5 Project Commissioning Best Practices for You to Consider - PowerPoint PPT Presentation

About This Presentation
Title:

5 Project Commissioning Best Practices for You to Consider

Description:

In project management, commissioning is a crucial phase. During the commissioning phase, functional testing procedures are performed, interoperability problems are resolved, and energy usage is optimised for enhanced performance and efficiency. The effectiveness of the commissioning phase relies heavily on the expertise and experience of the building commissioning firm and also on how well the process is implemented. Here are five project commissioning best practices for you to consider, including planning, factory acceptance testing (FAT), mechanical completions, construction quality and schedule management. – PowerPoint PPT presentation

Number of Views:77

less

Transcript and Presenter's Notes

Title: 5 Project Commissioning Best Practices for You to Consider


1
5 Project Commissioning Best Practices for You to
Consider
  • Global - CXM

2
PLANNING
  • Construction projects are highly dynamic and
    comprise several moving components. The
    commissioning management must stay on top of
    everything, and hence it is utterly important to
    have a foolproof commissioning plan in place.
  •  
  • Preferably, the owners of the project should
    involve a building commissioning firm prior to
    the design phase and the operation phase. This
    will allow the commissioning engineer to act as
    an intermediary between the contracting and
    design team to ensure complete adherence to the
    owner's project requirements (OPR).

3
Factory Acceptance Testing (FAT)
  • Factory Acceptance Testing (FAT) assesses
    pre-functional equipment as well as checks if it
    is in accordance with the design specifications.
    Being an important part of the commissioning
    phase, it should be performed soon after purchase
    and also regularly once the use of equipment
    starts.
  • Any failure to implement FAT appropriately put
    off issues that can later prove to be very costly
    to resolve and can leave a more devastating
    impact. For instance, poorly implemented FAT for
    automation like failure to involve the PLC logic
    design may lead to a giant problem towards the
    completion of the project. For HVAC systems, a
    test and balance procedure is carried out as part
    of FAT.

4
Define every mechanical completion beforehand
  • Put out the expectations at the beginning of the
    project while mentioning when mechanical
    completions are supposed to align with the
    commissioning activities.

5
Define the Boundary
  • Commissioning and construction activities usually
    overlap to enhance the schedule of the project.
    Mechanical completion documentation outlines the
    areas that are under construction (under the
    custody and control of the construction team) and
    also the areas that are under testing (under the
    custody and control of the commissioning team).

6
Construction Quality
  • The system quality obtained from the construction
    team decides the success of the commissioning
    phase. The construction team should execute a
    quality management system (QMS).
  •  
  • The QMS describes the quality control (QC) role
    and quality assurance (QA) role of the
    construction team and the project owner,
    respectively. Inspection test plans (ITPs)
    outlines details of quality control. The QA
    further makes sure that the contractor adheres to
    the QC and ITP plans.

7
Schedule Management
  • The schedule changes constantly and requires
    regular update. Hence, schedule management is
    critical to successful commissioning.
  •  
  • To avoid turning schedule management into a task,
    the schedule should just include block activities
    representing an outcome. For instance, if there
    is just a week for loop checks to be carried out
    on an automated system, mark it as just one-week
    activity. Its not necessary to involve minute
    details of every panel being assessed, given that
    all are assessed within a week.

8
Contact Us
  • Address Global Commissioning Management and
    Software Ltd, Unit 2, Chestfield Business
    ParkWhitstable Kent, CT5 3JB
  • https//www.facebook.com/GlobalCxMLtd
  • https//twitter.com/_globalltd
  • https//www.instagram.com/global_cxm/
  • https//www.linkedin.com/company/global-commission
    ing-management-software-ltd

9
Thank YOU!!