Transcript and Presenter's Notes

Title: Per RD Instruction 4280B Section 9006 Renewable Energy and Energy Efficiency Program


1
Per RD Instruction 4280-BSection 9006 Renewable
Energy and Energy Efficiency Program
  • Loans and Grants for Farmers,
    Ranchers, and Rural Small Businesses

2
What is the Section 9006 Program?
  • Designed to assist farmers, ranchers and small
    businesses with energy projects.
  • Initially created as a 5 year program in the 2002
    Farm Bill.
  • Grant request must not exceed 25 percent of the
    total eligible project costs.
  • Congress has funded the program at 22.8 million
    per year for the last 4 years
  • Guaranteed loan program was implemented in FY 05

3
Purpose
  • Purchase renewable energy systems
  • (A process that produces or produces and
    delivers useable energy.
  • Energy Efficiency improvements to a facility or
    process that reduces energy consumption

4
Farm Bill Definitions
  • Renewable Energy energy derived from
  • wind, solar, biomass, or geothermal source, or
  • hydrogen derived from biomass or water using one
    of the above energy sources.
  • Biomass any organic material that is available
    on a renewable or recurring basis to create
    bio-energy. Material includes

5
Farm Bill Definitions (Contd)
  • Bio Energy
  • agricultural crops.
  • trees grown for energy production.
  • wood waste and wood residues.
  • plants (including aquatic plants and grasses).
  • Residues.
  • Fibers.
  • fats, oils and greases (including those that are
    recycled).
  • The term biomass does not include paper
    that is commonly recycled or unsegregated solid
    waste.
  • Anaerobic Digester
  • animal wastes and other waste materials.

6
Farm Bill Definitions (Contd)
  • Rural Any area other than a city or town with
    population over 50,000. Cannot be in urbanized
    area adjacent to such a city or town.
  • Agricultural Producer -- An individual or
    entity directly engaged in the production of
    agricultural products (including farming or
    ranching) that gets 50 of their gross income
    from the operations .

7
Farm Bill Definitions (Contd)
  • Small Business A private entity including a
    sole proprietorship, partnership, corporation,
    and a cooperative.
  • Excludes entities formed solely for a charitable
    purpose.
  • Must meet SBA definition of small business.

8
ELIGIBILITY
9
What Farmers and Ranchers Are Eligible?
  • Demonstrated financial need (for grants)
  • Must directly engage in production of
    agricultural products.
  • At least 50 of gross income must be from their
    agriculture business.

10
What Small Businesses are Eligible?
  • Demonstrated financial need (grants only)
  • Proposed project in a rural area.
  • Meets the definition of a small business
    according to SBA (http//sba.gov/size/index.html)
  • A private entity including a sole proprietorship,
    partnership, corporation, a cooperative, and an
    electric utility
  • Non-Profit organizations and public entities are
    not eligible.

11
What projects are eligible?
  • The project must be for the purchase of a
    renewable energy system or energy efficiency
    improvement
  • Pre-commercial or commercially available and
    replicable technology
  • Technically feasible
  • Located in a rural area

12
What projects are eligible? (cont.)
  • Applicant must be owner of the system and control
    the operation and maintenance of the project
  • Adequate revenues for Operation Maintenance

13
What are Eligible Costs?
  • Post application purchase installation of
    equipment, except agricultural tillage equipment
    and vehicles.
  • Post application construction or project
    improvements, except residential.
  • Energy audits or assessments
  • Permit fees
  • Professional service fees, except for application
    preparation.
  • Feasibility studies
  • Business plans
  • Retrofitting
  • Construction of a new facilityONLY if same
    purpose, same size, provides more energy savings
    than improving an existing facility

14
RENEWABLE
  • ENERGY

15
Types of Projects That Can be Funded
  • 1. Biomass, Bioenergy
  • 2. Anaerobic Digester
  • 3. Geothermal, electric generation
  • 4. Geothermal, direct use
  • 5. Hydrogen
  • 6. Solar, small (10 kW or smaller)
  • 7. Solar, large (larger than 10 kW)
  • 8. Wind, small (100 kW or smaller)
  • 9. Wind, large (larger than 100 kW)

Differing technical requirements for small and
large wind projects
16
SAMPLE PROJECTS
  • RENEWABLE ENERGY
  • Install factory made wood burning furnace to heat
    water that will be pumped through insulated
    underground pipes.
  • Install geothermal renewable energy system at a
    winery and farm.
  • Install wind turbines and solar PV array pumping
    system.
  • Build a 12,000,000 gallon bio-diesel plant.

17
ENERGY
  • EFFICIENCY

18
What are Energy Efficiency Improvements ?
  • Improvements to a facility, building, or process
    that reduces energy consumption, or reduces
    energy consumed per square foot.

19
ENERGY AUDIT VS. ENERGY ASSESSMENT
  • Energy Assessment
  • --- A report conducted by an experienced
    energy assessor, certified energy manager or
    professional engineer assessing energy cost and
    efficiency by analyzing energy bills and briefly
    surveying the target building, machinery, or
    system.
  • --- Identifies and provides a savings and cost
    analysis of low cost/no-cost measures.
  • --- Estimates the overall costs and expected
    energy savings from the improvements and dollars
    saved per year and estimates the weighted-average
    payback period in years.
  • Required for ALL energy efficiency projects,
    regardless of the amount.

20
ENERGY AUDIT VS. ENERGY ASSESSMENT (Contd)
  • Energy Audit
  • -- Report conducted or reviewed by a Certified
    Energy Manager or Professional Engineer that
    focuses on potential capital-intensive projects.
  • -- Involves detailed gathering of field data and
    engineering analysis and provides detailed
    project costs and savings information supported
    by a high level of confidence sufficient for
    major capital investment decisions.
  • -- Estimates costs, expected energy savings from
    the improvements, dollars saved per year and will
    estimate weighted-average payback period in
    years.
  • Required for all energy efficiency projects
    greater than 50,000.

21
SAMPLE PROJECTS
  • ENERGY EFFICIENCY
  • Install energy efficient grain drying bin.
  • Install energy efficient lighting in a restaurant
    using a reverse Ambient Solar Energy
    Refrigeration System.

22
(No Transcript)
23
(No Transcript)
24
APPLICATION
  • PROCESS

25
Application Requirements
  • Must meet eligibility requirements for
  • Applicant
  • Project
  • Financial Need
  • Replicability
  • Complete application
  • To qualify for funding, the application will also
    have to pass
  • Technical Review
  • National Environmental Policy Act (NEPA) Review

26
Filling out the Application
  • Standard Forms
  • - All necessary forms are available for
  • download at www.rurdev.usda.gov/rbs/farmbil
    l/.
  • Technical Report
  • - Found in RD Instruction 4280-B, Appendix A
  • or B, depending on project amount.
  • Environmental Requirements

27
List of Application Forms
  • SF-424 Application for Federal Assistance
  • SF-424C Budget Information - Construction
    Programs
  • Each cost classification category listed on the
    form must be filled out if it applies to your
    project. Any cost category item not listed on the
    form that applies to your project can be put
    under the miscellaneous category. Attach a
    separate sheet if you are using the miscellaneous
    category and list each miscellaneous cost by not
    allowable and allowable costs in the same format
    as on Form 424C. All project costs must be
    categorized as either allowable or not allowable.
  • SF-424D Assurances - Construction Programs
  • AD-1049 Certification Regarding Drug-Free
    Workplace Requirements

28
Application Forms (Contd)
  • AD-1048 Certification Regarding Debarment,
    Suspension, Ineligibility and Voluntary Exclusion
    -Lower Tiered Covered Transactions
  • AD-1047 Certification Regarding Debarment,
    Suspension, and Other Responsibility Matters -
    Primary Covered Transactions (PDF)
  • RD 400-1 Equal Opportunity Agreement (PDF)
  • RD 400-4 Assurance Agreement (PDF)
  • 1940-20 Request for Environmental Information
    (PDF)
  • Exhibit A-1 of 1940-Q Certification for
    Contracts, Grants and Loans - Required if the
    grant exceeds 100,000
  • SF-LLL Disclosure of Lobbying Activities

29
Components of the Technical Report For All
Applications
  • Qualifications of the project team
  • Agreements and Permits
  • Resource Assessment
  • Design and Engineering
  • Project Development Schedule
  • Financial Feasibility
  • Equipment Procurement
  • Equipment Installation
  • Operation and Maintenance
  • Decommissioning

30
Environmental Requirements
  • All projects receiving federal grants are subject
    to the provisions of the National Environmental
    Policy Act (NEPA). The USDA will perform the
    NEPA review.
  • Applicants must Provide all information necessary
    for the Agency to complete a NEPA review and
    analysis. USDA may contact applicant after
    preliminary review if more information is needed.
  • Be responsible for any applicable analyses and
    studies required as part of completing the NEPA
    analysis (i.e. Archaeological studies, Biological
    Assessments, etc.)
  • Strive to achieve positive community support,
    select good sites, and mitigate environmental
    impacts resulting from their proposals.

31
What type of application should be submitted ?
  • Simplified application
  • -- Qualifications for Simplified Application
    contained in
  • RD-Instruction 4280-B, section 4280.109
  • - Utilized for total eligible
    project costs of
  • 200,000 or less.
  • -- Contents of Simplified Application found
    in RD
  • Instruction 4280-B, section 4280.111
  • -- Applicant provides a certification of
    financial need.
  • -- Technical Report guidelines can be found
    in
  • Appendix A to RD Instruction 4280-B.

32
  • Full application
  • -- Contents of Full Application found in RD
  • Instruction 4280-B, section 4280.111
  • - Utilized for total eligible project
    costs of 200,000 or more.
  • -- Applicant provides a certification of
    financial
  • need.
  • -- Technical Report guidelines can be found
    in
  • Appendix B to RD Instruction 4280-B.

33
Send information to RD
  • Submit 2 copies of the -
  • grant application package, including
  • score sheet, and
  • technical report
  • TO Rural Development
  • Rural Business-Cooperative Programs
  • 1606 Santa Rosa Road, Suite 238
  • Richmond, VA 23229

34
After RD receives the application package and
technical report what happens?
  • 1 copy is reviewed by VA RD staff
  • The environmental assessment is completed by VA
    RD staff.
  • 1 copy is reviewed by the National Renewable
    Energy Lab (NREL) in Colorado

35
Rural Development Staff determines
  • Applicant eligibility
  • 2. Project eligibility
  • --Can environmental assessment get
    done in time?
  • Application completeness
  • Does the project meet funding requirements
  • 5. Application score

36
NREL Determines
  • 6. Technical Eligibility (pass or fail)
  • NREL will provide the technical merit points
  • on the score sheet.
  • If the answer is PASS
  • The score sheet and documentation is forwarded to
    the National Office for consideration of funding.

37
TECHNICAL REQUIREMENTS
  • USDA has worked with technology experts at NREL
    (National Renewable Energy Lab) to develop
    Guidance on the Technical Requirements for each
    technology.
  • Designed to help applicants better understand how
    to respond to the technical requirements of the
    various types of projects.
  • Information available at www.rurdev.usda.gov/rbs/f
    armbill/

38
Utilize tools provided by RD
  • www.rurdev.usda.gov/rbs.html
  • Review Checklist
  • Be sure to submit all the information
    requested for the application. RD forms are at
    the same website location.
  • Score Sheet
  • Score your application and attach supporting
    documentation.
  • www.rurdev.usda.gov/rbs/farmbill/technicl.htm
  • Technical report guidelines
  • Be sure to follow the format described.
  • Additional information can be obtained from
    the Iowa website at http//www.rurdev.usda.gov/ia
    /rbcs_RE-EE_Section_9006.html

39
What are your next steps?
  • The Technical Report
  • Plan your project
  • Consult experts
  • Start making decisions
  • If energy efficiency project, get an energy
    assessment or audit completed.
  • Important -The Technical Report
  • Ask for assistance in putting your application
    together.

40
State Office 804-287-1606 www.rurdev.usda.gov/rbs.
html
  • ____ million available in FY 2007 for grants and
    loans
  • Nation-wide competition for funds
  • PLAN YOUR PROJECT NOW