HighRise Fire Alarm System Operation in the City of Chicago - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

HighRise Fire Alarm System Operation in the City of Chicago

Description:

... Rise Fire Alarm System Operation in the City of Chicago. Presented by: ... Thank You from Siemens Building Technologies, Inc. and the Chicago Fire Department. ... – PowerPoint PPT presentation

Number of Views:221
Avg rating:3.0/5.0
Slides: 16
Provided by: cfdconf
Category:

less

Transcript and Presenter's Notes

Title: HighRise Fire Alarm System Operation in the City of Chicago


1
High-Rise Fire Alarm System Operation in the City
of Chicago
  • Presented by
  • Morrie Mastrangeli
  • Pete Van Dorpe
  • Adam Tappen

2
Agenda
  • Classification of Building Types
  • System Classification
  • Fire Detection and Alarm Systems
  • High-Rise Requirements/Preparation
  • Utilizing the System in an Emergency
  • Issues
  • Questions

3
Building Classification
  • Occupancy Classification
  • Age
  • Height
  • ......Allows for System Classification

4
System Classification
  • Class I - System Overview
  • General Alarm
  • Automatic Evacuation
  • Auxiliary Valve Supervisory CP
  • Auxiliary Duct Detection CP
  • City Tie Box
  • Trouble Bell
  • Back-Lit Alarm Annunciator
  • Typically School and Daycare Occupancies

5
System Classification
  • Class II System Overview
  • Automatic Pre-Signal Coded Alarms
  • Auxiliary Valve Supervisory CP
  • Auxiliary Duct Detection CP
  • City Tie Box
  • Trouble Bell
  • Back-Lit Annunciator
  • Typically Hospital, Nursing Home and Jail
    Occupancies

6
High-Rise Fire Detection and Alarm Systems in
Chicago
  • Fire Command Center Requirements
  • Fire Detection Components
  • Supervisory Signal Components
  • One-Way Voice Communications
  • Two-Way Voice Communications

7
High-Rise Fire Detection and Alarm Systems in
Chicago
  • Smoke Control
  • Annunciation
  • Monitoring
  • Elevator Recall
  • Stair Door Unlocking
  • Status Monitoring

8
High-Rise Building Categories
  • Category 1 Over 750 ft.
  • Category 2 Over 540 ft. and Including 780 ft.
  • Category 3 Over 275ft. and Including 540 ft.
  • Category 4 Over 80 ft. and Including 275 ft.

9
Fire Department Deployment
  • Fire Investigation Team
  • Must be 1 Engine/1 Truck
  • Truck must dedicate 1FF to Lobby and 1 FF to
    Elevator
  • Lobby FF begins Lobby Control process
  • Assess systems and Establish Priorities!!!
  • Make announcements
  • as directed

10
Fire Department Deployment
  • 3rd Arriving Engine becomes Lobby Control Company
  • Confer with I.C. and Lobby Firefighter
  • Man the Communications Panel
  • Complete Checklist

11
Communications Panel Template
  • Communications protocol must be part of SOPs
  • Template mounted in panel
  • Template carried by FD
  • personnel

12
Tracking and Documentation
  • Stairwell phones
  • Elevators
  • Stair door locks
  • Phone numbers
  • Building personnel
  • PA announcements

13
High-Rise Fire Operation
  • Requirements/Preparation
  • Who is on scene to assist during a fire
  • Commercial vs. Residential
  • Evaluation and Prioritization of Signals
  • Utilization of System Features
  • Annunciation, Voice Communication, Elevator
    Controls
  • Reading the LCD Annunciator
  • Evacuation Philosophies and Planning

14
Issues to Consider
  • Post Incident Actions
  • Resetting, repairing, restoring..
  • False Alarm Issues
  • Environmental concerns, applications mistakes,
    reoccurring issues

15
Questions?
  • Thank You from Siemens Building Technologies,
    Inc. and the Chicago Fire Department