Title: ACTT WORKSHOP


1
MDOT
I-94 Acclerated Construction Technology Detroit,
Michigan April 17-19, 2007
ACTT WORKSHOP
2
MDOT ACTT WORKSHOP
  • UTILITIES/ RAILROAD
  • COORDINATION
  • Final Presentation

3
Utilities/Railroad Coordination
  • Team Members
  • Marion Leaphart, Utility Director, Coleman-Snow
    Consultants, (Retired Utilities Manager, SC DOT)
  • Veena Jasuja, MDOT, Detroit TSC
  • Nick Lefke, MDOT, Lansing, Real Estate
  • Bill Stonebrook, MDOT, Lansing, Design
  • Steve Rapp, MDOT, Lansing, Design
  • Facilitator
  • Anu Taneja, MDOT, Lansing, Contract Services
  • Notes
  • Lynn Venturino, MDOT, Lansing, Design Support

4
Utilities
5
Designate a full time MDOT utilities coordinator
  • Oversee all aspects of utility coordination,
    communication, and cooperation during design and
    construction
  • Act as go to person for MDOT, utilities, and
    vendors

6
Utilize Subsurface Utility Engineering (SUE)
  • Have SUE provider available during design and
    construction
  • Update current SUE data
  • Utilize SUE deliverables effectively with
    stakeholders
  • Expedites conflict resolution

7
Identify and resolve municipal utility issues
  • Early and often involvement of municipal
    utilities
  • Early identification of potential show stoppers
  • Identify all relocation and proposed new work
  • Coordination with stakeholders

8
Identify and resolve private/public utility
issues
  • Early and often involvement of private/public
    utilities
  • Early identification of potential show stoppers
  • Identify all relocation and proposed new work
  • Identify reimbursable relocations
  • Advanced utility relocations
  • Coordination with stakeholders

9
Participate in preliminary engineering costs for
private/public utilities
  • Provides incentive to private/public utilities to
    cooperate in a timely manner
  • Increases cooperation during design phase

10
Railroads
11
Form Steering Committee of officials from MDOT
and Railroads (RR)
  • Authority to make high level decisions
  • Expedite RR decision making (i.e. trackage
    rights, union work rules, etc.)

12
Form a Design Engineering Committee
  • Early and often involvement of railroads
  • Early identification of design constraints
  • Early identification of potential show stoppers

13
Provide adequate time for RR coordination in
the MDOT process
  • Two year minimum coordination time
  • Coordination time begins from submittal of
    preliminary plans from MDOT to RR

14
Contract with qualified vendor to perform RR
coordination
  • Vendor must be knowledgeable in RR operations
  • Effective in obtaining RR approvals
  • Involve MDOT RR experts in vendor selection
    process

15
Coordinate at-grade crossings with service roads
  • Diagnostic Team Review (DTR) meeting should take
    place well in advance of construction, if
    required

16
Maintenance of RR traffic
  • Early and often involvement of RR
  • Construct temporary runaround shoo-fly tracks
  • Part width bridge construction
  • Roll-in/lift-in superstructure
  • Build new permanent bridges parallel to existing
    RR
  • Trackage rights agreements between RR during
    construction

17
Possible elimination of two RR structures over
I-75
  • RR approval required

18
Questions