1
Product Costing and Cost Management
  • Mfg/Pro Midwest User Group
  • March 20, 2001
  • Maria Balluch

2
Costing Methods
  • Standard Cost
  • Track what an item should cost
  • Variances are generated
  • Average Cost
  • Updated using weighted-average formula
  • Each receipt process recalculates cost
  • No variance reporting

3
Available Cost Methods
  • GL Costing
  • Standard
  • Average (requires the Cost Management Module)
  • Current Costing
  • Average
  • Last
  • None

4
MFG/PRO Basic Costing
  • GL Standard Costing
  • Current Costing
  • Average
  • Last
  • None
  • 3.24 Inventory Control File
  • Cost Management Module allows more choices

5
Cost Management Extra Features
  • Average GL Costing
  • Simulated Costing
  • What-If Scenarios
  • Historical Costing
  • As-Of Date Cost for comparison reports

6
Cost Elements
  • Material
  • Labor
  • Burden
  • Overhead
  • Subcontract

7
Additional Elements
  • Available with the Cost Management Module
  • Added elements will sum into total cost

8
Material Costs
  • This-Level for Purchased Items
  • Become Lower-Level for Manufactured Items
  • Entered directly for each item
  • Defaults as Purchase Order Cost in PO Maintenance

9
Labor Costs
  • Calculated from Routing Set-up/Run Times and Work
    Center Rates
  • This-Level for Manufactured Items
  • Become Lower-Level when item contains
    Sub-assemblies

10
Burden Costs
  • Represents the Variable Overhead
  • Calculated from Routing Set-up/Run Times and Work
    Center Burden Rates
  • This-Level for Manufactured Items
  • Become Lower-Level when item contains
    Sub-assemblies

11
Overhead Costs
  • Represents the Fixed Overhead
  • Applied to This-Level for Purchased or
    Manufactured Items
  • This cost is applied to the Overhead Account at
    the time of PO Receipt or Work Order Receipt

12
Subcontract Costs
  • Cost associated with outsourced operation
  • Calculated from the Subcontract Cost applied to
    Routing operation

13
Cost Roll-Ups
  • Routing Cost Roll-Up (14.13.13)
  • Totals the labor/machine hours and cost,
    subcontract cost and burden cost
  • Computes the cumulative operation yield based on
    the routing
  • Posts the cost data to This-Level labor, burden
    and subcontract fields for the cost set specified

14
(No Transcript)
15
Cost Roll-Ups
  • Product Structure Cost Roll-Up (13.12.13)
  • Obtains This-Level Costs from the Item Master
  • Performs a Level-by-Level computation of costs
    for the five cost categories
  • Uses the Product Structure

16
(No Transcript)
17
(No Transcript)
18
(No Transcript)
19
(No Transcript)
20
Item-Site Costing
  • Costs are SITE SPECIFIC by item
  • Costs entered at one site need to be copied or
    entered at other sites
  • Cost Management Cost Set to Cost Set Copy
    (30.3)
  • Linked-Site Costing (EB02 Release)
  • Default Costing Site

21
(No Transcript)
22
Item Costing Considerations
  • Costs are calculated/input for the level at which
    they are incurred
  • Purchased Items do not incur low-level costs
  • Work Center Rates are considered Labor and Burden
    standard rates
  • Overhead is applied at This-Level when incurred
  • The TOTAL cost of the item is considered its
    standard cost
  • Sub-Modules will use each element of the total

23
Variance Calculations
  • Variance any cost difference between what is
    actually generated and what is expected
    (standard)
  • Only result when using GL Standard Costing
  • Purchase Orders, Work Orders (discrete or
    repetitive) and Accounts Payable Vouchers
    generate variance transactions

24
Purchase Orders
  • PO Cost defaults to This-Level Material for the
    item entered on the PO
  • Any difference between this cost and what the PO
    Cost is changed to results in a Variance
    (Purchase Price Variance PPV)
  • Variance is generated at PO Receipt
  • Overhead is applied at PO Receipt

25
Work Orders
  • Components are costed at their Standard Cost
  • Labor is costed at the Run-Time times the Labor
    Rate
  • Burden is costed at the Run-Time times the Burden
    Rate
  • Variances are calculated during Shop Floor
    reporting or at Accounting Close

26
Work Order Variances
  • Material Usage Variance
  • If a quantity issued is different than expected
  • Material Rate Variance
  • If the cost is different at issue than at release
  • Labor/Burden Usage Variance
  • If more or less time is reported than expected
  • Labor/Burden Rate Variance
  • If Employee Rate is different than WC Rate or if
    WC Rates change between reporting and release

27
Work Order Variances, Cont.
  • Subcontract Usage Variance
  • If more/less received on PO than expected
  • Subcontract Rate Variance
  • If PO Cost for Subcontract PO differs from
    expected cost on routing
  • Method Variance
  • Anything left over in WIP when the WO is
    Accounting Closed and all other variances are
    posted

28
Work Order Cost Report
  • Work Order Cost Report (16.3.4) is best tool for
    determining Work Order Costs and Work Order
    Variances
  • Defines products at each level (Material, Labor,
    Burden and Subcontract)
  • Explains where/why variance was generated

29
(No Transcript)
30
Work Order Cost Report
  • Insert Here

31
Accounts Payable Variance
  • AP Rate Variance
  • Difference between PO Receipt Cost and Invoice
    Cost at Voucher Maintenance
  • AP Usage Variance
  • Difference between PO Receipt Quantity and
    Invoice Quantity at Voucher Maintenance

32
Cost Simulation Benefits
  • Requires the Cost Management Module
  • Can create What-If scenarios
  • Can change material costs, labor and burden costs
    and subcontract costs to perform cost analysis
  • See ahead what cost impact a change in
    process/supplier would mean

33
Historical Cost Sets
  • Requires the Cost Management Module
  • Can save costs at various points in time for
    comparison to todays cost

34
General Comments
  • Costing touches every module of MFG/PRO
  • All Inventory is transacted at GL Cost
  • Variances are generated real-time
  • Any change to GL Cost will revalue the current
    Inventory on Hand

35
General Comments, cont.
  • Inventory Analysis uses cost (ABC Report,
    Inventory Valuation Report)
  • Inventory Control uses cost
  • Physical Inventory uses cost
  • Purchase Orders, Sales Orders, Sales Analysis,
    SSM use cost
  • DRP, Product Structure Costing, Routing Costing,
    Work Orders, Repetitive, Shop Floor Control use
    cost

36
Continued.
  • MRP Production Cost Plans use cost
  • General Ledger balances are updated with cost
    transactions
  • Accounts Payable uses cost
  • EDI Transmission uses cost

37
Continued...
  • Costs are expressed in terms of Base Currency
  • Central Order Processing environments will
    transact using Base Currency Costs, even with
    different base currencies
  • Configured/Made-to-Order products are costed
    appropriately depending on Option setup and
    Manufacturing process