Consert W.Kofman, A. Herique, JP. Goutail, A. Roux - PowerPoint PPT Presentation

1 / 16
About This Presentation
Title:

Consert W.Kofman, A. Herique, JP. Goutail, A. Roux

Description:

Consert W.Kofman, A. Herique, JP. Goutail, A. Roux PC8 activities A large set of CONSERT test were performed during PC8 Theses operations are essential for CONSERT ... – PowerPoint PPT presentation

Number of Views:55
Avg rating:3.0/5.0
Slides: 17
Provided by: JeanPi76
Category:

less

Transcript and Presenter's Notes

Title: Consert W.Kofman, A. Herique, JP. Goutail, A. Roux


1
Consert W.Kofman, A. Herique, JP. Goutail, A.
Roux
2
PC8 activities
  • A large set of CONSERT test were performed during
    PC8
  • Theses operations are essential for CONSERT comet
    operation preparation.
  • RF link, Absolute Time Tag commands, OCN
    Interferences test and Long Ping Pong.
  • The FOP has been totally rewritten during PC8
    preparation and the validation of the new FOP
    (comet-ready) has been done during PC8.
  • The CSA (CONSERT Synchronization Accuracy) has
    been implemented and was validated during PC8

3
(No Transcript)
4
PC8 results
Figure 1 Consert power versus S/P position from
-50/50 to 70/70 by 5 steps and power measured
during the different PC tests.
5
PC8 results
  • CONSERT performances are nominal for OCN and
    LCN the instrument works well.
  • There is no unexpected TM-losses on the orbiter
    side some minor modifications in the Fop have
    been done in order to avoid some ACK losses
    before time update.
  • On the Lander, there are a few losses during long
    ping-pong test using mass memory.
  • These limited losses are acceptable and Consert
    can be operated without inconveniences.
  • Nevertheless, it is important for us to
    understand and to secure this problem. (CDMS ?)

6
PC8 results
  • Absolute Time Tag commands (necessary for CONSERT
    cometary operations)
  • and RF link tests.
  • The Lander synchronization was fine during all
    the operation including Time Tagged commands and
    RF link.
  • The Orbiter operation shows a delay of 23
    seconds. This delay seems stable and may be
    attributed to the OBCP management. Further
    investigations or tests have to secure this
    point.

7
PC8 results FOP tests
  • All the tested sequences are fine. Minor
    modifications have to be done in order to take
    into account the timing of nested sequences.
  • Some TC's have to be delayed (minimum 1 minute
    after OCN on) in order to avoid ACK without
    unvalid time stamp.
  • User Manuel has to be updated in order to include
    a description of the typical data set for the new
    FOP.

8
PC8 results 10h duration ping-pong
  • There is no drift observed between the Rosetta
    USO and OCN USO with an accuracy of 10 ms over 10
    hours. Considering the Rosetta USO as a perfect
    reference at this scale, the OCN USO is 10 MHz
    with an accuracy of 3 10-7.
  • There is no aging detected on the OCN USO. This
    is significantly better than the aging expected
    from the manufacturer specifications.
  • There is no aging on the LCN USO. The LCN USO can
    be used as a 10 MHz reference with accuracy
    better than 10-6.

9
PC8 conclusions
  • PC8 is successful for Consert
  • - Our instrument is operational and the
    performances are nominal.
  • - There are limited TM losses between LCN and
    CDMS.
  • - The new FOP is operational, some minor
    correction are required in the timing.
  • - CSA is an operational parameter of the greatest
    interest in order to secure / validate Consert
    operations.
  • - Interference test has provided data of interest
    closing some doors and opening a lot of other
    doors
  • - The estimation of the OCXO aging is good

10
PC9 results
  • PC9 execution start of February 09
  • OK
  • Consert works well
  • no problem detected during this test
  • signal shape, noise level coherent

11
Interference testsGeneral. Several instruments
12
Interferences Miro
  • Inconclusive. In fact on average the perturbation
    is negligible however there are sometimes short
    burst of perturbations (lines) increasing the
    noise level of 2-4 dBs. It is necessary to
    understand the reason of these bursts generated
    by MR.

13
Interferences VIRTIS and ?
  • SCI data altered, noise level higher of about
    5dB during the whole test.
  • Line at 88.1 Mhz.

14
Interferences (Group 1 in Susceptible Mode)
  • Data altered by a high noise level of about 4 dB
  • Strong line at 92.12 MHz disappearing for 4
    minutes starting at 13h49 accounting for 2 dB.
  • Which instrument generates this line?

15
PC10
  • Basic tests (performed during each passive and
    active PC)
  • Unit functional test O and L
  • ping pong test with umbilical and orbiter
    schedulling
  • Classical tests (each active PC)
  • Orbider schedulling with RF link
  • Abslute time tagged command (Lander schedulling)
  • Long ping pong test in  comet conditions  (30 h
    2h) , need to check data storage capacity,
    different sampling, etc
  • test specific for PC10
  • Interference test lander
  • Inerference testorbiter (delta PC8)
  • Delta fop commissionning
  • Test of the turn on synchroization accuracy
    requierement
  • Unexpeced 2s propagation delay on OBCP (TB
    nvestigated)

16
ATTC Description
  • ATTC Absolute Time-Tagged Command
  • OCN is scheduled by the Orbiter
  • LCN is Scheduled by the Lander
  • No other synchronization than absolute time of
    operation.
  • Objective
  • To test the operational links necessary to modify
    absolute timing of both spacecrafts in real time.
  • During PC10
  • Modification issued by CN Team short (?) time
    before execution.
  • Test of the RMOC LCC SONC part
  • During Lutetia Flyby
  • Modification issued by real time orbital update.
  • Test including the FDy part.
Write a Comment
User Comments (0)
About PowerShow.com