Title: RHIC%20APEX%20
1RHIC APEX LARP
- Vladimir Shiltsev
- FNAL/APD
2RHIC high L(polarized) hadron collider
Operated modes (beam energies) AuAu 10, 28,
31, 65, 100 GeV/n dAu 100 GeV/n
CuCu 11, 31, 100 GeV/n p?p? 11, 31, 100, 205,
250 GeV Possible future modes Au Au 2.5 GeV/n
(AGS, SPS c.m. energy) p? Au 100 GeV/n
(asymmetric rigidity)
Achieved peak luminosities (100 GeV,
nucl.-nucl.) AuAu 58?1030 cm-2 s
-1 p?p? 35?1030 cm-2 s -1 Other large
hadron colliders (scaled to 100 GeV) Tevatron (p
pbar) 23?1030 cm-2 s -1 LHC (p p,
design) 140?1030 cm-2 s -1
3Performance limitations with partial to-do list
- Intra-beam scattering (heavy ions)
- Low dispersion lattice
- Stochastic (in progress) and electron cooling at
100 GeV/n - Dynamic pressure rise from electron clouds
- NEG coating of warm sections ?
- Pre-pumping of cold sections ?
- Instabilities (at transition)
- Adjust chromaticity ?(chromaticity jump?)
- Reduce electron clouds
- Fast transverse damper
- Beam-beam (light ions and protons)
- Eliminate 10 Hz orbit oscillation (in progress)
- Non-linear chromaticity correction (in progress)
- New working point ?
- Electron lens ??
- Polarization (protons)
- AGS strong partial snake ?
- AGS horizontal tune in spin tune gap (in
progress) - RHIC 100 GeV ?
4Run-7 (President Budget request) (Q3)
30 weeks of cryo operation
½ week warm-up
12 weeks of A-A physics
10 weeks p?-p? physics
3 week set-up/ramp-up A-A
3 weeks set-up/ramp-up p?-p?
1 ½ week cool down 80K to 4K
- Over last five years reduced cool-down/warm-up
from 5 weeks to 2 weeks and reduced
set-up/ramp-up from 2x5 weeks to 2x3 weeks ?
total reduction of operations overhead from 15
weeks to 8 weeks per year! - LN2 cooler, He refrigerator improvements
- Automation, beam-based feed-back
5Goals for RHIC Enhanced Design Performance
(2008) (Q4)
First 250 GeV p?-p? physics run currently
scheduled for 2009.
6LARP Accel Systems Progress 06
- Schottky being baked, will go into LHC tunnel
- TCFB success at SPS
- 4 long-term hardware commissioners _at_CERN
- SLAC joins commissioning forces
- LHC_at_FNAL to open in Nov07, new - LAFS
- RC work at full speed, a lot of changes, delay
- SPS beam studies BBQ PLL, Q head-tail, bent
crystal, etc - Wires built for RHIC tests
- of LARP presentations at Valencia workshop
7Accelerator Systems FY07 Priorities
- Lumi-Monitors build,install, start
commissioning, RHIC test - TuneCoupling FB deliver design, participate in
installation and commissioning - Schottky participate in installation and
commissioning - Hardware Commissioning execute current plan
SAFELY! - Beam Commissioning develop acceptable/detailed
execution plan for FY08 by mid-07 (more from
BNL!) Todd, Mei - Physics experiments RHIC (BBLR), Tevatron(PLL),
ecloud - Other tasks execute Task Sheets Plans
8RHIC BBLR wires assembly
9Planned test with RHIC BBLR wires (WF)
- Better signal from LR interaction(include
head-on BB as another nonlinearity, larger
chromaticity) - RHIC BBLR wire commissioning(may be partially
parasitic to operation, may improve collimation) - Use wires to simulate LHC-like conditions(wires
designed for LHC strength, beam lifetime better
than in SPS tests) - Test compensation of single LR interaction (in
presence of head-on collision, need protons) - Test pulsed power supply not in 2007(confirm
that beam lifetime is not negatively affected)
10Lumi-Mon Noise w. and w/o beam (Angelika D) 0.1mV
?100mV
no beam
beam, 1 rev.
11Noise Problem (w. beam)
5 MHz/div
20 db/div
9.5 MHz 19 MHz 28 MHz
46 MHz
12???
13Estimate of SyncRad Suppression effect (WF)
Energy loss from synchrotron radiation
Z2,makes heavy ions in RHIC particularly
interesting
H. Burkhardt, CERN
14AGS Cooling (Mike Bl)
- In the mid 90s Willem Van Asselt observed a
narrowing of the IPM profiles with gold beams
over the AGS injection porch. The time scale was
of order one second and the data were seen by
several people. - In 1995 K. Kilian published a paper suggesting
that collisional excitation of electronic states
could cool beams. - A very cursory AGS study in 2005 showed no
emittance reduction. - Theory has been pessimistic. C-A/AP/230
-
IPM neutralization?? IBS ??