Title: Bridge%20Project%20Presentation


1
Bridge Project Presentation
  • Group 2
  • Alex OdleMatt SimonSalim HamedMicael Thiodet

2
Outline of Presentation
  • Introduction
  • Group Members
  • Goals and Constrictions
  • Group Goal
  • Prototype Testing
  • Design Process
  • Final Design
  • Changes Made To Final Project
  • Conclusion
  • Final Thoughts and Suggestions

3
Introduction
  • Group Members
  • Salim Hamed
  • Alex Odle
  • Matt Simon
  • Micael Thiodet

4
Goals and Constrictions
  • Goal
  • Build an efficient bridge
  • Constrictions
  • Limited Materials
  • Limited dimensions
  • Limited Time

5
Group Goal
  • Our group initially decided that we were going to
    focus on efficiency rather than overall weight
    the bridge can support. For these reasons both
    the prototype bridge and the final bridge was
    created using fishing line as substantial
    material.

6
Prototype Testing
  • Types of Considered Bridges
  • Cable Stay Bridge
  • Suspension Bridge

7
Our Choice Cable-Stay Bridge
  • Reasons why we picked a cable-stay
  • The supported weight will be forced down to the
    sides of the jig
  • Less materials because we will utilize the
    fishing line
  • Aesthetically pleasing a.k.a. sexy

8
The Completed Prototype
After the Test
Before the Test
FAILURE POINT
9
Results of the Prototype Test
  • Weight 0.685 lbs
  • Max. Load 70 lbs
  • Efficiency 102
  • The prototype bridge failed because the fishing
    line was not under tension. Therefore all the
    weight was being supported by the deck, which was
    not designed to support all the weight on its own.

10
Final Design
  • Changes made to the final design
  • Complete redesign of the bridge
  • Final bridge will have a string based structure
  • Reasons for the changes
  • More efficient than prototype
  • Less complicated than prototype
  • And still sexy

11
The Final Bridge
Carlos Santana (named for obvious reasons)
12
Results of the Final Test
  • Weight 0.04 lbs
  • Max. Load 75 lbs
  • Efficiency 1875
  • The results of the final test were very pleasing.
    The bridge didnt actually fail, instead as the
    string flexed the metal plate that was resting on
    the string interfered with the jig. As a result
    we had to stop the test. Our improvement worked
    just as we had planned. The bridge was very
    efficient as seen by the efficiency rating.

13
Irony?... I think not
14
In Conclusion
Carlos Santana
15
Final Thoughts and Suggestions
  • Final Thoughts
  • We would have used a different size metal
    platform so Carlos Santana could have tested
    until failure
  • Suggestions
  • Have good group communication
  • Budget materials wisely
  • Spend plenty of time at the drawing board
    designing the bridge
  • When gluing, dont use too much glue and clamp
    the wood while it is drying

16
Good! Because I want to go check and see if my
hair still looks as good as it does in this
picture
THANK YOU Very Much Are there any questions?
Write a Comment
User Comments (0)
About PowerShow.com