NAESB Time and Inadvertent Management Business Practice Update (TIMBP) - PowerPoint PPT Presentation

About This Presentation
Title:

NAESB Time and Inadvertent Management Business Practice Update (TIMBP)

Description:

Intended to be a very targeted business practice to address multiple concerns in ... saying Time Error Corrections (TEC) and Inadvertent Payback are NAESB's purview ... – PowerPoint PPT presentation

Number of Views:51
Avg rating:3.0/5.0
Slides: 8
Provided by: nae5
Category:

less

Transcript and Presenter's Notes

Title: NAESB Time and Inadvertent Management Business Practice Update (TIMBP)


1
NAESB Time and Inadvertent Management Business
Practice Update(TIMBP)
  • August 20, 2009
  • Terry Bilke

2
Introduction
  • Intended to be a very targeted business practice
    to address multiple concerns in Order No. 693
  • Originally submitted to NERC, NERC Staff and
    Standards Committee rejected the SAR saying Time
    Error Corrections (TEC) and Inadvertent Payback
    are NAESBs purview
  • Relied on proven Time and Inadvertent management
    practices, comparable to the WECC automatic TEC
  • No ERCOT/WECC impact unless they so choose

3
FERCs Order No. 693 Concerns
  • Address number and efficiency of TECs
  • Concerned with frequency excursions (nearly half
    of reported frequency excursions occurred during
    TEC even though the East is in TEC 15 of the
    time)
  • Wants NERC to reduce and penalize large
    Inadvertent balances
  • Asks NERC to investigate alternatives to present
    TEC practices

4
EI TEC Summary 2002 2009
Present Payback Method
Old Payback Method
5
Old Unilateral Payback was the Cornerstone
  • Unilateral Payback Option 2 gt
    Average Frequency closer to 60 Hz gt Less
    Inadvertent passing around gt
  • Smaller Inadvertent Balances
  • Average Frequency closer to 60 Hz gt
  • Fewer TECsgt
    Fewer Frequency Excursions
  • This Payback Option was rejected by the EC

6
Recent Items
  • NERC BAC Team met with the FERC
  • FERC Staff appears to be open to alternatives to
    the Order No. 693 concerns that led to the TIMBP
  • This may mitigate the need for the last draft TIM
    business practice
  • TIMTF created a tracking matrix that both teams
    update
  • TIMTF is participating in BAC Team calls
  • As the BAC Team proposes changes to BAL-002,
    BAL-004, BAL-005, BAL-006 table is updated
  • TIMTF evaluates whether a complementary business
    practice is needed

7
Potential Issue
  • NERC BAC may do field tests that interface with
    NAESB business practices
  • No NAESB process for field tests
  • Field test may cause a deviation of NAESB
    business practices (that are generally part of
    transmission providers tariffs)
  • There will likely be other similar situations in
    the future, looking for EC guidance