National Cooperative Highway Research Program (NCHRP) Research for Improved Highway Operations and Maintenance - PowerPoint PPT Presentation

About This Presentation
Title:

National Cooperative Highway Research Program (NCHRP) Research for Improved Highway Operations and Maintenance

Description:

National Cooperative Highway Research Program (NCHRP) Research for Improved Highway Operations and Maintenance Report to the AASHTO Highway Subcommittee on Maintenance – PowerPoint PPT presentation

Number of Views:93
Avg rating:3.0/5.0
Slides: 14
Provided by: transport72
Category:

less

Transcript and Presenter's Notes

Title: National Cooperative Highway Research Program (NCHRP) Research for Improved Highway Operations and Maintenance


1
National Cooperative Highway Research Program
(NCHRP) Research for Improved Highway
Operations and Maintenance
  • Report to the AASHTO Highway Subcommittee on
    Maintenance
  • Louisville, Kentucky, July 2011

1
2
NCHRP- National Cooperative Highway Research
Program
  • An AASHTO program sponsored by state DOTs
  • Started in 1962
  • Annual funding 40 million/year
  • Contributes to advancements in all aspects of
    highways
  • 8 fields of research (Administration, Planning,
    Design, Materials and Construction, Soils and
    Geology, Maintenance, Traffic, and Special
    Projects
  • 25 Subject areas (e.g., economics, forecasting,
    pavements, bituminous materials, mechanics and
    foundations, snow and ice control, maintenance of
    ways and structures, equipment, illumination and
    visibility, and special projects)

3
NCHRP Goal-Oriented Research
  • Responds to state DOT needs DOTs and AASHTO
    committees propose research topics SCOR selects
    projects.
  • Ensures applicability of the results state DOTs
    and other sectors of the highway industry
    participate in monitoring the research.
  • Results are published by NCHRP (reports, digests,
    synthesis, CD-ROMs, and Web documents) or
  • by AASHTO (guides/manuals, specifications, and
    test methods), and often adopted by state DOTs
    and other organizations.

4
Scope of NCHRP Projects Related to Maintenance
  • Pavement Maintenance
  • Snow and Ice Control
  • Bridges and Structures
  • Roadside
  • Maintenance Equipment
  • Workforce Development
  • Etc.

5
Three Types of NCHRP Projects(of Interest to the
AASHTO Highway Subcommittee on Maintenance)
  • Research Projects
  • Selected by SCOR once/year (March).
  • Research for AASHTO Standing Committee on
    Highways (20-07 projects)
  • Selected by NCHRP Project Panel SP20-07
    twice/year (May and October).
  • Synthesis of Information Related to Highway
    Problems
  • Selected by NCHRP Project Panel SP20-05
    once/year (May).

6
Publication of Completed Projects
  • ? Published by AASHTO
  • ? Available on AASHTO Website
  • ? Published in the NCHRP report series (as
    an NCHRP report)
  • ? Summarized and made available on NCHRP
    Website
  • ? Published in the NCHRP synthesis series (as
    an NCHRP synthesis)

7
Published by AASHTO
  • ? AASHTO Maintenance Manual for Roadways and
    Bridges (2007)
  • ? AASHTO Guide for Snow and Ice Control (1999)
  • ? AASHTO Guidelines for the Selection and
    Application of Warning Lights on Roadway
    Operations Equipment (2009)

8
Recently Published NCHRP Reports
  • ? A Framework for a National Database System
    for Maintenance Actions on Highway Bridges
    (NCHRP Report 668)
  • ? Manual for Emulsion-Based Chip Seals for
    Pavement Preservation (NCHRP NCHRP Report 680)
  • ? Determining Highway Maintenance Costs (NCHRP
    Report 688)
  • ? Decision Making for Outsourcing and
    Privatization of Vehicle and Equipment Fleet
    Maintenance (NCHRP Report 692)

9
NCHRP FY 2012 - Summary
  • Programmed for FY 2012
  • 18 Continuation projects (11.390 million)
  • 44 New projects (19.880 million)
  • 2 Syntheses (0.200 million)
  • Total 54 projects (31.470 million) in 18 problem
    areas (bridges, maintenance, materials,
    pavements, etc.)
  • 3 Contingent projects (0.800 million)
  • 2 New projects relevant to maintenance/preservatio
    n

10
NCHRP FY 2012 Selected Projects
  • Project 14-27 Guidelines for a Comprehensive
    Preventive Maintenance Plan for tunnel Owners and
    Operators
  • Project 14-28 Improved Corrosion Inspection
    Techniques for Ducted Strands for Cable Stayed
    and Post-Tensioned Concrete Bridges
  • Project 20-07/Task 318 Update Chapter 8, Winter
    Operations and Salt, Sand and Chemical
    Management of the manual produced by the Center
    for Environmental Excellence

11
NCHRP FY 2012 Program
  • March 22-23, 2011 FY 2012 projects selected
  • April 2011 Program announcement
  • April 29, 2011 Solicit panel nominees
  • National Academies acceptance
  • Panel formation
  • July-December 2011 1st and 2nd panel meetings
    (develop RFPs and select agencies)
  • February 1, 2012 FY 2012 authorization
  • February-March 2012 Contracting

12
NCHRP FY 2013 Program
  • July 1, 2011 Solicitation of FY 2013 problem
    statements
  • Sept. 15, 2011 End date for problem statements
  • Nov. 17, 2011 Respond to submitters
  • December 1, 2011 End date for submitter comment
  • January 3, 2012 Mail candidates to SCOR/RAC
  • February 20, 2012 SCOR/RAC ballots due
  • March 7, 2012 Ballot summary report to SCOR
  • March 20-21, 2012 SCOR meeting/project selection

13
More Information
  • Available on Cooperative Research Programs" (CRP)
    WWW Homepage
  • http//www.trb.org .. NCHRP
  • Specific information or questions, contact
  • Amir N. Hanna
  • ahanna_at_nas.edu
  • 202/334-1432
Write a Comment
User Comments (0)
About PowerShow.com