Title: Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status
1Hall C MeetingSHMS Magnets and Support
StructureDesign and Procurement Status
- Paul Brindza
- January 26, 2009
2SHMS Magnets and Support Structure
- SHMS Spectrometer and Magnets
- SC Magnet Procurement Status
- SHMS Magnet Recent Progress
- SHMS Support Structure
- Conclusions
3SHMS
Shield House
Electronics Room
Cryo Transfer Line
Power Supplies
Target
Bender
Q1
Q2
Q3
Dipole
Detectors
4SHMS Q1 Quadrupole AssemblyJLAB Cold Iron Quad
Design (CIQ)
SHMS Horizontal Bend DipoleWarm Iron SC C
Magnet
SHMS Cosine T Dipole Assembly60 cm warm bore-
cryo-stable design
SHMS Q3 Cosine 2T Quadrupole Assembly60 cm
warm bore cryo-stable design
5SHMS Magnet Designs
Bo/Go Aperture J A/cm2 Design
HB 3.10 T 35 x 36 28,900 C Type Super Ferric
Q1 10.6 T/m 40 cm 23,430 JLAB Q1 Cold Iron
Q23 14.4 T/m 60 cm 5,800 Cosine (2T)
Dip 4.76 T 60 cm 5,000 Cosine (T)
6SHMS Magnets Stored Energy Weight
I (A) L (H) E (MJ) Wt.
HB 4500 0.029 0.290 3.9 t
Q1 3630 0.123 0.808 15 t
Q23 5855 0.638 10.94 70 t
Dip 4940 1.63 19.84 163 t
7SHMS Requirements from Optics and SC Magnet
Design Margin
Magnet Optics at 11GeV/c Design Maximum Design Margin
HB dipole TM 1.929 2.345 17.7
Q1 Quad (T/M)M 14.752 19.905 25.9
Q2 Quad (T/M)M 19.429 23.210 16.3
Q3 Quad (T/M)M 12.917 23.210 44.3
Dipole TM 11.189 13.591 17.7
8SHMS SC Magnet Procurement Strategy
- SC Magnets will be built by contractors
- In a significant departure from HMS we will
provide major SC magnet components - Superconductor (SSC surplus)
- Cryo-Control Reservoir( same as HMS Design)
- DC Power System( same as HMS)
- Magnet Control System( Same as HMS)
- Warm Yoke Steel
9SHMS SC Magnet System Plan
CryogenicControlReservoir
DC Power System
Magnet Control System
Fabricated Cryostated Magnet
On Site Integration Assembly
RFPFixed Price Procurement
Acceptance Testing
Ship to JLAB
Conductor Processing
Magnet Support Alignment
Warm Iron Yoke
Testing
SC Cable
10Procurement Status of SHMS Magnets
- Q1 Magnet bids under evaluation-dont ask/dont
tell - Q1 Award plan date is March 15, 2009
- Q2Q3 Dipole RFP released Jan 26, 2009
- Q2Q3D Bids due May 2009, Award Dec. 2009
- HB magnet design review Feb. 10, 2009
- MOU/Contract with NSCL June 2009
11Horizontal BendDesign by NSCL/MSUWarm Iron SC
C Magnet
12HB Coil Drawing and 3D CAD of Winding Tooling
13HB Coil Winding Tooling
141st Full HB Coil 90 Turns
15Q1 Quad 3D CAD Model Cold Iron Quad Design like
HMS Q1Bids are IN!!
16Q1 Coil winding at SMI
17First Phase II Q1 Coil
18Q1 Coil Tests
19SHMS Support Structure
20Mechanical Requirements
- SHMS Minimum Scattering Angle 5.5 degrees
- SHMS-HMS angle 5.512 17.5 degrees
- HMS Minimum Angle (present) 10.5 degrees
- SHMS Max angle 40
degrees - HMS Max Angle(present ) 85 degrees
- Hall C Radius at SHMS max 73 feet
- Fit to beam pipe at 5.5 degrees 5 mm
- Fit to HMS at 17.5 degrees 1 cm
21SHMS Support Structure Reference Design
- SHMS Support Structure Preliminary Design
completed in 2007 by ALION, a local company with
experience in large welded steel structures - SHMS Support Structure Reference Design(RD)
Completed by ALION January 28, 2009 - RD will be the technical elements for the bid
packages for the SHMS support structure. - SHMS Support Structure RD review was held in
- December 08 at JLAB
22SHMS General Arrangement
23SHMS Support Cross Sections
24SHMS Structure Preliminary Assembly Plan
25Top View SHMS HMS Spectrometers
Dipole
Q3
Q2
Q1
Bender
Beamline
Target
HMS Spectrometer
26Bottom View
SHMS wraps around front of HMS
HMS
SHMS
Beamline stands
27Bender fit up to HMS Q1
Bender
HMS Q1
28Q3 Dipole fit up
SHMS Dipole
SHMS Q3
24 Beamline
Q2
Shield House notch
Beamline Stand
29Shield House fit up
Shield House
Dipole
Beamline
Q3
Q2
Shield House notch
Q1
Bender
30Conclusions
- SHMS SC Magnet designs are sound, reviewed and
procurement has started - JLAB is a partner in the SHMS Magnet fabrication
- Superconductor, Cryogenic Interface, Iron
Yokes - DC systems and PLC based controls.
- SHMS Support Structure Reference Design is
complete - detail design and fabrication begins FY10
- Since we havent spent a dime yet
- We are still On time and On budget!!