Title: System Planning, Development, Procurement


1
System Planning, Development, Procurement
Maintenance
  • PUAD 680
  • Week 11

2
Agenda
  • Current events
  • Alter, Information Systems Planning, chap. 11
    (contd from last week)
  • Alter, Building Maintaining Information
    Systems, chap. 12
  • Sector surveys

3
Information Systems Planning
  • Index of /jgifford

4
Figure 12.1 Proj Dev Phases
5
Overview of Alternative Approaches for Building
Information Systems
  • The traditional life cycle uses a prescribed
    sequence of steps and deliverables
  • The capability maturity model (CMM) tracks the
    extent to which an IT organization uses this type
    of life cycle in its development work
  • A prototype IS is a working model built to learn
    about the true requirements of the system

6
  • An application package consists of commercially
    available software that addresses a specific type
    of business application
  • Installed and operated by the IS department
  • End-user development is the development of ISs
    by work system participants
  • Procuring from an outside system developer

7
Figure 12.3
8
  • Pros and cons of the traditional life cycle
  • Adherence to fixed deliverables improves control
    but also guarantees a lengthy process
  • Having specific deliverables makes it easier to
    monitor the work and take corrective actions
    early
  • The traditional life cycle is the standard
    against which other approaches are compared

9
Figure 12.5 Prototype Phases
10
  • Initiation
  • The problem is not well understood and/or the
    users are unable to say exactly what they want
  • Development
  • Emphasizes speed and rapid feedback

11
  • Implementation
  • Part of the implementation is done in parallel
    with development
  • Operation and maintenance
  • Similar to Systems Development Life Cycle

12
Advantages Disadvantages
  • Advantages
  • Users have a tangible IS to work with during
    development
  • Early user involvement may reduce skepticism
  • Building prototypes is becoming easier

13
  • Disadvantages
  • Too much user involvement
  • Many changes
  • Frequent deadlines are stressful

14
Outside Procurement from System Developer
  • Contract with outside developer to develop
    system, often using RFP
  • Risks
  • Contract management is difficult, esp. in public
    realm (e.g., award protests)
  • Requirements creep
  • Policy/external environment changes
  • Advantages
  • Provides access to outside expertise that may be
    difficult to hire
  • Avoids some challenges of other methods.

15
(No Transcript)
16
Deciding Which Combination of Methods to Use
  • Combining system development approaches
  • Some alternatives
  • Use a prototype as part of the traditional life
    cycle
  • Use a small application package as a prototype
  • Adopt aspect of a traditional life cycle to
    purchasing an application package
  • Add a user development component to the
    traditional life cycle