FD05 STATEWIDE RESURFACING PROGRAM OVERVIEW Diana Radcliffe, TEBM, Roadway Preservation, Div of Main - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

FD05 STATEWIDE RESURFACING PROGRAM OVERVIEW Diana Radcliffe, TEBM, Roadway Preservation, Div of Main

Description:

DEFINITION- A STATEWIDE THIN ASPHALT MAINTENANCE PROGRAM ... DERRICK CASTLE, BRANDI MITCHELL, DIANA RADCLIFFE, WAYNE SIMPSON, AND YOUR CONSTRUCTION LIASION ... – PowerPoint PPT presentation

Number of Views:101
Avg rating:3.0/5.0
Slides: 15
Provided by: cot55
Category:

less

Transcript and Presenter's Notes

Title: FD05 STATEWIDE RESURFACING PROGRAM OVERVIEW Diana Radcliffe, TEBM, Roadway Preservation, Div of Main


1
FD05STATEWIDE RESURFACING PROGRAMOVERVIEWDia
na Radcliffe, TEBM, Roadway Preservation, Div of
Maintenance
2
FD05-RESURFACING PROGRAM
  • DEFINITION- A STATEWIDE THIN ASPHALT MAINTENANCE
    PROGRAM DESIGNED TO SUSTAIN THE SURFACE CONDITION
    OF THE PAVEMENT. It is NOT BETTERMENT or REHAB
    or RECONSTRUCTION.
  • IT IS 1 Inch TO 1.25 Inches OF ASPHALT SURFACE
    WITH MINOR LEVELING AND WEDGING OF PAVEMENT TO
    MAINTAIN DRAINAGE AND SECTION. (1.5 in D1, 2,
    and 3)

3
REMINDERS
  • FD05 projects let in Spring are deferred money.
    Money not available until July 1.
  • FD05 Projects will begin letting in MARCH THIS
    YEAR
  • PROJECTS WILL BE SPREAD OVER 3 TO 4 LETTINGS
  • We have sent 57 proposals to Construction
    Procurement for March letting

4
Reminders continued
  • We let projects according to District Ranking.
    DR 1 is let before DR 20. When your District
    allotment runs out, we stop letting projects for
    your District.
  • Remember we have a Limited FD05 budget
  • There are ALWAYS MORE NEEDS than funds

5
REMINDERS CONTINUED
  • More change orders equals less miles of road
    resurfaced!!!!
  • If change order is needed, contact CO
    Construction Liaison, they will contact me for
    funding approval
  • FOR FE01 projects, contact District TEBM to make
    sure money is in the budget for change orders.

6
2009 DW STRIPING CONTRACTS
7
Reminders
  • HAVE A PRECONSTRUCTION MEETING EACH YEAR FOR THE
    STRIPING CONTRACT PRIOR TO THE START OF SEASON
  • GIVE THEM AN UPDATED LIST OF ROADS (TAKING OUT
    APPROVED FD05 LIST)
  • REVIEW SAFETY AND TRAFFIC CONTROL ISSUES AT THIS
    MEETING

8
INVITE US TO PRE-CON
  • PLEASE MAKE SURE TO INVITE MATERIALS AND
    MAINTENANCE TO THE PRE-CONSTRUCTION MEETING FOR
    STRIPING THIS YEAR AND EVERY YEAR
  • DERRICK CASTLE, BRANDI MITCHELL, DIANA RADCLIFFE,
    WAYNE SIMPSON, AND YOUR CONSTRUCTION LIASION

9
STRIPING CHANGES
  • We let 6 projects in Sept and 6 projects in
    October, 2008
  • Contractor is buying 2 new Retroreflectometers
    for each District each year (1st 2 years of
    contract)
  • Increased minimums for passing Retroreflectivity
  • Increased minimum values for bonus
  • Added 6 inch Durable Paint (HD21) bid items to
    contracts for 1st time

10
  • WE CHANGED APPLICATION RATE TO MANUFACTURERS
    RECOMMENDATION
  • MATERIALS REVISED THE PAINT SPECIFICATION
  • SO WITH ALL THE CHANGES IN THE CONTRACTS, PLEASE
    TRY TO BE DILIGENT WITH ALL STRIPING CONTRACTS SO
    WE GET A CONSISTENT PRODUCT.

11
TRAINING AND INSTRUMENTS
  • MATERIALS WILL BE DOING TRAINING FOR
    REFLECTOMETERS THIS WINTER AND SPRING. GET PEOPLE
    TRAINED WHO WILL BE INSPECTING STRIPING
    CONTRACTS, EVEN RENT-A-TECHS!
  • OLD REFLECTOMETERS MUST BE CALIBRATED AND
    MAINTAINED EACH YEAR. We have a PRICE CONTRACT
    (MA) THRU DIV OF PURCHASES FOR THIS SERVICE.

12
USED Guardrail
  • PLEASE MAKE SURE THE CONTRACTORS ARE BRINGING
    GUARDRAIL BACK TO FRANKFORT or COUNTY MAINTENANCE
    FACILITY
  • FORM FOR THE CONTRACTOR TO SHOW HE DELIVERED IT
    IS AVAILABLE
  • We may start limiting the days that guardrail may
    be delivered to Frankfort due to limited
    manpower, but not sure yet

13
(No Transcript)