Title: Eco NW Sustainable Construction Workshop 6th September 2005 Andrew Thomas Centre for Construction Innovation NWDA Construction Best Practice hub
1Eco NW Sustainable Construction Workshop6th
September 2005Andrew ThomasCentre for
Construction InnovationNWDA Construction Best
Practice hub
2CCI Support..
Sector Skills Productivity Alliance Construction
SSPA RENEW Regeneration arm of NWDA HMRF
Pathfinders NWDA NWDA Grant Recipients Mancheste
r Construction Initiative Merseyside Construction
Partnership Local Authorities Many Contractors,
Designers, Suppliers Best Practice hub for Clubs
NW Construction Cluster Regional Centre of
Procurement Excellence Broadband and
Visualisation Projects Demonstration
Projects Innovation Forum ..and others
ALL Professional Institutions
3Some of the Reports..10 years of Sector
related History
- Constructing the Team Latham 1994
- Rethinking Construction Egan 1998
- Achieving Excellence Treasury 1999
- Building a Better Quality of Life DETR
2000 - Better Public Buildings CABE/PM 2000
- Modernising Construction NAO 2001
- Accelerating Change Strategic Forum 2002
- National Procurement Strategy ODPM 2003
- Egan Skills Sustainable Communities ODPM 2004
- Gershon Efficiency review Treasury 2004
4What is NOT Sustainable Construction ?
- Using over 420 million tonnes of material
resources, - and converts 6,500 hectares of land from rural
to urban use each year. - 13 million tonnes of construction and demolition
waste is material delivered to sites but never
used. - Generating 90 million tonnes of construction and
demolition waste every year, - That is 3 times the waste produced by all UK
households combined. - Consuming 10 of national energy in the
production and transport of construction products
and materials - Building services accounts for 50 of the UKs
emissions of carbon dioxide. - Creating 21 of the hazardous waste in the UK.
5Bad Action Bad Consequences
- Climate change is making flood management an
increasingly important factor in deciding where
to locate new development. - Presently,
- 1.85 million houses
- 185,000 commercial properties
- are at risk from flooding
- figures that are likely to increase under
planned future development. without considering
climate change.
6Construction Industry Conclusions
- Service Business often component Assembly
- Demand Oriented
- Legislatively driven
- Historic one off Project mentality
- Reactive rather than Proactive
- Mr Fix it Problem Solving approach
- Often treats the symptom and not cause
7The NW regional AQ picture
Huge regional variances in AQ performance Urban
Hot spots. Rural fall out areas of
consequences Agency Policy and Govt Policy
driving towards Sustainability in Design and
Action. Sub regional URCs ( Blackpool Salford
others) an important vehicle to deliver
Policy Agency require measured performance on
own projects and funded projects.. Seeking
ongoing sustainable improvements and to
reduce negative impacts
8NWDA Tools of Change
- Education Brochures, leaflets, awareness
raising, Sustainability NW, Event involvement,
EnWorks provision, Sustainability NW and others - Motivation Awards sponsorship, recognition of
Best Practice, Acknowledgement of Excellence,
Competitive advantage under Quality selection and
performance based work awards. - Lead by Example be seen to do, as you expect
others to do for and with you - Expectation It is how we do business, if you
dont do, then you wont get - Conditionality of behaviour If you say you do,
and then dont.there will be consequences and
clawback - Measurement .and consequence how you measure
will be prescribed and in a standard form. - Review of strategy and actions to accommodate
change RES review taking place during 2005
please involve yourself and inform the future
9Mystified by frameworks ?
Framework Toolkit www.ivisual.co.uk/ce
Benefits Economies of Scale Buying
Leverage Standard solutions Continuity
Integration Collaboration of Supply Chain
Efficiency gains
10OGC Minimum Standards in Contract
- OGC are establishing basic requirements for all
construction projects - Currently in review stage for Summer 2005
publication current list - Basic environmental standards
- Considerate Constructors
- CSCS cards for all site personnel
- And others
NWDA establishing design and sustainability
review panels, Green Design Guides, Enhanced
Project Appraisal processes all reflecting
sustainability issues, Conditional minimum
standards, use of KPIs and on grant funded
projects. Explicit Sustainability measure and
targets piloted in project funding contracts -
Project unity to be rolled out on ALL future
projects
11On Line KPI Engine Standardising measurement
and easier data collection
Measured performance use of Environmental
Indicators
12Improving Public Services Through Better
Construction Development
- Looking for 2.5 improvement in efficiency 2005/
6 - Key Recommendations
- Better long term planning (5 year horizons)
- Leadership and cross departmental activity
- Transparent procurement and influencing supplier
behaviours - Use of Gateways
- Sustainability Action Planning
- Use of WLC/ WLV data
- E Govt and E procurement
Benefits cashable and non cashable Adoption of
sustainability Checklist learning from
SEEDA Gershon / Efficiency review, plan and
targets
13Improving Public Services Through Better
Construction
- Use of benchmarking and performance to keep
competitive tension in long term arrangements - Collaborative contracts (ECC mentioned) and fair
pay arrangements - Post-completion performance
- Energy efficiency
- Combine construction activity across depts
- Support for infrequent clients
- Identify and support good practice
Minimum BREEAM Very Good on all NWDA projects,
sustainability checklist, Quality Based
selection on frameworks, Regional Transport
Strategy, Obligations on Developers to include
Public transport alternatives.
14Transport is a HUGE Polluting Influence New Build
school in Cheshire
Environmental Performance Indicators
Transport Aim - Calculate Number of Miles on
the Construct Project How ??
15Environmental Performance Indicators Transport
- Site Management / Staff
- Permanent Staff
- Visiting Staff general visitors
- Engineer etc
- Subcontractors / Directly Employed Craftsmen
- Groundworkers ME operatives
- Single visit contractors white lining, mastic,
diamond drilling etc - Labourers
- Material Plant Deliveries
- Willmott Dixons material plant deliveries
collections - Subcontractors deliveries collections
- Clients deliveries
16(No Transcript)
17SUMMARY OF CALCULATION
Total Mileage - 221,758 miles Cost of
Project - 1.32 million Gross Floor Area
- 1,105 m2 Cost / m2 - 1,195 /
m2 Mileage (50p/mile) - 221,758 x 50p
111,000 or 8.5 of project cost Interesting
Statistic ? .. for a small school in Cheshire
Lets put it into perspective
18 9 times
19Emissions from Light and Heavy Vehicles
Emissions in 2005 for a motorway with a fleet mix
of 9010 (LDVHDV). Speeds set at 112kph for LDV
and 100kph for HDV. Emissions in g.veh/km.
20Emissions Percentage HDV
- HDV generally make up 10-12 of the vehicle
fleet. - HDV contribute larger amounts to emissions of
vehicles - 1 lorry is equivalent to about 10 cars in terms
of NOX and PM10 emissions.
21NOX Emissions by Speed
22Do we know the scale of the challenge ?
- London
- Ensure developments are of high quality,
incorporating sustainable design and construction
methods to minimise the environmental impact. -
(Draft London Plan, GLA, June 2002)
- Based on Corporation of London and BRE figures
- over 4,000 construction vehicles entering the
City of London daily trips - If each vehicle trip is 22.5 kms this means over
24,000 tonnes of CO2 into the atmosphere yearly,
enough to fill 4,000 hot air balloons - Congestion charging
- 5 per vehicle per day
- Nationally
- 360 million tonnes of construction materials are
used each year - The equivalent of 90 million full truck loads of
4 tonnes - Industry is worth 60 billion annually (8 of GDP)
Do we even know what Regional and sub regional
Numbers are ?
23Learning from others ?
24Learning from Others..
25Environmental Benefit - Did it make any
Difference ?
26Learning from Others ?Additional impacts /
Benefits
- Economic Impact
- Increases in project plan reliability of up to 5
- Net cost savings from trade contractor packages
of 1.9 - Environmental Impact
- Local delivery vehicle CO2 emissions reduced by
11.6 tonnes, a 37 reduction. - Local delivery vehicle distance travelled reduced
by 23,200 kms. - Delivery routes controlled and kept away from
problem congestion areas - Noise impact of delivery vehicles reduced
- Re-use of existing assets, such as pallets and
hoardings - Social Impact
- Reduced storage on site thus reducing the risk of
accidents - Improved security
- Local employment
27Construction Industry Conclusions
- Service Business often component Assembly
- Demand Oriented
- Legislatively driven
- Historic one off Project mentality
- Reactive rather than Proactive
- Mr Fix it Problem Solving approach
- Often treats the symptom and not cause
- Future in Design Integration and CSR in
construction - New tools and legislation needed ? .probably
28The Option we do not have
29Blackpool will be a Vibrant, Inclusive, Healthy,
Safe and Prosperous Town ?
30Blackpool will be a Vibrant, Inclusive, Healthy,
Safe and Prosperous Town