Project%20Status%20Electronic%20Systems%20Engineering - PowerPoint PPT Presentation

About This Presentation
Title:

Project%20Status%20Electronic%20Systems%20Engineering

Description:

cd-docdb.fnal.gov – PowerPoint PPT presentation

Number of Views:94
Avg rating:3.0/5.0
Slides: 26
Provided by: Guilh9
Category:

less

Transcript and Presenter's Notes

Title: Project%20Status%20Electronic%20Systems%20Engineering


1
Project Status Electronic Systems Engineering
  • Guilherme Cardoso, Section Leader
  • September 12, 2006

2
Outline
  • Meet the new ESE section
  • 3 groups DAQ, Control and Timing, Detector
    Instrumentation, Engineering Support
  • Effort allocation for August and metrics
  • Current project status
  • SNAP
  • Phenix
  • NOvA
  • ILC LLRF
  • ILC detector RD
  • CMS
  • CDF and D0 Run 2
  • Accelerator IPM, MI BPM, TeV BPM
  • Future projects
  • CMS RD for SLHC
  • ILC test beam at MTest
  • MIPP, CDF, INFN-Pisa, INFN-Lecce and others

3
DAQ, Control and Timing Group
Bill Haynes, GL Tom Boes Gustavo Cancelo Greg
Deuerling Rick Kwarciany Stefano Rapisarda Neal
Wilcer
  • Core competencies
  • Control systems
  • Firmware
  • DAQ systems
  • VME PCI
  • CDF D0
  • Timing algorithms
  • Project portfolio
  • ILC LLRF
  • PTA
  • NOvA


4
Detector Instrumentation Group
  • Core competencies
  • Multichip modules
  • Test stands
  • Front end design
  • ASIC specs
  • Wire bonding
  • Thick and thin film
  • Firmware
  • Project portfolio
  • Phenix
  • CMS
  • SNAP
  • ILC detector RD

Guilherme Cardoso, SLGL Alan Prosser, AL Jeff
Andresen Stew Bledsoe John Chramowicz Hank
Connor Ryan Rivera Marcos Turqueti
5
Engineering Support Group
Vince Pavlicek, GL Bill Barker Jim Franzen Rick
Mahlum Thinh Pham Ken Treptow Ted Zmuda
  • Core competencies
  • CDF D0
  • Project management
  • PCB layout
  • PREP customer support
  • Equipment repair
  • Project portfolio
  • ILC costing
  • Run 2
  • ILC LLRF
  • Interface to PREP logistics
  • PREP equipment repair
  • NOvA

6
Effort Report for August 06
7
Source of Funds
8
New Roles for PREP Support Staff at ESE
  • Vince and Rick are ESEs interface with PREP
  • ESE and CS are working together to continue
    providing PREPs customers with excellent
    services
  • PREPs diminishing scope creates great
    opportunity for staff to work in ESEs projects
  • PCB layout
  • Wire bonding
  • Firmware design
  • Software design
  • Training
  • The trend is to spend less time with PREP repair
  • Spikes are expected.
  • Steady state level determined by size of PREP

Vince Pavlicek Bill Barker Stew Bledsoe Tom
Boes Hank Connor Rick Mahlum
9
Their Current Effort Allocation Already Reflects
this Trend
10
ESE Metrics
  • Equipment repair
  • Equipment repaired per month
  • Labor employed in PREP repair
  • Effort allocation
  • Labor utilization per project
  • Labor utilization per funding source
  • Ill check monthly our compliance with CDs
    strategic goals and budget

11
Project Status - SNAP
  • Description
  • More details on the next Astrophysics
    presentation (Oct. 24)
  • Scope
  • Slice hardware and firmware, DAQ system
    engineering, memory testing hardware and
    firmware, ASIC test engineering
  • Schedule
  • Ongoing RD project, system definition expected
    for FY08
  • ESE Effort
  • 2.5 FTE with growth opportunities
  • Stakeholders
  • Alan Prosser, John Chramowicz
  • Slice Card
  • Flash Memory Testing
  • ASIC Test

12
Project Status - Phenix
  • Scope
  • Test stand, pixel module HDI, and pixel plane for
    the pixel detector for the Phenix upgrade in
    2008.
  • Schedule
  • MOU with LANL ends in November 30. We are on
    schedule. Continuing work beyond MOU within ILC
    detector RD scope.
  • ESE Effort
  • 1-2 FTE
  • Stakeholders
  • Marcos Turqueti, Ryan Rivera, Jeff Andresen, John
    Chramowicz

Test stand Pixel Module
Pixel Plane
13
Project Status - NOvA
  • Scope Schedule
  • Data Combiner Module Prototype Schematic done,
    layout underway, firmware started, software soon.
    This design contains more than the required
    functionality and could be used for the Near
    Detector test Dec 2007.
  • Timing system Evaluation GPS receiver purchased
    as the timing reference and will be evaluated
    this fall with the prototype DCM. System
    architecture has been proposed, accepted and
    being integrated with the far detector cooling
    and power distribution design going on now.
  • ESE Effort
  • 1 FTE
  • Stakeholders
  • Bill Haynes, Rick Kwarciany, and Jim Franzen
  • Data Combiner Module

14
Project Status - Accelerator
  • Quick update to projects from another report
  • MI BPM Long list of people
  • One task remaining read-back of front-end
    settings. Requires changes to the Transition
    controller (Rapisarda) and the Timing card
    (Haynes). Designs are done, testing shows only
    one bug, correction is stopped by vacation.
  • Cleaning up spare parts, documentation and loose
    ends.
  • TeV BPM Bill Barker
  • Approximately 4 days supporting repairs and
    updates with AD personnel.
  • IPM Rick Kwarciany
  • Operating at some level. Commissioned Oct 2005.
    In FY06 Rick has spent 6 weeks consulting on
    debugging and changing firmware in support of the
    operation.

15
Project Status - ILCTA Engineering Support
  • Scope Schedule
  • Simcon Low Level RF Controller The 30 page
    schematic is done and the review scheduled for
    today. The layout is starting. The firmware
    are changes well underway.
  • Stakeholders
  • Gustavo Cancelo, Ted Zmuda, Rick Kwarciany, Ken
    Treptow, and Neal Wilcer
  • DESYs SIMCON

16
Project Status - CDF Run2 Engineering Support
  • FY06 Effort Projection was 1.3 FTE
  • 10 month total is 5.54 FTE-months or .55
    FTE-months
  • CDF Projects Haynes, Bledsoe, Treptow, Pavlicek
  • CDF Clock Clone Card Complete/commissioned
  • 15 additional High Voltage Crowbars done this
    month
  • DOIM Receiver Investigation
  • CAEN Power Supply Radiation Tolerance
    Investigation
  • CDF ongoing Support - Haynes, Chramowicz, Pham,
    Treptow, Pavlicek, Rapisarda, Zmuda, Bowden
  • Clock Clone Card, Crowbar Module repair, SVX
    modules (6) consulting in support of ESG.

17
Project Status D0 Run2 Engineering Support
  • FY06 Effort Projection was 1.3 FTE
  • 10 month Total is 8.25 FTE Months or 0.83
    FTE/month
  • D0 Projects Zmuda, Rapisarda, Wilcer, Kwarciany
  • D0 L1 Cal trigger upgrade - Complete but under
    diagnosis.
  • VLSB module production and testing Complete
  • Vertex Trigger Luminosity Monitor Firmware -
    Commissioned
  • D0 Support - Zmuda, Pham, Rapisarda, Wilcer,
    Kwarciany, Bowden
  • VRB Controller (VRBC), Vertex Trigger Board
    Luminosity Monitor Firmware, Trigger Distribution
    System, Fiber Tracker Mixer System, VRB module
    consulting in support of ESG.

18
Future Projects CMS Upgrade
  • Interesting opportunity to participate early in
    the development of the project
  • Good chance that Fermilab will be a major
    stakeholder
  • Given BTeV and CMS forward pixels experience
  • Our group is well positioned to worn on the
    design of
  • DAQ
  • Pixel detector
  • Trigger

19
Future Projects ILC Detector RD
  • Test beam facility at M-Test
  • ESE as one stop shop
  • Create group within ESE to support new customers
    to the test beam
  • Provide sw, hw, and fw solutions to the test beam
    community
  • Goal design new DAQ with new telescope
  • Need sw help from Gerry ideally 1 FTE for FY07
  • Supported by ILC and PPD
  • Pixilated detector RD
  • Wafer probing
  • ASIC specifications and testing
  • System analysis
  • Research of 3D packaging

20
Test beam setup
Y
X
?
?
?
?
?
?
?
O
Z
Y(3)
Y(11)
X(4)
X(5)
X(9)
X(10)
CMS
  • Telescope of 6 BTeV pixel detectors (50 ?m ? 400
    ?m)
  • 2 Y-measurement planes
  • 4 X-measurement planes
  • CMS pixel detector in the center
  • Track projection error
  • about 3 ?m on X-direction about 8 ?m on
    Y-direction.
  • PROBLEM small tracking volume

21
ESE has a long history at MTest
22
New Telescope
Y
X
?
?
?
?
?
?
?
O
Z
Y(3)
Y(11)
X(4)
X(5)
X(9)
X(10)
CMS
  • Current pixel telescope single chips
  • Replace with planes of 8-chip modules

23
MIPP, INFN-Pisa, INFN-Lecce and others
  • I get about 1 call per week from people all over
    the world asking for pixel detectors
  • They are all trying to build a pixilated tracker
    for some time of test beam application
  • Once hearing the complexity of the device, most
    never call again
  • Some call back sporadically
  • Few keep calling all the time
  • It would be great to have a group dedicated to
    the support of serious requests
  • MIPP trigger upgrade will try to leverage
    Phenix/ILC work (economies of scale?)
  • INFN-Pisa wants to use SVX4 hybrids from CDF
    Runiib
  • INFN-Lecce wants to use FSSR hybrids from BTeV

24
CDF CEAN Power Supply Radiation Tolerance
  • Description
  • CAEN High Voltage power supplies are in the
    collision hall and demonstrate problems
    indicative of single event upset (SET).
  • Scope
  • Investigate specifics of problems and possible
    mitigations including shielding, orientation and
    hardware or software changes.
  • Schedule
  • Low priority intermittent.
  • ESE Effort
  • About 1 day per month. Will become more
    important as the luminosity grows.
  • Stakeholders
  • Vince Pavlicek, Rick Tesarek (CDF), Silicon SPL.

25
CDF DOIM Receiver (Bit Booster)
  • Description
  • Radiation damage is reducing the light output of
    the fiber optic link transmitters. They can be
    turned up but that happens in groups of 95 and
    in 4 or 5 groups the brightest bit is too bright
    for the receiver. We are investigating making a
    new wide range receiver.
  • Scope
  • Small prototype built with support from CDF. Need
    design resources.
  • Schedule
  • Resource driven. Current prototype works. Need
    production layout.
  • ESE Effort
  • 15 FTE/mo for 10 months.
  • Stakeholders
  • Ken Treptow, Silicon SPL
Write a Comment
User Comments (0)
About PowerShow.com