Petroleum Tank Technologies (PTT) Underground Petroleum Storage Tank (UPST) FRP Lining - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

Petroleum Tank Technologies (PTT) Underground Petroleum Storage Tank (UPST) FRP Lining

Description:

Petroleum Tank Technologies (PTT) Underground Petroleum Storage Tank (UPST) FRP Lining Leakage from an Underground Petroleum Storage Tank poses a significant risk to ... – PowerPoint PPT presentation

Number of Views:253
Avg rating:3.0/5.0
Slides: 15
Provided by: Sun61
Category:

less

Transcript and Presenter's Notes

Title: Petroleum Tank Technologies (PTT) Underground Petroleum Storage Tank (UPST) FRP Lining


1
Petroleum Tank Technologies (PTT)Underground
Petroleum Storage Tank (UPST) FRP Lining
2
Background
  • Leakage from an Underground Petroleum Storage
    Tank poses a significant risk to
  • - Persons,
  • - Property,
  • - Environment, and
  • represents a major liability for the occupier /
    owner of the premises

3
Risk
  • Litigation
  • Licence
  • Fines
  • Reputation
  • Sales
  • Environment Remediation Cost
  • Loss of Strategic Site

4
Risk
  • Ageing single wall UPSTs represent an increasing
    environmental and financial risk
  • ---------------------------------
  • Tanks refurbished in Japan using theUV Curable
    FRP Lining have not had a single warranty claim
    many have been lined for more than 10 years

5
(No Transcript)
6
Benefits of UV Cured FRP Lining
  • Extends the life of the UPST by at least 20 years
    Guaranteed
  • Suitable for Ethanol storage up to 100 by the
    standard use of a final coating of Novolac.
  • Permanent manhole makes futurecleaning and
    inspections simple

7
Benefits of UV Cured FRP Lining
  • Automatic inventory monitoring can beestablished
    via the manhole (ATG system)
  • Service Station continues to operateduring the
    tank relining
  • Average tank repaired in a week

8
Benefits of UV Cured FRP Lining
  • Leaking tanks can be repaired - EPA guidelines
    must be met, - Site of the tank is
    critical, - Strict environmental
    assessment process is followed.

9
Work Procedure
  • Install temporaryenclosure
  • Empty fuel tank
  • Cut concrete
  • Cover sludge with detergent mix

10
Work Procedure
  • Purge Tank, reducing the atmosphere to zero
    LEL, and zero VOCs.
  • Cut access hole in tank
  • Tank is cleaned
  • Waste disposed of as per regulations

11
Work Procedure
  • Tank is inspected, ultrasonic thickness test.
  • Testing is over entire internal surface, in a
    grid of 50 cm. squares.
  • Assessed for suitability for repair

12
Work Procedure
  • FRP Lining is applied
  • Sheets overlap
  • Joins are sealed
  • FRP Lining is cured by UV light

13
Work Procedure
  • Ethanol resistant coating applied
  • Tank is pressure tested at 35 KPa
  • Reinforcement and concrete is replaced
  • Manhole cover is fitted

14
Petroleum Tank Technologies Underground
Petroleum Storage Tank (UPST) FRP Lining
  • Cost Effective
  • Minimum loss of Retail Sales
  • 20 Year Guarantee
  • Minimal Duration or Disruption
  • Safe Procedure
  • Competent Operators
  • Professional Service