The usual reactive approach is to rehabilitate an entire line after significant ... This 'Vertical Team' helped to garner support from all levels within MSD and to ... – PowerPoint PPT presentation

Number of Views:83
Avg rating:5.0/5.0
Slides: 23
Provided by: edbra1
Category:

less

Transcript and Presenter's Notes

Title: MSD Pipe Rating Program AQUA SALUBRIS


1
MSD Pipe Rating ProgramAQUA SALUBRIS
2
Pipe Rating Program
  • What is it?
  • A new, proactive program used to define and
    develop rehabilitation projects.
  • The usual reactive approach is to rehabilitate
    an entire line after significant problems have
    occurred.

3
Pipe Rating Program
  • Purpose To get the Biggest (and Quickest) Bang
    for the Buck. This method should prove quicker
    and more efficient than our Basin Rehabilitation
    Projects.
  • Focuses Rehabilitation Dollars where they are
    most needed whether at a single point repair or
    a traditional DR project.

4
Pipe Rating Program
  • Brief History
  • Over the past 10 years MSD has had an aggressive
    rehabilitation program, having funded over 111
    million since FY93, primarily through traditional
    approaches.
  • Pipe Rating was developed as a progression of our
    Basin Rehabilitation and Preventative Maintenance
    Programs. To date MSD has completed the first
    London Road Pilot Basin project _at_ 23,000 LF
    and is 71 finished with our second basin
    project, Tomahawk Basin _at_ 49,000 LF. The total
    cost will be about 6.5 million.
  • Each of these basin-wide projects was divided
    into three phases for speed
  • 1) Lining on both private property and public
    R/W
  • 2) DR in public R/W and
  • 3) DR on private property

5
Pipe Rating Program
  • Brief History (Contd)
  • Basin-Wide Rehabilitation, though comprehensive,
    is both time-and-capital intensive, taking 3-5
    years to develop and complete a project. With
    sixty-nine sub-basins within the District, this
    approach is too slow.
  • Seeking higher levels of efficiency, MSD
    developed a program which targets hot-spots. This
    program also dovetails with our new State
    Collection System Permit (at the time only the
    fourth such permit in the State).
  • MSD is now required to rehabilitate at least
    50,000 LF per year. In prior years we have
    exceeded over 90,000 LF, though this is being
    ramped down over time.

6
Pipe Rating Program
  • How was it started?
  • A special group was formulated which was
    comprised of several levels of staff including
    GIS, System Services, engineering, and
    management.
  • This Vertical Team helped to garner support
    from all levels within MSD and to gather as
    diverse an input as possible.

7
Pipe Rating Program
  • Elements Used
  • 1) CCTV information
  • 2) Defect Scoring System
  • 3) GIS Database Software
  • 4) Sanitary Sewer Overflow (SSO) history
  • 5) Engineering analysis
  • These components are combined to generate
    specific projects for problem lines.

8
Pipe Rating Program
  • How Does the Process Work?
  • 1) A line segment is first cleaned and CCTVd, as
    a part of MSDs Preventative Maintenance Program.
    MSD is required to clean 10 of our system each
    year, in accordance with our new collection
    system permit.
  • MSD has CCTVd over 32 basins
    totaling
  • 2,073,030 LF ( 43 of our total
    system
  • _at_ 900 miles) as of June 2003.
  • 2) Each structural defect noted in the video
    inspection is given a
  • defect score, in accordance with MSDs
    standardized scoring
  • system. Defects are then embedded within the
    GIS database,
  • with appropriate scores attached.

9
  • HAND-OUT

10
  • MSD Structural Defect Scores
  • Code Description Score
  • CC Circumferential Crack 20
  • CL Longitudinal Crack 20
  • CM Multiple Cracks 30
  • COH Corrosion Heavy 50
  • COL Corrosion Light 20
  • COM Corrosion Medium 30
  • D Deformed Sewer 65
  • FC Circumferential Fracture 40
  • FL Longitudinal Fracture 40
  • FM Multiple Fractures 60
  • HL Hole Large 50
  • HP Hole Patched 5
  • HS Hole Small 25
  • JDL Joint Displaced Large 30

11
Pipe Rating Program
  • How Does the Process Work? (contd)
  • 3) Upon quantifying all structural defects within
    a pipe segment, three defect ratings are
    generated in our GIS
  • I) Peak Defect Rating
  • II) Mean Defect Rating
  • III) Mean Pipeline Rating
  • Also, a fourth component is added for prior
    overflow history
  • IV) SSO Rating

12
  • HAND-OUT

13
(No Transcript)
14
Pipe Rating Program
  • Then What?
  • This pipe rating is then used to flag the
    worst-of-the-worst pipes within a rated basin.
    As the rating is done via the GIS database, it
    occurs quickly.
  • Once flagged, an engineer will further review
    CCTV footage of the segment, then evaluate
    rehabilitation options for the highest (meaning
    worst) rated pipes, by reviewing videos of each
    flagged segment then determining the most
    economical rehabilitation methods.
  • All CCTV information is stored digitally and can
    be quickly retrieved for further analysis. An
    additional benefit of this format is that
    maintenance personnel can also quickly review
    CCTV information as needed.

15
  • HAND-OUT

16
Map Showing Peak Defect Rating
17
Map Showing Mean Defect Rating
18
Map Showing Mean Pipeline Rating
19
Projects for FY04
  • In the first year of this program, MSD has added
    five pipe-rated projects to the FY04 CIP
  • Four are Point Repair type projects, while one
    is a traditional DR due to the number of severe
    defects in several segments. Total estimated cost
    is 273,250.
  • This program is organic and will re-prioritize
    over time as new data is received and other pipes
    are rated. There has been a good correlation
    between pipes with high ratings and real-time
    maintenance problems.
  • To Date, over 737,536 LF of sewer has been rated
    by this program. Approx. 276,849 LF have been
    added to MSDs 10 year CIP.

20
(No Transcript)
21
In May of 2003, MSD received an AMSA National
Environmental Achievement Award for the Pipe
Rating Program. This program was developed solely
with MSD in-house staff and off-the-shelf
software. MSD and Los Angeles were the only two
utilities in the nation to receive this award.