Datacentre Optimisation Solutions from Platespin - PowerPoint PPT Presentation

1 / 88
About This Presentation
Title:

Datacentre Optimisation Solutions from Platespin

Description:

Datacentre Optimisation Solutions from Platespin Mark Round [VCP] Systems Engineer, EMEA PlateSpin Ltd. Euretco Expo Center - Houten FINAL About PlateSpin Global ... – PowerPoint PPT presentation

Number of Views:637
Avg rating:3.0/5.0
Slides: 89
Provided by: markpi8
Category:

less

Transcript and Presenter's Notes

Title: Datacentre Optimisation Solutions from Platespin


1
Datacentre Optimisation Solutions from Platespin
  • Mark Round VCP
  • Systems Engineer, EMEA
  • PlateSpin Ltd.
  • Euretco Expo Center - Houten
  • FINAL

2
About PlateSpin
  • Global independent software vendor (ISV)
  • Founded in 2000
  • Headquartered in Toronto, Canada
  • Offices in UK, Germany, Australia, and USA
  • Global Distribution Re-Seller Channel
  • Over 2000 Satisfied Customers
  • Experts in solutions for virtualised datacentres
  • Recent Awards and Recognition
  • Winners -International Business Awards for 2005
    2006
  • Best Company Overall (2006)
  • Ranked as the 4th fastest growing Canadian IT
    Company

3
Two Thousand Customers
  • Health Care
  • Banking
  • Insurance
  • Pharmaceuticals
  • IT
  • Utilities
  • Education
  • Telecom
  • Financial Services
  • Government

4
Business / Technology Alliances Certifications
5
Channel Model / Technical Certification
  • Build success through partners and strategic
    relationships
  • Industry recognised accreditation (CPSA)
  • Fast track programme for training partner network

6
Goals Agenda
7
Presentation Goals
  • To show you how Platespin products can help you
    with-
  • Sizing new Virtual Infrastructure environments
  • Accelerating Server consolidation projects
  • Optimise the datacentre through intelligent
    software solutions from Platespin

8
Agenda
  • Platespin PowerRecon 2.x
  • Consolidation Planning Module
  • Features
  • Platespin PowerConvert 6.x
  • Features
  • Solution Areas
  • Continuous Datacentre Optimisation
  • QA

9
The PlateSpin Equation
Awareness of Resources

Awareness of Workloads

OS Portability

Optimized Datacenter
10
How PowerRecon Helps
  • Platespin PowerRecon helps you to see
  • What resources are in the datacenter?
  • What workloads are running on those resources?
  • How effectively workloads are assigned to
    resources?

Workload
Resources
11
Life without Platespin PowerRecon
MISSING IN ACTION Datacentre Manager LAST SEEN
Behind communications rack number 7
12
What is a resource?
  • Resources are typically Hardware Assets with
    finite reserves that can be supplied to meet
    demand
  • - In other words - the underlying physical makeup
    of the server hardware

13
What is a workload?
  • Workloads are defined as the operating system,
    applications, and data stack running on a server
    these are seen as demands on the underlying
    resources
  • with 5 quantified dimensions of Processor,
    Memory, Disk I/O, Disk Space, Network I/O

14
Introducing Platespin PowerReconwith
Consolidation Planning Module
Inventory
Utilisation Workload profiling
15
PowerRecon Features and Benefits
  • Key Features
  • No physical contact with servers required
  • Completely AGENTLESS
  • Windows and Linux measurement
  • Virtual hierarchy aware (VMWare / MSVS)
  • Customizable resource and workload reports
  • Quick Start - Ready to run reports
  • Secure and contained data collection and analysis
  • One click monitoring analysis
  • Benefits
  • Not a one-time use product
  • Use for consolidation or ongoing optimization

16
Platespin PowerRecon 2.2Enhancements
  • Data collection capabilities expanded -
  • VMware Infrastructure 3
  • Novell SUSE Linux Enterprise Server 9
  • Scalability enhancements
  • increased number of servers monitored per
    instance of PowerRecon to accommodate larger
    datacentres
  • Application and services workload reports with
    advanced filtering capabilities
  • Detailed processor inventory gathering including
    cores and hyper-threading awareness for Microsoft
    Windows
  • Discover and inventory by IP range or CSV file
    input
  • Enhanced Workload Scaling in Consolidation
    Planning Module

17
Question?
  • Would you like to collect hardware and software
    inventory for 500 servers without leaving your
    chair?
  • Platespin offer Datacentre Server Inventory and
    Discovery for FREE to help you Jump-Start your
    server consolidation projects.

18
Life with Platespin PowerRecon
19
Platespin PowerRecon3 versions
  • (Free Edition)
  • PowerRecon for Inventory
  • HW SW Inventory only (500 servers)
  • Innovative Usage Based Pricing (Pay as you go)
  • PowerRecon for Monitoring
  • 1 per server per day (100 days minimum)
  • Purchase from re-seller or Platespin PowerStore
  • PowerRecon for Planning
  • 2 per server per day (100 days minimum)
  • Purchase from re-seller or Platespin Powerstore
  • Time Limited Offer until November 30th 2006

20
Acclaim for Usage Based Pricing
Usage based pricing is an innovative pricing
structure which will be embraced by datacentres.
By providing pricing structures that do not
depend on CPU power or static allocation of
physical boxes, solutions such as Platespin's are
paving the way to cost structures that are more
equitable and affordable. Bob Gill, Chief
Research Officer of TheInfoPro TheInfoPro (TIP)
is an independent research network and leading
supplier of market intelligence for the
Information Technology (IT) industry
21
Introducing PowerConvert
  • What is OS Portability?
  • Technology that automates the streaming of
    operating system, applications, data between
    infrastructures

Decouple workload from host Infrastructure
Physical
  • NEW
  • FEATURE
  • LIVE
  • TRANSFER

Blade
Peer-to-Peer Workload Movement
Virtual
Deploy or Recover Workload from Archives and
Backups
Image
Reconfigure Workloads Dynamically
OS applications are decoupled from Hardware
22
Starting a Server Consolidation Project
23
4 step approach
  • Inventory Servers
  • servers are added and static data is collected.
  • Collect Data
  • servers are monitored and dynamic data is
    collected.
  • Select Candidates
  • servers are selected for consolidation.
  • Plan Consolidation
  • the most optimal consolidation scenario is
    identified.
  • USING - Platespin PowerRecon Consolidation
    Planning Module

24
Platespin PowerRecon
  • Windows Server with IIS dot NET framework 2.0
  • Platespin PowerRecon Server
  • Platespin PowerRecon Client
  • Database (MSDE) or SQL 2000
  • Can be physical or Virtual MachineMonitored
    Hosts
  • Windows NT4 (needs WMI core), 2000, 2003, XP
  • Redhat Linux
  • MSVS R2, VMWare GSX, VMWare Server, VMWare ESX
    2.x, VI3 / ESX 3.x
  • No need for host agents
  • WMI for Windows, RPC, DCOM
  • /proc/ for Linux, SSH connection
  • Admin / Root or equivalent level credentials

25
Requirements Platespin PowerRecon 2.2
  • Trial Installation 0 to 10 Servers
  • 1 GB memory, Pentium 3, 2.0 GHz, MSDE
    installation acceptable 2 GB limit
  • 4 GB free disk space
  • Small Installation 10 to 100 Servers
  • 2 GB memory, Pentium 4, 2.8 GHz with
    hyper-threading
  • SQL Server, 20 GB free disk space
  • Medium Installation 100 to 250 Servers
  • 4 GB memory, Pentium 4, 2.8 GHz with
    hyper-threading
  • SQL Server, 50 GB free disk space
  • Large Installation 250 to 750 Servers
  • 4 GB memory, Pentium 4, 2.8 GHz dual core or
    multi-processor
  • SQL Server, 100 GB SCSI free disk space
  • Guidelines 250 MONITORED SERVERS PER CPU CORE

26
Requirements
  • Guideline of 250 monitored machines per CPU core
    in the Platespin PowerRecon server
  • Raw Database growth (estimated)
  • 2 MB/server/1 day
  • 60 MB/server/1 month
  • 6 GB/100 servers/1 month
  • 36 GB/100 servers/6 months
  • 15 GB/250 servers/1 month
  • Platespin PowerRecon uses summarisation
    techniques to keep these databases manageable.

27
Step 1 Inventory
  • Install Platespin PowerRecon server into
    environment
  • Define CREDENTIALS
  • Remotely discover servers WITHOUT AGENTS
  • Organise servers by discovered properties (e.g.
    by O/S) or into custom groups
  • Run your 1st Report

28
Step 1 Inventory(All available for FREE)
  • HW Inventory Reports
  • Dynamic interactive reports rank by
  • operating systems
  • installed applications
  • patch levels
  • CPU
  • Memory
  • Network
  • disk resources etc.
  • Acrobat Reader style report viewer
  • Export in wide choice of formats (PDF, Excel etc.)

29
Step 2 Collect
  • Choose RESOURCES for which you would like to
    collect utilization data
  • One click MONITORING
  • Record utilization data over days, weeks, or
    months based on business need

30
Step 2 Collect
  • Higher accuracy of raw counters (Burst Sampling
    Technique)
  • View summary data, or drill down to granular
    levels (counters)
  • Rank servers by CPU, network, disk etc. group
    them for further analysis
  • Rich visualization tools
  • MIN, MAX, AVG, STDEV
  • Generate custom charts export them as BMP, WMF
    or raw values

31
Step 3 Select Plan
  • Ready to run Analysis reports or build your own
    in minutes e.g. Hardware Utilisation Peak
  • Find workloads that do not match their resources
  • Identify sub-optimal servers quickly and easily
  • Create Consolidation Candidate lists for use in
    the Consolidation Planning Module

32
OptimizationPre-requisites
  • Consolidation Candidates

Target Server Templates
Scale-up Scale-out
33
Server Consolidation Assessment
  • Create Target Server Templates
  • Define templates for scale-up / scale-out
  • Define if used in Consolidation to Virtual
    Infrastructure or NONE

34
Server Consolidation Assessment
  • Create new Consolidation Project
  • Select Candidates from Logical Group / or Filters
  • Select Time range Dimensions

35
Create Project Calculate Workloads
5D Workloads Time Profile
  • Consolidation Candidates

36
Server Consolidation AssessmentProjects Explorer
  • Create new Scenario (Determine minimum number of
    servers)

37
Optimization
  • Create a scenario
  • Find the minimum number of target servers

I. Pack workloads
38
Optimization
  • Create a scenario
  • Find the minimum number of target servers

II. Balance workloads across resources
3
1
2
4
39
Review Scenario Report Charts
40
View Workload Summary
41
Optimization of freed-up resources
  • Create a scenario
  • Specify the number of target servers

I. Pack workloads
Leftover Workloads
3
1
2
4
42
Compare ALL ScenariosConsolidation Project report
43
Consolidation Planning ModuleFeatures Benefits
  • Benefits
  • Intelligent distribution of workloads across
    available servers to maximize server utilization
  • Balance application workloads by time and
    hardware resource to minimize resource contention
  • Advanced workload sizing and optimization produce
    accurate consolidation plans that minimize cost
    by reducing the need for just in case servers
  • Features
  • Onsite data analysis, visualization and reporting
  • Automated generation of consolidation plans and
    reports
  • What-if, scale-out and scale-up scenarios
  • Implement scenarios using Platespin PowerConvert
    6.0

44
IntegrationPlatespin PowerRecon 2.2 / Platespin
PowerConvert 6.0
  • Platespin PowerRecon Platespin PowerConvert
    integration
  • Implement scenarios from consolidation project

45
Implementing Scenarios
  • When the job is initiated, PowerRecon
  • Authenticates the servers
  • Creates and runs server discoveries for
    PowerConvert
  • Creates and saves conversion jobs
  • In Platespin PowerConvert
  • Load pre-built JOB
  • Amend any final configuration details
  • START the job
  • Optionally monitor while the conversion completes
  • P2V complete !

46
PlateSpin PowerConvert
47
The PlateSpin Equation
Awareness of Resources

Awareness of Workloads
Awareness of Workloads

OS Portability

Optimized Datacenter
48
PlateSpin PowerConvert OS Portability
  • Key Features
  • No AGENTS or physical contact required with
    servers
  • Stream servers between physical, virtual and
    image
  • Connect, drag-and-drop, walk away
  • Configure target resources on-the-fly
  • 1 at a time / or / parallel conversions
  • Windows and Linux
  • Built on .NET API
  • Benefits
  • 501 time savings
  • Single point of control
  • Use to solve multiple problems in the data center

49
PlateSpin PowerConvert Infrastructure Support
Sources Targets
Physical Server Physical Server
Blade Server Blade Server
VMware ESX Server VMware ESX Server
VMware Server VMware Server
Microsoft Virtual Server Microsoft Virtual Server
PlateSpin Flexible Image PlateSpin Flexible Image
Symantec Ghost
Symantec LiveState
Acronis TrueImage
NSI Doubletake
Veritas BackupExec
Raw Volumes
Operating Systems that can be Moved
Windows NT4, 2000, 2003, XP Professional
Redhat Linux / SLES 9
50
Platespin PowerConvert 6.x
RESOURCE POOLS
51
Platespin PowerConvert
  • Windows Server with IIS dot NET framework 2.0
  • Platespin PowerConvert Server
  • Platespin PowerConvert Client
  • Database (MSDE) or SQL 2000
  • Can be physical or Virtual MachineInventory
    Requirements
  • Windows NT4, 2000, 2003, XP
  • Redhat Linux, SuSe 9
  • MSVS R2, VMWare GSX / VMWare Server, VMWare ESX
    2.x, VI3
  • No need for host agents
  • WMI for Windows, RPC, DCOM
  • /proc/ for Linux, SSH connection

52
Platespin PowerConvert 6.0Major Features
  • X2P Driver Management GUI
  • Add drivers for target physical systems x2P from
    a new interface in the Platespin PowerConvert
    client
  • Set Internal / External NICs of Target VM
  • For Warm Standby VM
  • Scalability Enhancements
  • Run up to TWENTY simultaneous jobs
  • PS Analyser / Conversion readiness tool
  • Comes as standard in Platespin PowerConvert
  • De-risks conversion
  • Checks Hardware readiness
  • OS / SP levels
  • PS Analyser analysis runs for every dragndrop
  • And much more

53
OS Portability Solution Areas
54
Server Consolidation(P2V)
CONSOLIDATE TO VIRTUAL OR BLADE INFRASTRUCTURES
AGENTLESSLY AND REMOTELY PERFORM CONSOLIDATION
55
De-Virtualization for Support Integrity(V2P)
DE-VIRTUALIZE
VIRTUAL PRODUCTION MACHINES
PHYSICAL SERVERS
QUICKLY AND EASILY DE-VIRTUALIZE APPLICATIONS TO
MAINTAIN SUPPORT CONTRACT INTEGRITY FOR
COMMERCIAL AND HOMEGROWN APPS
56
Hardware Migration(P2P)
OLD SERVER HARDWARE
NEW SERVER HARDWARE
RACK OR BLADE SERVERS
SIMPLE DRAG-AND-DROP VS. RE-INSTALLING OS,
APPLICATIONS, DATA
57
Geographical Server Migration
MIGRATE ENTIRE DATA CENTERS WITHOUT HAVING TO BE
THERE
58
Hardware Independent Images Provisioning and
DR(x2I2x)
BARE METAL RESTORE
STORE IMAGES ON ANY SERVER
RESTORE TO PHYSICAL SERVER WITH EXISTING OS
RESTORE TO VIRTUAL MACHINE
AGENTLESSLY AND REMOTELY CAPTURE AND RESTORE
59
Disaster Recovery with Physical OR Virtual
Machines(P2V or P2P)
PHYSICAL RECOVERY MACHINE
DIRECT PEER-TO-PEER REPLICATION
VIRTUAL RECOVERY MACHINE
PHYSICAL PRODUCTION SERVER
NO IMAGE CAPTURE REQUIRED
USER OR SERVER RECONNECTS TO VIRTUAL RECOVERY
MACHINE AND RESUMES WORK
AGENTLESSLY AND REMOTELY CONTROL REPLICATION
BETWEEN PHYSICAL AND VIRTUAL BOXES
60
Platespin NSI Double-Take Software
61
PowerSDK API
  • Fully functional API
  • Aimed at advanced In-House developers who need
    to leverage OS portability
  • Aimed at commercial
  • ISV
  • ASP
  • Datacentres
  • Licensed per-named developer

62
PowerConvert 6.xwith Live Transfer
63
Live TransferFunctionality Overview
  • Migrate Windows servers without taking them
    offline or the need to reboot
  • Source / Target servers can be physical or
    virtual
  • Microsoft Exchange and SQL Server applications
    aware
  • PowerConvert will briefly quiet applications
    during transfer to preserve database integrity
  • Transfer during low-to-moderate activity periods
  • Live Transfer is an optional feature

64
Live TransferCompatibility List
  • Operating Systems
  • Windows 2000 Server SP4
  • Windows 2003 Server SP0 / SP1 / R2
  • Windows XP (all service packs)
  • Applications
  • Microsoft Exchange 2000, 2003
  • Microsoft SQL Server 2000, MSDE
  • Virtual Host
  • VMware ESX 2.x, ESX 3.x, VI3
  • VMware GSX, VMware Server 1.0
  • Microsoft Virtual Server, Microsoft Virtual
    Server R2

65
Live Transfer (Highlights)
  • Eliminates need for 3rd party live capture tools
  • Direct streaming from source to Physical, Virtual
    or Image
  • Images are hardware independent deploy to P or
    V
  • Live Transfer captures the server at a
    point-in-time
  • Technology is Application aware (Exchange / SQL)
  • Source and Target machines have ON / OFF states
    for greater flexibility control
  • VM can be suspended for faster RTO (Recovery Time
    Objective)

66
Upgrading to VI3?Use Platespin PowerConvert for
V2V
67
The challenges of upgrading
  • VMwares recommended upgrade process is not
    reversible
  • VMs have to be powered-off
  • Manual method does not allow for failback
  • Manual method requires greater periods of
    downtime
  • Manual method is error-prone

68
Its as easy as 1,2..3
  1. Discover ESX 2.x Server Source VM
  2. Discover ESX 3.x Server
  3. Drag and Drop Source VM to VI3, Configure Job
    press START

ESX 3.x
User works remotely from single migration console
69
Migrating your ESX 2.x VMs to VI3
  • Platespin PowerConvert
  • Single GUI for conversions
  • Can be done remotely
  • Can be scheduled in advance
  • No Agents / No Scripts
  • Run one at a time or in Parallel
  • Old ESX 2.x VM
  • Remains unchanged
  • Minimise downtime using LIVE TRANSFER
  • Streamed over LAN / WAN
  • No need for shared storage
  • Stream to New ESX 3.x VM
  • Is a new VM - native to VI3
  • Created where you need it
  • Adjust resources on-the-fly
  • vSMP to 4 way
  • Resource Pool
  • Re-Size Disks / Partitions / Free space
  • Choose Datastore location for the vDisks
  • New VMware Tools installed automatically
  • New VM can be tested before de-commissioning the
    old ESX 2.x VM
  • Only downtime is when we inject new Virtual
    Hardware (1 to 5 minutes)

70
VMware Infrastructure 3 Upgrade The
PowerConvert Difference
  • Leverages proven OS Portability technology to
    create a native VI3 VM and streams the contents
    of the ESX 2 VM into the new target
  • Manage your VI3 migration projects with maximum
    flexibility and robustness
  • Provides greater flexibility and significantly
    reduces migration risk of failure
  • V2V is not a new concept for Platespin
  • Microsoft VS to VMware migrations
  • GSX to ESX etc. since last 2005

71
PowerConvert WorkflowExample P2V
72
PlateSpin PowerConvertHow it Works
Source Servers
PowerConvert Server
Target Virtual Host
PowerConvert Client
Three step conversion process - Remotely discover
and inventory server - Configure conversion job -
Start the conversion and optionally monitor
73
Source Servers
PowerConvert Server
Target Virtual Host
PowerConvert Client
Remotely Discover Server Details PowerConvert
discovers and inventories source and target
server using supplied hostname/IP and valid
credentials Discovered details used to - Review
business use of server to plan consolidation -
Auto configure conversion job
74
PlateSpin PowerConvertHow it Works
Source Servers
PowerConvert Server
Target Virtual Host
PowerConvert Client
Three step conversion process - Remotely discover
and inventory server - Configure conversion job -
Start the conversion and optionally monitor
75
Source Servers
PowerConvert Server
Target Virtual Host
PowerConvert Client
  • Configure and Start a Conversion Job
  • With the server details discovered a conversion
    job can be auto configured with a drag and drop
  • - Right sizing can be done via the job
    configuration

76
PlateSpin PowerConvertHow it Works
Source Servers
PowerConvert Server
Target Virtual Host
PowerConvert Client
Three step conversion process - Remotely discover
and inventory server - Configure conversion job -
Start the conversion and optionally monitor
77
PlateSpin PowerConvertHow it Works
Source Servers
PowerConvert Server
Target Virtual Host
PowerConvert Client
Create New Virtual Machine - PowerConvert
remotely installs a controller on the target ESX
Server - PowerConvert creates a new virtual
machine
78
PlateSpin PowerConvertHow it Works
Source Servers
PowerConvert Server
Target Virtual Host
PowerConvert Client
Take Control - PowerConvert takes control of new
virtual machine and source server - Purpose is to
boot source and destination so data can be
transferred with integrity - Source machine is
not altered
79
PlateSpin PowerConvertHow it Works
Source Servers
PowerConvert Server
Target Virtual Host
PowerConvert Client
Data Transfer - Virtual machine disks are
partitioned and formatted - Source data is
streamed directly into the virtual machine
without use of temp space - Copied operating
system is configured to run in virtual environment
80
PlateSpin PowerConvertHow it Works
Source Servers
PowerConvert Server
Target Virtual Host
PowerConvert Client
Release Control and Configure - New VM is booted
(control is released) - PowerConvert configures
the VM as per the job configuration (e.g.
network, hostname, domain, etc)
81
PlateSpin PowerConvertHow it Works
Source Servers
PowerConvert Server
Target Virtual Host
PowerConvert Client
Release Source Server - PowerConvert releases
control of source server if specified in the job
(e.g. avoid duplicate IP) - Conversion is
complete and the new virtual machine is now ready
for operation - PowerConvert saves server
details, can be refreshed later as needed
Conversion Complete
82
Integrated suite approach to consolidation
83
In Summary
  • Inventory
  • Build an accurate picture of server resources for
    effective planning
  • Collect
  • Gather real workload data to make accurate
    consolidation decisions
  • Plan
  • Run different what-if scenarios to maximise
    utilisation and minimise cost (with Consolidation
    Planning Module) Build Platespin PowerConvert
    jobs directly from Consolidation Plan
  • Implement
  • Efficiently manage any size of consolidation
    project with remote, automated, and fully
    configurable conversions

84
Q A
85
Summary
  • Platespin offer the only end-to-end software
    solution suite for consolidation
  • CPSA Industry recognised certification
    programme
  • The only 100 automated hardware independent
    migration software
  • Physical, virtual, images
  • Used for multi-purposes
  • Server Consolidation
  • Disaster Recovery
  • Test Lab Automation
  • Lease Migration / Data Center Relocation
  • Server Provisioning
  • Designed for long-term use to achieve optimized
    data center

86
Thank You
87
Pricing and Licensing
88
Platespin PowerConvertVersions
  • Platespin PowerConvert for Server Consolidation
  • Per Conversion License model
  • Restricted for P2V or P2P operations only
  • Platespin PowerConvert for Recovery
  • Licensed per PROTECTED Server OS Instance
  • x2I2x (3 step conversion process)
  • Uses Platespin Image Server technology
  • Platespin PowerConvert Universal
  • Anywhere-to-Anywhere
  • Peer-to-Peer conversions
  • Licensed Per Server

89
Pricing Licensing
  • PowerRecon
  • Starts at 1 per server per day
  • Perpetual licenses available
  • Download free edition at http//www.platespin.com
  • PowerConvert
  • Starts at 100 per conversion
  • Perpetual licenses available
  • Request evaluation / demo with your Platespin
    partner today
  • Web seminars every Tuesday reserve your space _at_
    http//www.platespin.com/events

90
See. Think. Respond.
Write a Comment
User Comments (0)
About PowerShow.com