The 6 Phases of the Architectural Design and Drawings Process - PowerPoint PPT Presentation

About This Presentation
Title:

The 6 Phases of the Architectural Design and Drawings Process

Description:

Know the 6 phases of the architectural design and drawings process. The stages of design as described by The American Institute Of Architects will be discussed in this article. – PowerPoint PPT presentation

Number of Views:2
Slides: 11
Provided by: nakshaconstruction
Tags:

less

Transcript and Presenter's Notes

Title: The 6 Phases of the Architectural Design and Drawings Process


1
The 6 Phases of The Architectural Design and
Drawings Process
Bio Link
https//sites.google.com/view/naksha-construction/
blog/6-phases-of-design-and-drawings-process
2
(No Transcript)
3
Constructing a building is a lengthy process.
Breaking down an architectural project through
tiny steps helps simplify the construction
process.The stages of design as described by The
American Institute Of Architects will be
discussed in this article. We'll go over
everything from how we need a conceptual design
to the architectural design stages in detail
4
Programming
  • During this stage, also known as the Program of
    Requirements, your engineer would ask you
    numerous questions about the house elevation
    design. Carefully listen to the answers, conduct
    interviews and seminars and observe your business
    operations.

5
Planimetric Analysis
  • The level of detail in a schematic design is low
    because of the conceptual character of the home
    design and drawing. If your project involves
    external construction, your designer will start
    by laying out the location and the interior areas
    and developing basic exterior designs. As half of
    this step, your design specialist will typically
    provide you with a rough estimate of the
    project's final price.

6
Creation of Designs
  • Thanks to your skilled designer, a substantial
    amount of progress will be made in the building
    design and drawing in jaipur at this stage. You
    should focus on articulating and fleshing out the
    project's core components during this stage.
    There is greater attention to detail in the
    architecture and design of the exterior and
    inside, as well as the room proportions and
    materials used. The engineers will improve the
    HVAC, drainage, electrical systems.

7
Plans and Specifications for the Building Project
  • The final match of structural design and
    drawing should include the technical details
    necessary to secure a construction permit from
    the appropriate municipality (e.g., the city,
    county, etc.). In most cases, your builder will
    manage the permission procedure on your behalf,
    including responding to any inquiries or demands
    for further information from the approving body
    and making any necessary adjustments to the
    designs.
  • The Construction Documents are a comprehensive
    set of specifications drawings submitted for
    permits and sent to contractors to solicit bids
    and price estimates for the project. There is
    also typically a new cost estimate made.

8
Bidding
  • If you work for a government agency, you must
    follow specific regulations when hiring
    contractors, but private companies have more
    leeway. If you're looking for a competitive
    quotation, you can pick a good builder based on
    qualifications. Afterward, negotiate exclusively
    with With material construction in Jaipur. Or you
    can choose many contractors to acquire bids from.
    A professional architect can assist you in
    weighing your alternatives.
  • During the bidding and procurement process, your
    architect will assist in answering queries from
    contractors, issuing formal clarification to the
    plans and specifications if needed, and assisting
    in evaluating bids to ensure that all necessary
    items are included.

9
Construction Project Management
  • Your civil work contractor may visit the site as
    often as once per day, once per week, or as
    infrequently as once per month, based on the
    extent of the work and your preferences. However,
    having a watchful eye ensures that you have the
    desired living quarters in the end.

10
Let us sum up -
  • Choose the best builder like Naksha
    Construction. Your builder will track the job's
    progress by taking pictures and writing reports
    from the site and will also make sure that they
    are paid fairly for the work they've
    accomplished.
  • Source Link
  • https//sites.google.com/view/naksha-construction/
    blog/6-phases-of-design-and-drawings-process