APMP TCL Report to WGDM8 - PowerPoint PPT Presentation

1 / 17
About This Presentation
Title:

APMP TCL Report to WGDM8

Description:

A CMC Review Platform was created for helping to coordinate Inter-RMO review processes ... CMC Review Process. CMCs Review Status. Submission to TCL for intra ... – PowerPoint PPT presentation

Number of Views:48
Avg rating:3.0/5.0
Slides: 18
Provided by: gwoshe
Category:
Tags: apmp | tcl | cmc | report | wgdm8

less

Transcript and Presenter's Notes

Title: APMP TCL Report to WGDM8


1
Asia Pacific Metrology Programme23rd General
AssemblyTechnical Committee for Length (TCL)
Siew Leng TAN (SPRING Singapore, Singapore) 28
Sep 2006 Sydney, Australia 23GA Agenda 15 TCL
2
Outline
Inter-RMO Comparison
3
Change of Chair
  • Dr R P Singhal (NPLI, India)
  • - elected as Chair in Dec 2006
  • - retired in Jul 2007
  • Ms Siew Leng Tan (SPRING Singapore, Singapore)
  • - nominated as Vice Chair in Apr 2007
  • - proposed as Acting Chair in Jun 2007 at the
    APMP EC/TC Chairs meeting
  • - announced as Chair wef 30 Jul 2007 by the APMP
    Secretariat

4
Key Comparisons APMP.L-K1
K1 gauge blocks
Initiating
Planning
Circulating
Reporting
Publishing
Preparation
Draft A
Draft B
Survey
Pilot
Starting
Ending
Final
Jan 2001
NMIJ (Mr. I. Fujima)
Jul 2002
Aug 2004 (Dr. J. Ishikawa)
May 2006 Published
  • 11 participants
  • Final results were published in May 15 of 2006

K2 long gauge blocks
K3 angle standards
K4 diameter standards
K5 1-D CMM artifacts
K6 2-D CMM artifacts
5
APMP.L-K1.1 Follow up comparison for gauge blocks
Initiating
Planning
Circulating
Reporting
Publishing
Preparation
Draft A
Draft B
Survey
Pilot
Starting
Ending
Final
May 2005
NMIJ (Dr. Hirai)
Sep/Oct 2006
  • 10 steel Gauge Blocks, central length 0.5 mm to
    100 mm
  • 7 participants CMS, MSL, NIMT, NMIJ, NML-SIRIM,
    NPLI, VMI
  • Draft A is under preparation

6
Key Comparisons APMP.L-K2
K1 gauge blocks
K2 long gauge blocks
Initiating
Planning
Circulating
Reporting
Publishing
Preparation
Draft A
Draft B
Survey
Pilot
Starting
Ending
Final
Jun 2000
NMIA (Dr. N. Brown)
May 2002
June 2004
May 2006 Published
  • 12 Participants
  • Final results was published in May 22 of 2006

K3 angle standards
K4 diameter standards
K5 1-D CMM artifacts
K6 2-D CMM artifacts
7
Key Comparisons APMP.L-K3
K1 gauge blocks
K2 long gauge blocks
K3 angle standards
Initiating
Planning
Circulating
Reporting
Publishing
Preparation
Draft A
Draft B
Survey
Pilot
Starting
Ending
Final
May 2005
NMISA (Ms. L. Mostert)
  • 12 participants
  • Last 3 labs in the pipeline NIM, SSRC-NSCL and
    NMIJ

K4 diameter standards
K5 1-D CMM artifacts
K6 2-D CMM artifacts
8
Key Comparisons APMP.L-K4
K1 gauge blocks
K2 long gauge blocks
K3 angle standards
K4 diameter standards
Initiating
Planning
Circulating
Reporting
Publishing
Preparation
Draft A
Draft B
Survey
Pilot
Starting
Ending
Final
CMS (Dr. J. Lee)
  • Standards supplied by NMIJ
  • 14 participants
  • Scheduled to start in early 2008. Pilot lab is
    currently checking on the roundness, straightness
    and parallelism of the standards

K6 2-D CMM artifacts
9
Key Comparisons APMP.L-K5
K1 gauge blocks
K2 long gauge blocks
K3 angle standards
K4 diameter standards
K5 1-D CMM artifacts
Initiating
Planning
Circulating
Reporting
Publishing
Preparation
Draft A
Draft B
Survey
Pilot
Starting
Ending
Final
Dec 2005
KRISS (Dr. T.B. EOM)
  • 13 participants (PTB had withdrawn as service is
    no longer provided)

K6 2-D CMM artifacts
10
Key Comparisons APMP.L-K6
K1 gauge blocks
K2 long gauge blocks
K3 angle standards
K4 diameter standards
K5 1-D CMM artifacts
K6 2-D CMM artifacts
Initiating
Planning
Circulating
Reporting
Publishing
Preparation
Draft A
Draft B
Survey
Pilot
Starting
Ending
Final
Apr 2006
NMIJ (Dr. T. Takatsuji)
  • Schedule was delayed by 4 mths and expected to
    finish in Feb 2008
  • Details available in http//www.nmij.jp/dms-std/a
    pmplk6.html

11
Key Comparisons APMP.L-K11
K11 633 nm He-Ne laser
Initiating
Planning
Circulating
Reporting
Publishing
Preparation
Draft A
Draft B
Survey
Pilot
Starting
Ending
Final
NIM (Dr. S. Gao)
  • 8 participants
  • Final results were published in Aug 17 of 2007

K1.1 Follow up comparison for gauge blocks
12
Supplementary Comparisons
Bi-lateral Comparison
  • PTB-NMIJ/AIST bi-lateral comparison
  • Measurements on pitch standards and completed
  • Report approved and posted as APMP.L-S2

Multi-lateral Comparison
(Pilot study, not registered)
  • NMIJ, CMS, KRISS, and Finland multi-lateral
    comparison
  • Measurements on EDM
  • measurements were completed in Sep 2006

Registering the Result
  • For comparison result to be recorded
  • Technical protocol to be approved by TCL chair
  • APMP-G2 guideline for conducting comparisons is
    followed

13
Inter-RMO Comparison
Status and Discussion
  • Line Scale EURAMET Key Comparison(EURAMET.L-K7)
  • Piloted by MIRS of Slovenia (Dr. Bojan Acko)
  • Accept participants from outside EURAMET
  • 31 participating laboratories
  • Surface Roughness- APMP Key Comparison(APMP.L-K8)
  • Piloted by NMIA of Australia (Mr. Andrew Baker)
  • Accept participants from outside APMP
  • 17 laboratories expressed interests
  • Protocol was discussed at the last TCL meeting
    in India

14
CMCs TCL Review Board Members
CMC Review Process Intra-Regional
Intra-Regional Review
TCL Chair/ Vice Chair
CMCs QS
APMP NMIs
TCL Chair
Review Board
CMCs Preparation
CMC Submission
Assign Reviewers
Carry out Reviews
Register for Inter-regional Review
  • QS should be ready with CMCs
  • CMC claims
  • QS information
  • (on APMP web)

CMC Review Process Inter-Regional
CMC Review Status
TCL QS Review
15
CMCs TCL Review Board Members
CMC Review Process Intra-Regional
CMC Review Process Inter-Regional
  • A CMC Review Platform was created for helping to
    coordinate Inter-RMO review processes

CMC Review Status
TCL QS Review
16
CMCs Review Status
CMC Review Process
CMCs Review Status
Submission to TCL for intra-regional review
Current status of TCL CMCs
  • CMCs of NPLI (APMP.L.3.2006), clarifying
    inter-RMO review comments
  • CMCs of KIM-LIPI (APMP.L.4.2006), submitted for
    inter-RMO review
  • CMCs (7) of NMISA (ZA), processing for APMP
    inter-RMO review

Submission to TCL for inter-regional review
  • EUROMET.L.4.2006 Completed

TCL QS Review
17
Other Topics
  • Participated in CCL/CCL-WGDM/CCL-CCTF meetings at
    BIPM from 10-14 Sep 2007
  • TCL meeting/workshop to be held from 2930 Oct
    2007 prior to the 23rd GA
  • - TCL/TCTF joint workshop on optical
    frequency metrology
  • - TCL workshop on CMM metrology
  • Website for TCL activities
  • URL http//www.nml.org.tw/apmptcl/
  • Password for the downloads apmptcl2004
Write a Comment
User Comments (0)
About PowerShow.com