Sand / Shot blasting process created substantial waste, downtime and tube damage. ... result of Tube Tech's input, could be as much as $200 million dollars. ... – PowerPoint PPT presentation

Number of Views:103
Avg rating:3.0/5.0
Slides: 28
Provided by: ianh3
Category:
Tags: harcourt | port

less

Transcript and Presenter's Notes

Title: Port Harcourt


1
(No Transcript)
2
Innovating Solution Which Challenge Convention
3
Global Technologists in De-scaling
and Inspection.
Substantially improving downtime and
performance
4
De-scaling, Unblocking, Inspection
  • Any size or type of Heat exchanger
  • Any size or type of pipe/pipeline
  • Any size or type of vessel
  • Any size or type of surface
  • any deposit!

5
Accreditations / Achievements
  • Zero lost time accident record in 14 years /
    ROSPA
  • TCS Brunel University
  • High Pressure Water Jetting Association
  • V.C.A. (European safety council)
  • S.I.R. (European A.H.P.W.J. equivalent)
  • I.I.P. (Investors in people)
  • ISO 9000
  • First Point Assessment

6
Mechanical
Cleaning
Inspection
Re -design
7
(No Transcript)
8
  • CLEAN OF 400 m G.R.E. PIPELINE
  • Traditionally Downtime limitation of 4 days
  • Traditional companies quoted minimum 8 days as
    only 200 bar water pressure allowed. Danger of
    damage to soft pipe material. Access from one end
    only.
  • Tube Tech 4 days
  • Modified, Hydrowhip performs up to 1 km lengths
    Bespoke combination of 5 systems adopted as fall
    back due to criticality plus CCTV.
  • Benefits 2 million

9
  • BLOCKED CRUDE OIL LINE
  • Traditionally
  • 18 days, H.P.J. Substantial waste costs,
  • Slow. Cold cut every 100 m
  • Tube Tech
  • 5 days, DryMole , Cut every 1000 m,
  • 98 of oil recovered
  • Benefits 300,000

10
  • FURFURAL HEAT EXCHANGERS
  • Traditionally
  • Re-tube, UHP or Shot blasting. 60 cleanliness.
    Profile leaves keyed surface. Hence re-tube is
    cheaper option.
  • Tube Tech
  • 100 clean Rotaflex V TM. Descales and polishes
    tube surface. No key, 99 cleanliness.
  • Benefits
  • No Re-tube necessary

11
  • EO2 TUBULAR CATALYST REACTOR
  • Traditionally Est. 60 days
  • Tickling, rods and hammer, pneumatic road drills,
    turbines.. Sand / Shot blasting process created
    substantial waste, downtime and tube damage.
  • Tube Tech 10 days
  • In house designed self loading Softdrill.
    Unblocks, de-scales and polishes. Very quick.
    Simultaneous deposit extraction. No blasting
    process needed.
  • Benefits 4 million

12
FUSED VERTICAL EVAPORATOR Traditionally 6
days Manual single H.P.J. Semi rigid lancing.
High risk of hydraulic action. 70 clean.
Operator fatigue Tube Tech 2 days 2 4
lances simultaneously. Automated. Patented
combined cleaning head. Safer, Less waste. 100
clean. Benefits 300,000
13
BASIC HEAT EXCHANGER CLEANING ? Traditionally

Manual / Auto multi lancing in cleaning bay.
Non rotational lances creates Tramlines. High
volume of waste. Difficulty with blockages   ?
Tube Tech 4 x faster, In situ cleaning
possible, 5 x less water 100 . No high pressure
water involved. 100 tube coverage ? Benefits
Downtime saving. Cheaper. Higher standard of
clean. Safer. Plant productivity  
14
  • AC FIN FAN CONDENSERS (INTERNAL CLEANING)
  • Traditionally 5 days
  • HPJ , 1000 bar. waste falls to ground, Dangerous,
    Operator fatigue, Smeared deposit extends
    cleaning time, Operator dependant. Slow.
    Cleaning standard limited. Hydraulic action risk.
  • Tube Tech 2 days
  • Modified freelance Only SHP spinning system
    available, Automated process, 4 x Faster, 100
    safer. IRIS Cleanliness guaranteed. Simultaneous
    inspection capability. Waste contained.
    Polishing improves heat transfer, reduces key
    factor.
  • Benefits 15,000 per day

15
FURFURAL HAIRPIN EXCHANGERS TraditionalHair
pin bends never cleaned, could not unblock
bends. 6 days. Bundle pulled Tube Tech3 days
Micro flex, Usound , 100 of U Bends cleared,
polished. Tubes polished, longer run times,
increased vacuum Benefits 6 gt 3 days, No
cranes, scaffolding. Increased production, longer
run times
16
  • VCFE / TEXAS TOWER
  • Traditionally 10 days
  • HPJ Lancing. Risk due to confined space working.
    Very Slow. 60 cleanliness
  • Tube Tech 4 days
  • Bespoke Safetyfeed, Patented Ceramic cleaning
    heads. Simultaneous tube inspection
  • Benefits 3.5 m

17
  • POLYMER VESSEL
  • Traditionally 21 days
  • H.P.J, Chipping hammers, Road drills, Solvents
  • Tube Tech 3 days
  • Fast Ice , WysperJet, Remote and robotic
    manipulator. No vessel entry
  • Benefits 150,000

18
AC FIN FAN CONDENSERS (External clean)
Traditionally 28 days Rope, wire access,
safety harness, scaffolding. Highly dangerous,
H.P.J. distorts aluminium fins, deposit
compacted, 80 cleanliness Tube Tech 10
days Far safer, no rope, no wires, no scaffold,
no safety harness required. Cleaned entirely from
gantry level. No fin damage. Tube nest usound
tank,100 cleanliness. Benefits 2.75 to 5 MW
19
  • FLARE LINE CLEANING
  •  
  • Traditional
  • Cold cutting required. H.P.J. hoses with limited
  • Reach. Waste volume. Time consuming
  •   
  • Tube Tech
  • Dry pig/drift technology. 1 to 16 branches
  • Cleaned dry. No cold cutting necessary.
  • Class 1 zoned inspection equipment
  • Benefits
  • No secondary waste. Reduced plant
  • downtime. No cold cutting or waste costs.
  • Fully cleaned and inspected

20
  • SURFACE PREPARATION
  •  
  • Traditionally
  • Open Shot blasting, Dusty, spark hazard, Re
    blasting impregnates Chloride salts, coating
    frequency every 2 years.
  • Twin coat Epoxy 48 hrs cure time
  •  
  • Tube Tech
  • Non abrasive methods, no spark hazard, negligible
    salt levels.
  • Benefits
  • TT permacoat 30 seconds cure time, Longer
    periods between paint coats

21
  • USX FURNACE TUBES x 14
  • Traditionally 1 day per pipe
  • Using 20,000 psi HPJ, flexible hose,which can
    get stuck. Tramlining caused by static jet. 80
    cleanliness.
  • Tube Tech 1 hr per pipe
  • WysperflexTM Rotary SHP nozzle,and mechanical
    combination withbespoke guidance system.
    Plussimultaneous video inspection.
  • Benefits 3,000 Per hr

22
  • DECOKING OF BLOCKED FURNACE TUBE
  • Traditional
  • No known cleaning system. Re tube
  • Tube Tech
  • Wysperprobe removes blockage in minutes back
  • to parent metal
  • Benefits
  • Huge productivity improvement, No costly
  • replacement, Short downtime.

23
Solutions, guaranteed to be
  • Safer
  • Faster
  • Cleaner
  • In situ
  • Online
  • Environmental
  • Most Cost Effective

24
BENEFITS SUMMARISED
1. Improved reliability 2. Improved
efficiency 3. Longer run times 4. Higher
profitability
25
What clients think of us !
  • ..Tube Tech were able to provide a comprehensive
    range of cleaning and inspection skills to
    complete the challenging work scope within
    timescales and standards that no other global
    contractor was able to match as a result we have
    awarded a 3 to 5 year term for these
    works
  • Andrew Jamieson, c.o. Elf, Shell, Agip
  • Managing Director/Chief Executive
  • Nigeria LNG Limited, Nigeria
  • Shut Down decontamination group.
  • Dated July 2002

26
What Clients think of us!
I would estimate the financial Benefits to Shell,
as a direct result of Tube Techs input, could be
as much as 200 million dollars. I cannot
emphasise enough, the value of encouraging a
working relationship with an innovative Company
such as Tube Tech International Ltd
Wim Bond , Team Leader Shell Global Solutions,
Amsterdam Shut Down decontamination group.Dated
August 2001
27
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com