 1Testing
CEN 4010 Class 25  11/22
- Review Class 22 
 - Testing Activities 
 - Test Documentation 
 - Project - Testing 
 
  2Testing Activities
- Unit testing, 
 - Integration testing, 
 - System testing. 
 
  3Unit Testing
- Focuses on the building blocks of the software 
system i.e., objects and subsystems.  - In principle, all the objects developed during 
the development process should be tested. 
Usually not feasible due to budget reasons.  - Many unit testing techniques have been devised 
including equivalence testing, boundary testing, 
path testing, state-based testing, data flow 
testing.  
  4Unit Testing  Equivalence Testing
- Equivalence testing is a blackbox testing 
technique that minimizes the number of test 
cases.  - Possible inputs are partitioned into equivalence 
testing classes, and a test case is selected from 
each class.  - Assumption - system behaves in a similar way for 
all members of an equiv. class.  - Criteria used to determine equivalence classes 
coverage, disjointedness, representation. 
  5Unit Testing  Equivalence Testing
- Example Valid inputs to test the 
getNumberDaysInMonth() method 
Equivalence class Value for month input Value for year input
Months with 31 days, non-leap yrs. 7 (July) 1901
Months with 31 days, leap yrs. 7 (July) 1904
Months with 30 days, non-leap yrs. 6 (June) 1901
Months with 30 days, leap yrs. 6 (June) 1904
Months with 28 or 29 days, non-leap yrs. 2 (February) 1901
Months with 28 or 29 days, leap yrs. 2 (February) 1904 
 6Unit Testing  Path Testing
- Path testing is a whitebox testing technique that 
identifies faults in implementation of the 
component.  - Selected test cases exercises all possible paths 
through the code at least once.  - Technique requires knowledge of the source code, 
unlike blackbox testing techniques.  - Starting point is the flow graph. 
 - A flow graph consists of nodes representing the 
flow of control in the source code. 
  7Unit Testing  Path Testing
Flow graph
- Example Source code 
 - public int count(int x) 
 -  k  0 
 -  while (x lt 10) 
 -  if (x2 ! 0) 
 -  k  k  1 
 -  x  x  1 
 -   
 -  return k 
 -  
 
1
K0
while(xlt10)
2
if(x2 ! 0)
3
kk1
4
Select test cases for x to cover the following 
paths 1, 2, 6 x  ? 1, 2, 3, 5, 2, 6 x  ? 1, 
2, 3, 4, 5, 2, 6 x  ?
xx1
5
return k
6
Every statement and every branch (both outcomes) 
has been executed once. 
 8Testing Activities cont
- Integration testing 
 - Detects faults by focusing on small groups of 
components e.g. methods, classes, packages.  - Two or more components are integrated and tested, 
if no faults are revealed then additional 
components are added and tested.  - Most recently added component is usually the one 
that triggers the most recently discovered fault.  - Note the order in which components are integrated 
can influence the total testing effort i.e. the 
creation of stubs and drivers.  
  9Integration Testing cont
- Several approaches 
 - Big bang testing 
 - Bottom-up testing 
 - Top-down testing 
 - Ordering based on dependencies of components 
 - Big bang  assumes that all components are first 
tested individually and then tested together as a 
single system.  - Debugging is a problem, i.e., where is the fault? 
 - Reduces the  of stubs and drivers required.
 
Traditional 
 10Integration Testing cont
- Bottom-up  individually test each component of 
the bottom layer and then integrate them with 
components of the next layer (assumes a 
hierarchical structure).  - Drivers required to simulate the components of 
higher layers.  - No test stubs are required. 
 - Top-down  unit test the components of the top 
layer first and then integrate the components of 
the next layer down.  - Stubs used to simulate the components of lower 
layers  - Drivers not required.
 
  11Integration Testing cont
- Ordering based on dependencies  a dependency 
graph is created (similar to a class diagram), 
then an order is generated. The leaf 
components are tested first then the inner 
components.  - Problem if graph contains cycles. 
 - Uses stubs in the event of cycles. 
 -  (A Parameterized Cost Model to Order Classes for 
Class-based Testing of C Applications. Malloy, 
et al. ISSRE 2003.) 
  12Testing Activities cont
- System testing 
 - Once components have been integrated, system 
testing ensures that the complete system complies 
with the functional and nonfunctional 
requirements of the system.  - At this point most of the faults in the 
individual components and the interfaces have 
been identified and corrected.  - Testing activities during system testing 
 - Functional testing 
 - Performance testing
 
  13System Testing cont
- Testing activities during system testing cont 
 - Pilot testing 
 - Acceptance testing 
 - Installation testing 
 - Functional testing (or requirements testing) - 
finds differences between the functional 
requirements and the system.  - Blackbox technique 
 - Test cases derived from the use case model 
 - Tester selects those tests that are relevant to 
the user and have a high probability of 
uncovering failures. 
  14System Testing cont
- Performance testing  finds differences between 
goals (nonfunctional requirements) selected 
during system design and the system. Following 
tests are performed  - Stress testing  checks if the system can respond 
to many simultaneous request.  - Volume testing  attempts to find faults 
associated with large amounts of data.  - Security testing  few systematic methods for 
finding security faults. Use experience hackers 
to break into the system to expose faults. 
  15System Testing cont
- Timing tests  attempts to find behaviors that 
violate timing constraints.  - Recovery tests  evaluate the ability of the 
system to recover from errors e.g., 
unavailability of resources, a hardware failure, 
or a network failure.  - Pilot testing (or field test) - system is 
installed and used by a set of users. Two types 
of test  - Alpha test  is a pilot test with users 
exercising the system in the development 
environment. (Bespoke)  - Beta test  acceptance test performed by a 
limited number of end users in the target 
environment. (Generic) 
  16System Testing cont
- Acceptance testing  final stage in the testing 
process before the system is accepted for 
operational use. Three flavors  - Benchmark test  client prepares a set of test 
cases that represent typical conditions under 
which the system should operate.  - Competitor test  new system is tested against an 
existing system or competitor product.  - Shadow testing  new and legacy systems are run 
in parallel and their outputs are compared. 
  17System Testing cont
- Installation testing  system is installed in the 
target environment and evaluated.  - Repeats the test cases executed during function 
and performance testing in the target 
environment.  - Some requirements cannot be tested in the 
development environment so new test cases are 
developed. 
  18Other Testing Activities
- Regression Testing 
 - Recall OO development is an iterative process. 
 - Developers modify, integrate, and retest 
components often, as new features are implemented 
 and/or existing features are improved.  - Note, a modification can introduce side effects 
or reveal previously hidden faults in other 
components. 
  19Other Testing Activities cont
- A system that fails after the modification of a 
component is said to regress.  - Regressing testing is a testing activity whereby 
test are rerun to ensure that the system does not 
regress after a change i.e., the system passes 
all the tests it did before the change.  - There are several approaches used in regression 
testing  - Retest all 
 - Selective retest
 
  20Other Testing Activities cont
- Automated Testing 
 - Manual testing involves a tester 
 - feeding predefined inputs into the system using 
the user interface, a command line console, or a 
debugger,  - comparing the outputs generated by the systems to 
the expected oracle.  - Manual testing can be costly and error prone. 
 - The repeatability of test execution can be 
achieved with automation.  
  21Other Testing Activities cont
- The focus of test automation has been the 
execution of test cases.  - Automation of systems test include specification 
of tests in terms of sequence and timing of 
inputs and an expected output trace.  - The test harness executes a number of test cases 
and compares the system output with the expected 
output trace. 
  22Documenting Testing
- Test Plan  focuses on the managerial aspects of 
testing. Documents the scope, approach, 
resources, and schedule of testing activities.  - Test Case Specification  each test is documented 
by a test case specification . Document includes 
inputs, drivers, stubs, expected outputs of the 
tests, and task to be performed.  - Test Incident Report  each execution of each 
test is documented i.e., the actual results of 
each test and differences from the expected 
output are recorded. 
  23Documenting Testing
- Test Summary Report  list all the failures that 
were discovered during the tests and those needed 
to be investigated.  - Developers analyze and prioritize each failure 
and plan for changes in the system and in the 
models.  - Changes can trigger the creation of new test 
cases and new test executions. 
  24Project- Testing
- Testing Process 
 -  Introduce the testing chapter. 
 - 7.1 System Tests  use format given in class 
(see the example on the class web page).  - 7.2 Subsystem Tests  test at least one 
subsystem or class using a specification-based 
testing technique. This will involve the 
creation of a test driver i.e. a main in the 
package containing the subsystem or class. Use a 
similar format to that in section 7.1 to document 
the tests performed. Include the code for the 
test driver in appendix G. 
  25Project- Testing
- 7.2 Evaluation of Tests  evaluate how 
successful the tests were in terms of adequacy 
and coverage (see example on the class web page).  - Appendix G  Test Driver. 
 - Go through test case format on web page.