Software Configuration Management and Integration Alberto Di Meglio EGEE Integration Manager EGEE is proposed as a project funded by the European Union under contract ... – PowerPoint PPT presentation

Number of Views:196
Avg rating:3.0/5.0
Slides: 14
Provided by: alber141
Category:

less

Transcript and Presenter's Notes

Title: Software Configuration Management and Integration


1
Software Configuration Managementand Integration
  • Alberto Di Meglio
  • EGEE Integration Manager

EGEE is proposed as a project funded by
the European Union under contract IST-2003-508833
2
Summary
  • SCM and Integration Activities
  • First step Developing the Master Plan
  • Second step Implementing the Plan
  • Third step Running the Backstage
  • SCM Discussion Topics

3
SCM and Integration Activities
  • EGEE has a dedicated team for SCM and Integration
    activities
  • The vision of the team is that integration must
    start even before a single line of code is
    written and must provide an integrated
    development and collaboration environment
  • The mission is to is to provide a solid, reliable
    infrastructure to manage changes and release
    quality software based on standard SCM procedures
    and tools
  • Preparation activities are starting now and we
    want all parties to be involved in the process of
    defining the infrastructure and learn from past
    experiences
  • SCM is not about setting rules, its about
    collaboration

4
First step Developing the Master Plan
  • A master SCM Plan is being formalized now
  • It contains basic principles and rules about the
    various areas of SCM and Integration (version
    control, release management, build systems, bug
    tracking, etc)
  • We want to involve all the parties in the process
    from developers to end users to make sure
    everybody buys in
  • When input is collected and plan is formalized it
    will be circulated to get the final agreement

5
Second step Implementing the Plan
  • After the SCM Plan is formalized and published
    (at least an initial agreed version), we will
    start the implementation phase
  • All tools, machines and communication channels
    will be put in place
  • Developers and Users Guides will be produced
    with clear instructions about how to use and
    interact with the project and manage changes in
    the correct way

6
Third step Running the Backstage
  • For the duration of the project, the integration
    team will
  • Enforce and support all procedures by means of
    automation tools
  • Run the automated and manual operations of the
    build and release management processes
  • Deliver integrated installation packages for all
    supported platforms for further testing and
    deployment
  • Collect further input from all parties and
    introduce changes in the procedures and tools as
    necessary

7
Version and Configuration Control
  • Based on CVS (using central IT CVS service?)
  • Fixed directory structure for each module
  • Rules for tagging and branching (e.g. bug fix
    branches)
  • Common naming conventions for baseline and
    release tags
  • Configuration files to automate creation of
    workspaces
  • Used to enforce build reproducibility
  • Used to create reference private workspaces for
    developers to develop against
  • Authorization based on commitavail and tagavail
    according to SCM roles (developers, release
    managers, integrators, etc.)
  • Supported protocols K4, SSH (pserver only for
    anonymous read-only)

8
Automated Build System
  • Several tools under evaluation
  • Most interesting combination so far
  • CruiseControl Maven
  • CruiseControl runs centrally on standard Ant
    files, developers do not need to add/maintain
    other special files, works for Java, C/C,
    Python, etc (using built-in or custom tasks)
  • Ant file structure should be discussed to have a
    set of common items (style checks, coverage
    tests, unit tests, etc)
  • Build artefacts from each module should be copied
    to a common local repository for resolving
    dependencies
  • Maven implemented centrally to produce all
    project documentation and enforce additional
    checks and collect project metrics (need
    collaboration from developers to produce the
    Maven project files)
  • Builds are run centrally every night (HEAD),
    every week (project specs) and when needed
    (staging build server)
  • Developers can run private builds by using the
    integration Ant scripts

9
Defect Tracking System
  • Bugzilla-like tool provided as part of the
    Savannah project portal
  • Provided and supported by SPI team at CERN
  • Need to add tools for collecting QA metrics
    (current reporting in Savannah/Bugzilla is not
    sufficient)

10
Quality Assurance
  • Software Metrics are collected as part of the
    build process
  • Software Defect and QA Metrics are collected from
    the defect tracking system (manually? Can SPI
    provide additional tools?)
  • Project Metrics? Should we provide them in
    Integration? (project completion rate, labour
    rate, etc). It can be done, but needs input from
    Project Management

11
Change Control Board
  • Changes must go through a formal approval process
  • The CCB is tasked to collect and examine the
    change requests
  • Changes must be tracked (in Bugzilla?) and
    communicated as efficiently as possible
  • The role of the CCB (and SCM in general) is not
    to prevent change, but to organize it so it has
    only positive impacts on the project
  • Should meet periodically
  • Need to define composition of the board

12
Collaboration Tools
  • Project Portal Savannah from CERN SPI
  • Single entry point for the project, news, tools,
    documentation
  • Links to other relevant sites (CVS web browsing,
    builds status, package repository, project
    metrics and other artefacts)
  • Mailing lists?
  • News, RSS feeds, etc.?

13
Additional Topics to be discussed
  • Supported platforms
  • Supported compilers, libraries, etc
  • Package, deployment and installation requirements
    for integration
  • Roles and responsibilities