BALL GUARD On-Load Tube Cleaning Systems - PowerPoint PPT Presentation

About This Presentation
Title:

BALL GUARD On-Load Tube Cleaning Systems

Description:

BALL GUARD OnLoad Tube Cleaning Systems – PowerPoint PPT presentation

Number of Views:1067
Avg rating:3.0/5.0
Slides: 42
Provided by: Comp824
Category:
Tags: ball | guard | cleaning | load | systems | tube

less

Transcript and Presenter's Notes

Title: BALL GUARD On-Load Tube Cleaning Systems


1
BALL GUARD On-Load Tube Cleaning Systems
  • TECHNICAL PRESENTATION BY
  • SAHAPIE ENGINEERING CO.,LTD

2
TOPIC
  • ? GENERAL
  • ? BALL GUARD AOTCS HOW DOES IT WORK
  • ? FAMILY OF BALL GUARD AOTCS ACCESSORIES
  • ? CONDENSER TUBES CONDITION BEFORE AND AFTER BALL
    GUARD AOTCS OPERATION
  • ? PROJECT REFERENCE

3
GENERAL
4
AIR CONDITIONING STANDARD IN BUILDING BY DEDP.
  • HOTEL
  • DEPARTMENTSTORE
  • HOSPITAL
  • COMMERCIAL BUILDING

NOTE DEDP DEPARTMENT OF ENERGY DEVELOPMENT
AND PROMOTION
5
HOTEL
Light 13
Other 19
A/C Systems 68
6
DEPARTMENT STORE
Light 22
Other 18
A/C Systems 60
7
HOSPITAL
Light 21
Other 21
A/C Systems 58
8
COMMERCIAL BUILDING
Light 24
Other 16
A/C Systems 60
9
AIR CONDITIONING STANDARD IN BUILDING BY DEDP.
10
AIR CONDITIONING STANDARD IN BUILDING BY DEDP.
11
MAIN EQUIPMENT OF A/C SYSTEMS
  • CHILLER
  • AIR HANDLING UNIT
  • COOLING TOWER
  • CIRCULATING WATER PUMP

Cooling Tower
Condenser Water Pump
Chiller
Chill Water Pump
Air Handling Unit
12
MAIN EQUIPMENT OF A/C SYSTEMS
WATER CHILLER
AIR HANDLING UNIT
COOLING TOWER
CIRCULATING WATER PUMP
13
COOLING TOWER CONDITION
  • OPEN SYSTEM
  • TO COLLECT IMPURITIES FROM INVIRONMENTAL
  • CALL FOULING
  • MAJOR FOULING MECHANISM CONSIST OF
  • - PRECIPITATION FOULING ( SCALING )
  • - BIOLOGICAL FOULING ( SLIME )
  • - CORROSION FOULING
  • - PARTICULATE FOULING ( SEDIMENTATION )

14
FOULING EFFECT ON CONDENSER SYSTEM
SCALE ON CONDENSER TUBES
FOULIING OF CONDENSER WATER
SCALE ON FIILLER OF COOLING TOWER
SCALE ON CONDENSER PIPE
SCALE ON CONDENSER PUMP
SCALE FROM FILLER OF COOLING TOWER
15
REFRIGERANT SIDE CONDITION
16
EFFECT OF FOULING ON CHILLER
17
AIR-WATER-REFRIGERANT TEMPERATURE RELATION IN
CHILLER
18
NEW CONDENSER TEMPERATURE CONDITION
  • AT FULL LOAD OPERATION
  • CONDENSER WATER TEMP.
    INLET 90 deg. F.
  • TEMP. OUTLET 100 deg. F.
  • Tout - Tin 10
    deg. F.
  • Refrigerant Temp. 103 deg. F.
  • Condensing Approach Tref. - T out
  • 103 -
    100
  • 3
    deg. F.

19
CONDENSER TEMPERATURE CONDITION WITH FOULING
  • AT FULL LOAD OPERATION
  • CONDENSER WATER
    TEMP. INLET 90 deg. F.
  • TEMP. OUTLET 97 deg. F.
  • Tout - Tin 7
    deg. F.
  • Refrigerant Temp. 107 deg. F.
  • Condensing Approach Tref. - T out
  • 107 -
    97
  • 10
    deg. F.

20
FOULING RESISTANCE VS. TIME Water condition -
450 ppm Caco3 / 95 deg.f., - Velocity 5 ft /
sec. Result - Constant fouling resistance(
0.001 )/ 900 hrs. Additional chemical to water
- 2,000 ppm Caco3 / 110 deg f. - Velocity 5
ft / sec. Result - Quickly fouling resistance
increase ( 0.006 )/ 100 hrs
21
kw/ton Record ( Before After Hand Brush
Cleaning )Novotel Lotus Hotel
22
HEAT TRANSFER SURFACE REQUIRED TO OFFSET FOULING
23
ENHANCED TUBE GEOMETRIES
24
BALL GUARD AOTCS HOW DOES IT WORK
25
BALL GUARD ON-LOAD TUBE CLEANING SYSTEM
26
HOW DOES IT WORK
INJECTION CYCLE
COLLECTION CYCLE
27
FAMILY OF BALL GUARD AOTCS ACCESSORIES
28
FAMILY OF BALL GUARD
29
Flow diagram model ABGS-3C-1BSxx For 3-chillers,
One Ball strainer and Separator
30
Ball collection system model ABGS-3C-1BSxx For
3-chillers, One Ball strainer and Separator
31
Piping work model ABGS-3C-1BSxx For 3-chillers,
One Ball strainer and Separator
32
CONDENSER TUBES CONDITION BEFORE AND AFTER
BALL GUARD AOTCS OPERATION
33
CONDENSER TUBES BEFORE BALL GUARD
OPERATIONJOMTIEN PALM BEACH RESORT ( 19/7/97
)CHILLER TRANE 550 TON
34
CONDENSER TUBES AFTER 3 MONTHS BALL GUARD
OPERATION
35
KW/TON COMPARISON BEFORE AFTER BALL GUARD
OPRATION
36
PROJECT REFERENCE
37
PROJECT REFERENCE
38
BALL GUARD ON-LOAD TUBE CLEANING
SYSTEM SHINAWATRA UNIVERSITY
CHILLER YORK 380 TON 2 SET CHILLER YORK 190
TON 2 SET CHILLER MANAGER CONTROLLED
CHILLER YORK 380 TON
39
BALL GUARD ON-LOAD TUBE CLEANING
SYSTEM SHINAWATRA UNIVERSITY
MODEL ABG-4C-4BS08 CHILLER MANAGER CONTROLLED
BALL STRAINER INSTALLATION
CONTROL PANEL
CONTROL PANEL DETAILS
BALL STRAINER
COLLECTION SIGHT GLASS
40
BALL GUARD ON-LOAD TUBE CLEANING SYSTEM SHINWATRA
TOWER 3
BALL GUARD MODEL ABG-3C--3BS14
BALLSTRAINER MODEL BS-14
CHILLER TRANE 900 TON 3 SET CHILLER TRANE 300
TON 3 SET CHILLER MANAGER CONTROLLED
BALL GUARD MODEL ABG-3C--3BS08
BALLSTRAINER MODEL BS-08
41
BALL GUARD ON-LOAD TUBE CLEANING SYSTEM SHINWATRA
TOWER 3
MIMIC DIAGRAM
SPONGE BALLS IN BALL COLLECTORSEE THROUGH SIGHT
GLASS
BALL GUARD MODEL ABG-3C--3BS08
CONTROL PANEL DETAILS
BALL GUARD CONTROL PANEL
GRISWOLD SOLID SEPERATOR MODEL GS-04 T
Write a Comment
User Comments (0)
About PowerShow.com