Title: Dr. Michael Geyer Abengoa Solar, Director International


1
Dr. Michael GeyerAbengoa Solar, Director
International ESTELA Vice-President 21 October
2009
2
INDUSTRY MEMBERS OF ESTELA
3
(No Transcript)
4
(No Transcript)
5
(No Transcript)
6
(No Transcript)
7
(No Transcript)
8
(No Transcript)
9
  • STE Technologies - 1
  • Parabolic Trough Plants
  • Size ? 50 to 300 MW
  • Proven technology
  • Commercial operation since 1984
  • Preferred technology for new plants in the
    USA, Spain, and North Africa

STE Mediterranean Solar Plan - 9
10
  • STE Technologies - 1
  • Central Receiver Plants
  • Size ? 10 to 50 MW
  • Demo plants built in the 80s
  • Two commercial plants in
  • operation in Spain
  • (10 and 20 MW) and another
  • one under construction (17 MW 15h
    storage)
  • Larger projects announced in the USA

STE Mediterranean Solar Plan - 10
11
  • STE Technologies - 1
  • Dish Stirling Systems
  • Size ? 10 to 25 kW (modular)
  • Several small-scale
  • installations in operation
  • Utility-scale installations
  • slated for construction in 2010
  • Applications appropriate for both
    stand-alone and utility-scale projects

STE Mediterranean Solar Plan - 11
12
  • STE Technologies - 1
  • Linear Fresnel Systems
  • Current demonstration projects up to 6 MW
  • Larger plants under development (up
    to 150 MW)

STE Mediterranean Solar Plan - 12
13
Cut down CSP Costs byGeneration in MENA
  • CSP Imports from MENA will significantly reduce
    costs due to better resource and economies of
    scale
  • Establish and monitor Targets for CSP electricity
    import to the entire EU from the MENA Region
  • Account the CO2 Emission reductions of the
    imported CSP electricity in the European emission
    scheme

14
Remove Technical Barriersto Increase
Competitiveness
  • Remove Capacity Limits
  • Remove Annual Operating Hour Limits
  • Allow for full flexibility in Hybridization with
    other Renewables and Conven-tional Power Systems
    to maximize Efficiency and Dispatchability
  • Expand the European Grid to harvest renewable
    power at its resource and distribute it to where
    it is needed

15
Open Transnational Renewable Energy Markets
across Mediterranean, MENA and EU
  • Let renewable electricity cross Intra-European
    borders (Schengen for Green Electrons)
  • Let renewable electricity cross the Mediterranean
    from MENA to the European Union
  • Establish bankable transnational renewable
    transfer tariffs for such interchange

16
Shake Handsbetween MENA and EU
  • Tap Africas unlimited solar resource
  • Share the technology, know how and employment
  • Buildup an industrial and human resource base for
    the implementation of CSP
  • Develop economic relationships and create an
    investment framework by supporting electricity
    market liberalization in MENA
  • Such CSP employment opportunities will offer
    alternatives to emigration

17
Ensure Stable and Bankable Financing Instruments
  • Longterm and stable Feed-In-Tariffs have proven
    as the most efficient instrument for sustainable
    renewable market penetration
  • Ensure that the Kyoto instruments such as CDM and
    JI are applicable to CSP and mechanisms are
    bankable and sufficient.
  • Establish loan guarantee programs via existing
    windows at multilateral banks, existing national
    lending programs and global environmental
    programs such as GEF, UNEP, and UNDP for CSP for
    North Africas developing economies

18
Grant the Future for the Next CSP Generation
  • Next generation technologies will significantly
    drive down costs
  • Pre-commercial demonstration plants allow next
    generation technologies to enter the market
  • Demonstration plants need loan guarantees from
    the EU and multilateral sponsors to cover the
    technology innovation risk

19
  • STE Mediterranean Solar Plan - 3

Mediterranean Solar Plan Employment Projections
by 2020
  • Accumulated Power 20,000 MW
  • Manufacturing Jobs in Europe
  • 40,000 man/year
  • Manufacturing Jobs in North
  • Africa 40,000 man/year
  • Construction Jobs
  • 120,000 man/year
  • Operation Maintenance Jobs
  • 35,280 man/year
  • Total 235,280 man/year

STE Mediterranean Solar Plan - 19
20
  • STE Mediterranean Solar Plan -3

MSP-STE Phases Where Export to Europe Is Required
As far as the financing scheme may require the
export of R.E. electricity from NA to Europe the
following phases could to be distinguished
Phase 1 2009 2012 Enough capacity of the
existing Morocco Spain electrical
interconnection Phase 2 2013 2016 Additional
grid interconnections between NA and Europe (
reinforcement of the existing one) allowing the
export of a large share of the electricity
produced by the new R.E. plants Phase 3 2017
2020 Real European electricity market with a
supergrid of much higher interconnection capacity
inside Europe Phase 4 2021 onwards accelerated
CSP deployment will not require additional public
support
STE Mediterranean Solar Plan - 20