MARS 2020 Kick-Off Meeting 13 November 2002 Georgia Tech - PowerPoint PPT Presentation

About This Presentation
Title:

MARS 2020 Kick-Off Meeting 13 November 2002 Georgia Tech

Description:

Percentage of time where there was at least one unconnected node. MARS 2020 Kickoff ... Georgia Institute of Technology. Time Until Completion. MARS 2020 ... – PowerPoint PPT presentation

Number of Views:23
Avg rating:3.0/5.0
Slides: 16
Provided by: tucker7
Category:

less

Transcript and Presenter's Notes

Title: MARS 2020 Kick-Off Meeting 13 November 2002 Georgia Tech


1
MARS 2020 Kick-Off Meeting13 November 2002
Georgia Tech
2
Personnel
  • Faculty
  • Prof. Ronald Arkin
  • Prof. Tucker Balch
  • Dr. Robert Burridge
  • Students
  • Keith OHara
  • Matt Powers
  • Patrick Ulam
  • Alan Wagner

3
Georgia Techs Research Tasks
  • Employ information about the network (BBN) as a
    sensor for communication sensitive behaviors
  • Develop and assess
  • Communication sensitive behaviors
  • Communication sensitive mission specification
    tools
  • Communication sensitive planning (a la Paytons
    internalized plans)

4
Current Focus
  • Infrastructure building (MissionLab)
  • Addition of 3-dimensional simulation and
    behaviors.
  • Visualization tools.
  • Integration of BBN communications models.
  • Support for heterogeneous teams.
  • Methodologies
  • Metrics
  • Some initial experiments

5
Some Initial Results
  • Task for a robot team
  • Navigate to a goal location while maintaining
    fully connected comm network.
  • Environment
  • 200 x 200 meter arena.
  • Scattered, comm-blocking obstacles.
  • Approach
  • Integrate preserve-comm motor schema with other
    navigational schemas.

6
Navigation without Preserve-Comm
7
Navigation with Preserve-Comm
8
Scenario 1
  • 1 Goal
  • 4 Robots spaced by 15m
  • 200m x 200m arena
  • 15 Obstacle coverage
  • 20 random worlds

9
Scenario 2
  • 4 Goals
  • Visited in order
  • 4 Robots spaced by15m
  • 200m x 200m arena
  • 15 Obstacle coverage
  • 20 random worlds

10
Metrics to Assess Performance
  • Time Until Completion
  • Length of experiment.
  • One Network
  • Percentage of time spent as one network.
  • Full Network
  • Percentage of time spent as a fully connected
    network.
  • Loners
  • Percentage of time where there was at least one
    unconnected node.

11
One Network
12
Full Network
13
Loners
14
Time Until Completion
15
Next Steps
  • Continue
  • Infrastructure building.
  • Continued integration of BBN communications
    models.
  • Development and assessment of comm-sensitive
    behaviors.
  • Begin
  • Integration with UPenn and USC vehicles.
  • Integration of plans as resources.
Write a Comment
User Comments (0)
About PowerShow.com