Title: Asbestos Management Plan Sydney (2)


1
Asbestos Management Plan Sydney
www.sydneyenvironmental.com.au
2

An engineer must have a reasonably accurate
concept of the physical properties and
arrangement of the underlying materials before he
can intelligently design a foundation. Soil
exploration or site investigation refers to the
field and laboratory investigations including the
Asbestos Management Plan Sydney required to
acquire this crucial data. As a result, the soil
must be examined and the best construction
material selected. When the soil test results are
out, an engineer will help figure this out
3
One of the most important reasons to conduct a
site investigation is to determine whether your
project can proceed safely. Building on certain
soils might be dangerous for the workers and the
nearby buildings. Work with a qualified
professional to conduct a site investigation to
avoid legal consequences. The significance of
conducting a site investigation cannot be
overstated. It aids in determining a few aspects
of a project, including cost reduction and safety
enhancement. A site investigation should be
considered by every developer for their next
project.
4
Preliminary site assessments begin by outlining
the study's scope and determining the kind of
information that is required or pertinent, just
like any other investigation. The nature of the
investigation largely determines the level of
detail required. For instance, project
feasibility exercises require fewer site details
than data collection for engineering design
purposes and will require Remedial Action Plan
NSW afterwards. Regarding this, based on the
purpose of the investigation, various
methodologies are utilized. Sample collection,
subsurface exploration, and geographical
surveying, in-situ testing, and aerial
photographs are among them.
5
CONTACT US
Sydney Environmental Group Pty Ltd 282 New South
Head Road Sydney, NSW, Australia,2015 Phone
No- 61 432254699 www.sydneyenvironmental.com.au
6
thank you!