Title: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25
1PRESENTATIONNATIONAL FLOOD PROOFING
CONFERENCETAMPA, FLORIDAMARCH 25 29,
2002FLOOD CONTROL AMERICAINVISIBLE FLOOD
CONTROL WALLTM www.floodcontrolam.com
2 MARCH 1997 VENLO, HOLLAND, MAAS
RIVER PHOTO ENCOMPASSES THIS PRESENTATION
FLOOD PROTECTION THAT PRESERVES URBAN
RIVERSIDE LIFE REVOLUTIONARY DEMOUNTABLE FLOOD
CONTROL WALL
3 EVOLVED FROM COLOGNE, GERMANY MID
1980S REPETITIVE RHINE RIVER
FLOODING PATENTED INTERNATIONALLY SET THE
FLAME BURNING FROM WITHIN
4 ONE MONTH LATER.A DISASTROUS FAILURE STORY
EAST GRAND FORKS, MN GRAND FORKS, ND RED
RIVER 4/97 FLOOD OF RECORD EARTHEN LEVEE
FAILURE AND OVER-TOPPING
5EAST GRAND FORKS, MN 4/97FLOOD LEVEL
LINE(8) DRY BUILDINGS REMAINING IN CITYGARY
SAUNDERS, CITY ENGINEER, THERE MUST BE A BETTER
WAY.
6 EAST GRAND FORKS, MN.TODAY A WONDERFUL SUCCESS
STORYFOR FCA A FIVE YEAR CONTINUING
STRUGGLE.SELLING A NEW IDEA TO SOLVE THE
NATIONS FLOODING PROBLEMSSCULPTURE AT
CABELAS, A NEW BUSINESS
7 CABELAS LOCATED 200 FT BEHIND IFCWTM
8STATUE REPRESENTS IFCWTM PROGRESS.BLUE MOOSE
RESTAURANTNORTH ABUTMENT OF IFCWTM EAST GRAND
FORKS, MNIFCWTM. A DEMONSTRATION PROJECT BUILT
IN 1999EDA, FEMA, STATE OF MN, ST. PAUL COE,
CITY OF EAST GRAND FORKS
9 THIS PRESENTATION EMPHASIZES SUCCESS LOUISVILLE
, KY OHIO RIVER NEW LOUISVILLE SLUGGER FIELD
COMPLETED 4/2000 NOTE IFCWTM SILL PLATE
10 REVISITING THE OLD CHAOS AND
DESTRUCTION REPETITIVE WASTE AND LOSS MONEY
DOWN THE DRAIN
11 A SWEET SUCCESS STORYAPRIL 2001 FARGO, ND
RED RIVER OF THE NORTH OAK GROVE LUTHERAN
SCHOOL 1997 FLOOD OF RECORD 3.5 MILLION DAMAGE
12 OAK GROVE SCHOOL PROJECT BUILD TIME FIVE
MONTHS IFCWTM (5) ACCESS CLOSURES PLANKS
READY FOR INSTALLATION
13 ACCEPTANCE INSTALLATION FEBRUARY 2001 (5)
CLOSURES HEIGHT 4 - 6 FT WIDTH 10 - 17
FT TIME 1.25 HOURS CREW OF SIX
14 THEN A FLOOD HAPPENED! 3 MONTHS LATER
APRIL 2001 LACK OF CHAOS AND
DESTRUCTION NOTE THE CURRENT FLOW
15 FARGO, ND SUCCESS STORY RED RIVER CHANNEL
BACKGROUND PARK, STREET
16 FLOOD HEIGHT 2 FT OR FLOW RIGHT TO LEFT
BACKGROUND CHANNEL A SCHOOL IS SAVED
17 NEW IFCWTM TECHNOLOGY AT WORK LOUISVILLE,
KY UTILIZATION OF HISTORIC RAILROAD
STATION ADJACENT TO OHIO RIVER
18RIVERSIDE DEVELOPMENT
19 JANUARY 1937 FLOOD OF RECORD COE CONCRETE
WALL 21ST CENTURY CHANGING NEEDS
LOUISVILLE DISTRICT COE AUSPICES
20 EXISTING COE CONCRETE WALL REMOVED TO SUB
GRADE IFCWTM INSERTED INVISIBLE WALL A
RESULT
21 HOW DOES IT WORK? THREADED DAYTON
ANCHOR POSITIONED DEEP INTO CONCRETE FOUNDATION
22 IFCWTM SILL PLATE POSITIONED ON TOP OF
FOOTING COMPONENTS SET INTO CONCRETE FOUNDATION
23 IFCWTM WALL INSTALLATION PLACE VERTICAL
PARTING SUPPORTS BOLT PASSES THROUGH SILL PLATE
INTO THREADS OF ANCHOR LOCATED IN CONCRETE
FOUNDATION
24 NEXT.PATENTED ALUMINUM PLANK SEALED TONGUE
AND GROOVE DESIGN SIDE THRUST
RESISTANT BASE PLANK FOOT PROFILE - SEALED
25BASE PLANK ORIENTS WET/DRY SIDESEALS ON
PLANK AND VERTICAL DRY SIDECONTINUOUS DRY SIDE
SEAL ALWAYS FACES DRY SIDE NOTE VERTICAL
LOCKING HANDLEPLANK IS ALLOWED TO FILL WITH
WATER AS FLOOD WATERS RISE
26 20 FT LENGTHS ON THIS IFCWTM
PROJECT STANDARD PLANK DESIGN, MAX LENGTH 35
FT PLANK WEIGHT 4.5 POUNDS/LN FT FOUR MEN
TO INSTALL
27 LOUISVILLE WALL DIMENSIONS 700 FT
LENGTH 4 FT 9 FT HEIGHT FIRST TIME
INSTALLATION 8 MEN 12 HOURS
28 INTERMEDIATE AND PARTING SUPPORTS HOLD DOWN
CLAMPS TIGHTEN NUTS ON THREADED RODS DRAWS
SEALS TO A SQUEEZE SET TIGHTA SUCTION POP
WHEN DISMANTLING
29THE INVISIBLE FLOOD CONTROL WALLTM STRUCTURAL
FLOOD CONTROL. NOT AS YOUVE KNOWN IT
IFCWTM.. MINGLES EASILY WITH URBAN SCENE!!
30IFCWTM SILL PLATE ALLOWS UNIMPEDED FOOT TRAFFIC
AND DELIVERY VEHICLE ACCESS DIRECTLY OVER
INVISIBLE WALL BASE.
31 IFCWTM.PROTECTS, PRESERVES AND
RECONNECTS ENJOY DONT DESTROY THE RIVER
32 BRECKENRIDGE, MN RED RIVER OF THE
NORTH PROTECT AND PRESERVE HEADWATERS
PARK.CULTURAL SHRINE 5 FT CONCRETE WALL AND
IFCWTM 4/97 3 FT OF FLOOD WATER
33 BRECKENRIDGE INSTALLATION IFCWTM WALL 4 FT
X 90 FT 4 TO 6 MEN 1 ½ - 2 HOURS
34 BRECKENRIDGE, MN WET SIDE FOUNDATION FLUSH
TO GROUND ALL STANDARDIZED COMPONENTS
35 STORAGE 4 FT X 90 FT COMPLETE ONE PALLET 10
FT X 5 FT X 5 FT VERTICAL SUPPORTS, LOCKING
HANDLES HOLD DOWN CLAMPS
36 EAST GRAND FORKS, MN APRIL 2001 RED
RIVER FLOOD GAUGE ON BRIDGE ABUTMENT 4/97
FLOOD OF RECORD ALMOST TO TOP
37 IFCWTM EAST GRAND FORKS, MN 2001 RED
RIVERALMOST A FLOOD WITHIN 1 FT OF WALL
38EAST GRAND FORKS, MN IFCWTM VISIBLEMAXIMUM
HEIGHT 10 FT ON TOP OF PARAPET WALL1997 FLOOD
EQUAL TO LEVEL OF TOP OF CONCRETE
WALLINTERMEDIATE AND PARTING SUPPORT INSTALLED
39 EAST GRAND FORKS, MN IFCWTM SAME VIEW
INVISIBLE 99 OF THE TIME CITY EMPHASIZING
RIVER HERITAGE
40 EAST GRAND FORKS, MN APRIL 2001 WET SIDE
VISIBLE PARTING SUPPORTS MAXIMUM
DIMENSIONS 14 FT X 880 FT
41 WET SIDE INVISIBLE LIFE AND BUSINESS AS
USUAL NO LACK OF INVESTOR CONFIDENCE
42 EAST GRAND FORKS, MN DRY SIDE PARTIAL
INSTALLATION DIAGONAL BRACES NOT INSTALLED
43 EAST GRAND FORKS, MN DRY SIDE VIEW INVISIBLE
44ON A COLD SPRING DAY, ONE CAN SEE THE PROMISE OF
SUMMER SIDEWALK TABLES AND COMMUNITY ENJOYMENT OF
THE RED RIVER THANKS TO THE IFCWTM
45 IFCWTM. SAVED A CITYS SOUL PROVIDES BENIGN
FLOOD PROTECTION 33 MILLION NEW BUSINESS
INVESTMENT 5 YEARS FLOURISHING CITY CENTER
ST. PAUL DISTRICT COE AUSPICES
46EAST GRAND FORKS, MNIFCWTM AWARD WINNING
47 CLOSURE REVIEW SIMILAR TO OAK GROVE
SCHOOL.VENLO, HOLLAND TYPICAL CLOSURE 8 FT X
20 FT FLUSH SILL PLATE ABUTMENT CONTAINING
LOCKING HANDLES
48 CAIRO, IL REPETITIVE FLOOD
HISTORY SOUTHERN TIP OF ILLINOIS PENINSULA
FORMED BY MISSISSIPPI AND OHIO RIVERS
49 MEMPHIS DISTRICT COE AUSPICES CAIRO, IL
IFCWTM CLOSURES (6) DIMENSIONS 16 - 18 FT X 4
- 10 FT INSTALLATION VERTICAL SUPPORTS AND
DIAGONAL BRACE
50 CAIRO, IL WET SIDE STACKING ALUMINUM
PLANKS TWO MAN JOB USER FRIENDLY
51 CAIRO, IL OHIO RIVER DRY SIDE DIAGONAL
BRACES.PIN CONNECTED THRUST SHOE/TENSION
ROD COESOLE SOURCE PURCHASE
52CEDAR FALLS, IA ROCK ISLAND COE DISTRICT
AUSPICES (3) CLOSURES WIDTH 20 FT
HEIGHT 8 FTSTREET, RAILROAD, BICYCLE PATH104
FT X 7 FT WALL IFCWTM PROTECTS NATIONAL ARCHIVE
BUILDING
53 CEDAR FALLS, IA IFCWTM MORE
INGENUITY! RAILWAY CLOSURE SPACER TO
BRIDGE RAIL HEIGHT OTHERWISE STANDARD
COMPONENTS
54 SHELBY, OH WAREHOUSE FACILITY DOORS FLOOD
PROOFING ATTACHED TO CONCRETE FOUNDATION
55 SHIPPING RAMP NO PROBLEM!
56 LOUISVILLE BASEBALL STADIUM PLAYING FIELD
ACCESS CLOSURE OHIO RIVER LOOMS IN BACKGROUND
57 CLOSURE 8 FT X 26 FT WET SIDE
VIEW ACCEPTANCE INSTALLATION ALL COMPONENTS
STANDARDIZED
58 EAST GRAND FORKS, MN STATE HIGHWAY CLOSURE ONE
OF THREE CLOSURES DIMENSION 60 FT X 14 FT
IFCWTM VISIBLE.WET SIDE TWO MORE CURRENTLY
BEING INSTALLED
59 EAST GRAND FORKS, MN STATE HIGHWAY 2 60 FT X
14 FT DRY SIDE VISIBLE DIAGONAL BRACES
60INVISIBLE CLOSURE 60 FT X 14 FTON A TYPICAL
DAY.TRAFFIC PASSING THROUGH THE MAIN GATE
CLOSURE INTO EAST GRAND FORKS CITY CENTER
61 IFCWTM PROTECTS WORLD FAMOUS VELAUS
RESTAURANT VENLO, HOLLAND MAAS RIVER 1996
FLOOD LEVEL TO WINDOW SILL RESTAURANT VISUAL
PLEASURE OF CLASSIC RIVERSIDE VIEW
62 VENLO, HOLLAND SILL PLATE STANDARD
COMPONENTS A CITY CENTER THRIVING WITH IFCWTM
63 FARGO, ND.FARGODOME UNIVERSITY OF
NORTH DAKOTA
64OVERLAND FLOODING YEAR 2000INDOOR STADIUM
FLOODED.BUILDING AND FIELD INUNDATED.SOLUTION
IFCWTMINVISIBLE WALL 110 FT X 8 FT
65 REPETITIVE THEME..STANDARDIZED COMPONENTS
FROM VENLO, HOLLAND TO FARGO, ND
66 IFCWTM INVISIBLE IFCWTM.IS A PROBLEM
SOLVER OVER (40) INSTALLATIONS IN U.S.
67FLOOD CONTROL AMERICAINVISIBLE FLOOD CONTROL
WALLTMwww.floodcontrolam.com