Patch Panel 1 (PP1) - PowerPoint PPT Presentation

About This Presentation
Title:

Patch Panel 1 (PP1)

Description:

Provide cooling, electrical and fiber connections as specified in ATL ... Tube flared. in place. PEEK insert. electrical break. PEEK nut. Ron Madaras, LBL. 7 ... – PowerPoint PPT presentation

Number of Views:941
Avg rating:3.0/5.0
Slides: 15
Provided by: Gilch
Category:
Tags: panel | patch | pp1 | tube

less

Transcript and Presenter's Notes

Title: Patch Panel 1 (PP1)


1
Patch Panel 1 (PP1)
  • Brief Review
  • Cost and Effort Estimate

2
Patch Panel 1
TRT Forward
TRT Forward
SCT Barrel
Services and Beam Pipe Support Structure
Services and Beam Pipe Support Structure
Pixel Detector
Side C
Side A
3
PP1 Region Functions
  • Cooling connections
  • Electrical connections
  • Optical fiber connections
  • N2 connections
  • Complete gas seal
  • Complete electrical shield

PP1 Region
lt- Towards IP
PP1b
PP1a
4
PP1 Requirements
  • Provide cooling, electrical and fiber connections
    as specified in ATL-IP-ES-0007(Pixel Services)
    and described in ATL-IP-ES-0072.
  • Gas seal for 4 mbar maximum pressure differential
    consistent with 6 l/mbar-hour leak from the pixel
    volume.
  • Penetrations for cooling pipes to allow up to 3mm
    contraction from room temperature to cold
    temperature.
  • Access to beam pipe adjustment allowance for
    beam pipe survey.
  • Cutouts for PST rails to allow pixel package
    insertion.
  • Outer diameter consistent with insertion of pixel
    package with PP1 attached to service panels
  • Electrical connection to PST and beam pipe EMI
    shields.
  • Temporary support of beam pipe during
    installation of the pixel package.

5
PP1 Endplate
  • Picture of prototype endplate. Machined aluminum,
    6mm thick.

Slots for fibers
For cooling and gas connections
Seal plates
Slots for electrical feedthroughs
For beampipe support and adjustment
6
Coolant Fittings
  • Lack of space, the need to allow contraction of
    the pipes and minimize forces on the endplate and
    the need for an electrical break requires us to
    use a custom fitting.

PEEK insert electrical break
PEEK seal to pipe
Threaded insert into endplate
Tube flared in place
PEEK nut
Bellows for contraction of pipes upon cooldown
7
More Coolant Connections
  • Commercial fittings at PP1b desired but not yet
    selected
  • Filter between PP1b and PP1a, also not selected.
  • Custom wrenches for PP1a are needed (under
    design). Space is very limited.
  • Same for PP1b? Not clear yet

8
Electrical Feedthroughs
  • Fabricated for simple functional tests and for
    mockup.
  • Connections to PP0(largely already made on
    prototype)
  • Thermal tests
  • HV isolation
  • Add PP1b connectors, read out real modules

9
Optical Fibers
  • Ericsson study of MT16 connectors with bare
    ribbons on the PP0 side and corresponding
    cables on the PP1a side.
  • Mechanical(glued) interface to PP1 endplate slot.

10
PP1 Prototype
  • Plan is to make enough coolant fittings for one
    quadrant.
  • Custom bellows ordered
  • Other parts either ready to order or sent to
    shops.
  • Would then assemble into quadrant of prototype
    endplate to get experience.
  • Current plan is to use paper(rad-hard and cheap)
    gaskets for seal. Will test this idea in small
    setup also after irradiation, in addition to full
    scale.
  • Would mount endplate as shown with coolant
    connections(and blanked off electrical and fiber
    connections) to measure leak rate attached to
    30cm PST prototype with flanges. Repeat after
    adding electrical connections.
  • Fiber plan not yet clear scope of Ericsson
    prototypes not likely to fill all of slot.

11
Mockup at CERN
  • Assembly started

12
Cost and Effort Estimate
Included in estimate
  • Bulkhead
  • Bulkhead seal ring and gasket
  • Bulkhead center support, bellows, connection to
    beam pipe
  • Coolant pipe feedthrus (supply and return)
  • Striplines
  • Corrugated support for PP1b electrical cable
    connectors
  • Full prototype of one PP1 quadrant
  • Contingency

Not included in estimate (as they are in other
cost estimates)
  • Fiber optic cables
  • PP1a fiber optic cable feedthrus
  • PP1a beam pipe adjusters
  • PP1a to PP1b coolant pipes
  • PP1b coolant pipe connectors
  • PP1a to PP1b electrical cables
  • PP1b electrical cable connectors
  • PP1b filter/pressure drop devices

13
Cost and Effort Estimate
14
Conclusion
  • Preliminary design of PP1 and related items well
    advanced. More work is needed to complete design.
  • Prototypes of critical components either
    fabricated or under fabrication.
  • 1-to-1 mockup assembly started at CERN
  • Next major steps are to complete quarter-scale
    prototype and to finish mockup studies.
  • Preliminary cost and effort estimate
  • Total cost 472K
  • Total effort 27 FTE-months
Write a Comment
User Comments (0)
About PowerShow.com