hand cleaning
- Perfume / after-shave
83THE STANDARD REQUIREMENTS
- 6.2 Medical Screening
- Induction training / contract
- Reporting procedures for infections, etc.
- Visitors / contractors, where appropriate shall
be medically screened prior to visiting
production process areas
84THE STANDARD REQUIREMENTS
- 6.3 Protective Clothing
- Hair covered to prevent contamination
- Appropriate footwear used
- Appropriate clothing (spares)
- Approved laundry services (contractors)
- Available for visitors
85THE STANDARD REQUIREMENTS
- 6.4 Training
- Induction training supervision
- Personnel training at all levels to include
contractors and temporary staff - Review of training procedures
- Use of equipment
- Health and safety
- Personnel (personal) records
- Training records
86 87PROTOCOL
- Certification Bodies
- Only Accredited Certification bodies to EN45011
with the appropriate scope, shall carry out
evaluations against the BRC Standard, and issue
certificates, or - Until 31st May 2003, to include those
Certification Bodies actively seeking
accreditation to EN45011 - The BRC requirement was EN 45004
88PROTOCOL
- Before the initial evaluation
- The Supplier is required to review the BRC
Standard - Make any necessary amendments or improvements to
its operation and systems - Provide background information on the site
concerned, by completion of a pre-evaluation
questionnaire or pro-forma information sheet.
89PROTOCOL
- The scope of the evaluation shall be defined
between the Supplier and the Certification Body - The scope shall be identified in the evaluation
report and any certificate of inspection. - The Supplier may contract the Certification Body
to evaluate matters beyond the scope of the BRC
Standard, but no relevant elements of the BRC
Standard shall be omitted.
90PROTOCOL
- Any additions to evaluation scope may or may not
fall within the scope of the Certification Bodies
accreditation - A supplier may be advised to check with either
the Certification Body or UKAS before contracting
such additional work
91PROTOCOL
- Evaluation Procedures
- Duration of evaluations will be dependant upon a
number of factors but due regard must be given
to - size of the site
- the types of processes to produce and store
product - number of product lines
92PROTOCOL
- Evaluation Procedures (continued)
- the number of employees related to food
- (food safety)
- size of random sampling
- the number of non conformances as recorded in
previous evaluation
93PROTOCOL
- At all evaluations there are four elements, which
shall be carried out - opening meeting
- review of quality systems and procedures
- site inspection
- closing meeting
94PROTOCOL
- Major
- There is substantial failure to meet the
requirements of a statement of intent and any
mandatory clause of the Standard. - Depending upon the level of certification sought
(Foundation or Higher), the mandatory clauses
will differ. - The mandatory clauses for Foundation Level are
all those listed in the Foundation Level column. - The mandatory clauses for Higher Level are as for
Foundation Level, and in addition, all the
clauses in the Higher Level column.
95PROTOCOL
- Minor
-
- This is where absolute compliance to the
statement of intent and a mandatory clause has
not been demonstrated, but on the basis of
objective evidence the conformity of the
products safety and legality is not in doubt
96PROTOCOL
- Recommendation
- There is a failure to meet a recommendation of
good practice. -
97PROTOCOL
- The report contains the following sections
- evaluation details
- evaluation summary- overview of performance
- details of non-conformance and corrective action
plan - detailed evaluation report
98THE STANDARD REQUIREMENTS