Title: Jefferson Lab 12 GeV Upgrade Status of the CLAS12 Project
1Jefferson Lab 12 GeV Upgrade Status of the
CLAS12 Project
- Latifa Elouadrhiri
- Jefferson Lab
2Outline
- CLAS12 Project Description and Status
- Scope
- Science program Collaboration
- Cost
- Schedule
- Summary
3Jefferson Lab Today
Hall B
Hall A
Two high-resolution 4 GeV spectrometers
Large acceptance spectrometer electron/photon
beams
Hall C
7 GeV spectrometer, 1.8 GeV spectrometer, large
installation experiments
46 GeV CEBAF
12
11
Two 0.6 GV linacs
1.1
Enhanced capabilities in existing Halls
5Scope of the 12 GeV Upgrade
6New Capabilities in Halls A, B, C, and a New
Hall D
7Overview of Upgrade Technical Performance
Requirements
8CLAS12
CLAS12
Central Detector
Forward Detector
- Lum gt 1035cm-2s-1
- GPDs TMDs
- Nucleon Spin Structure
- N Form Factors
- Baryon Spectroscopy
- Hadron Formation
2m
9 Initial Science Program
CLAS12
Approved experiments correspond to about 5 years
of scheduled beam operation .
10CLAS12 Institutions
-
- Institution Focus Area
- Arizona State University (US) Beamline,
Tagging System - Argonne National Laboratory (US) Cerenkov
Counter - California State University (US) Cerenkov
Counters - Catholic University of America (US) Software
- College of William Mary (US) Calorimetry,
Magnet Mapping - Edinburgh University (UK) Software
- Fairfield University (US) Polarized Target
- Florida International University, Miami
(US) Beamline/Moller polarimeter - Glasgow University (UK) Central Detector,
DAQ, Forward Tagger, RICH - Grenoble University/IN2P3 (France) Central
Detector - Idaho State University (US) Drift chambers
- INFN University Bari (Italy) tbd,
interest in RICH - INFN University Catania (Italy) tbd
- INFN Frascati and Fermi Center
(Italy) Central Neutron Detector interest
show in RICH - INFN University Ferrara (Italy) (will join in
2010) tbd, interest in RICH - INFN University Genoa (Italy) Central
Neutron Detector interest in Forward Tagger - INFN ISS/Rome 1 (Italy) tbd, interest
in RICH
1112 GeV COST SUMMARY
1212 GeV Upgrade Funding Profile
13DOE Project Critical Decisions 12 GeV Schedule
- CD-0 Approve Mission Need (Mar 2004)
- CD-1 Approve Alternative Selection and Cost Range
(Feb 2006) - Permission to develop a Conceptual Design Report
- Defines a range of cost, scope, and schedule
options - CD-2 Approve Performance Baseline (Nov 2007)
- Fixes baseline for scope, cost, and schedule
- Now develop design to 100
- Begin monthly Earned Value progress reporting to
DOE - Permission for DOE-NP to request construction
funds - CD-3 Approve Start of Construction
- DOE Office of Science CD-3 Approval September
15, 2008 - CD-4 Approve Start of Operations or Project
Close-out
14DOE Generic Project Timeline
FEB 2006
NOV 2007
SEP 2008
MAR 2004
12 GeV Upgrade Approval dates
15DOE Critical Decision Schedule
CD-4 split in two to ease transition into
operations phase
(A) Actual Approval Date
1612 GeV Schedule
- May 11 - Oct 11 6-month down for initial
installations - Nov 11 - May 12 6-month run 6GeV
- Jun 12 - May 13 1-year down for major
installation - June 13 - Sep 13 Accelerator commissioning
1712 GeV Schedule
- Oct 13 Hall A commissioning start
- Apr 14 Hall D commissioning start
- Oct 14 Hall B C commissioning start
1812 GeV Upgrade Phases and Schedule
(based on funding guidance provided by DOE-NP in
June-2007)
- 2004-2005 Conceptual Design (CDR) - finished
- 2004-2008 Research and Development (RD)
finished (but 1 task) - 2006 Advanced Conceptual Design (ACD) -
finished - 2006-2009 Project Engineering Design (PED) -
ongoing - 2009-2014 Construction started !!
- Parasitic machine shutdown May 2011 through Oct.
2011 - Accelerator shutdown start mid-May 2012
- Accelerator commissioning start mid-May 2013
- 2013-2015 Pre-Ops (beam commissioning)
- Hall A commissioning start October 2013
- Hall D commissioning start April 2014
- Halls B and C commissioning start October 2014
1912 GeV Major Procurement Effort
Of the 29 Advanced Procurement Plans, 22 major
procurements are being actively worked (65M
Phased). A summary of their status is as
follows 3 Requests for information completed
3 Specifications completed 4 Open
Solicitations (including CLAS12 Solenoid)
8 Bids Received (including CLAS12 TORUS)
1 Vendor Selected (Hall D Civil Construction
Manager) 3 Awarded (Hall D B-Cal Fiber, CHL
Civil, Hall D Civil) 22 Active Major Procurements
20Future Upgrades to CLAS12 Base Equipment
- Micromegas (Saclay)
- Detailed simulation and track reconstruction
- Prototypes being tested, engineering design
underway - Review will take place in May 2009
- RICH Detector (INFN, Argonne, UK )
- Conceptual design with detailed simulations
- PAC 34 approved 3 major experiments requiring
RICH - Neutron detector (IN2P3/INFN)
- Detailed simulations, components being studied
- PAC 34 gave high rating to the science presented
in LOI - HD-ice Polarized target (JLab/INFN)
- Laboratory facility being designed
- Quasi real photon tagging facility (INFN, UK)
- Feasibility study
212007 NSAC Long Range Plan (4 recommendations)
Recommendation 1
- We recommend the completion of the 12 GeV Upgrade
at Jefferson Lab. - - It will enable three-dimensional imaging of
the nucleon, revealing hidden aspects of its
internal dynamics. - It will complete our understanding of the
transition between the hadronic and quark/gluon
descriptions of nuclei. - It will test definitively the existence of exotic
hadrons, long-predicted by QCD as arising from
quark confinement. - It will provide low-energy probes of physics
beyond the Standard Model complementing
anticipated measurements at the highest
accessible energy scales.
22Message from JLab Director to CLAS12 Workshop
- I had hoped to be with you for at least part of
the workshop unfortunately it became necessary
for me to attend a conflicting meeting in
Washington, DC, so although I believe my name
appears in the participant list, I can claim only
a virtual presence. - . you can be assured that we are working hard
to provide the resources both for the 12 GeV
Upgrade project and for the running of the 6 GeV
program. We were very pleased that recently we
received 19 proposals for experiments in the 12
GeV era including some which seek to extend the
scope of the currently planned equipment. - .. it is very important that we ensure the
resources to provide the base capabilities, but
it is also important to develop initiatives and
momentum which will ensure an expanding program
as we start to operate the machine in the new
era. -
- Please convey my best wishes to all, and,
especially to the collaboration, my hopes for a
successful workshop. - Hugh Montgomery
23Summary
- The 12 GeV Upgrade is the NSAC 1 Recommendation
- The 12 GeV Upgrade is the highest priority at
Jefferson Lab - The project is in construction phase
- CLAS12 construction started with the first major
procurements in progress the superconducting
magnets, the forward tracking detectors, and the
pre-shower calorimeter.
This is a very exciting time for hadronic
physics, and the perfect time for new
collaborators to make significant contributions
to the physics and equipment of CLAS12
2412 GeV Upgrade Summary
- RD is essentially complete
- PED (Engineering Design) finishes this year (18
remaining) - Construction has started !
- Significant progress
- Procurement planning and awards
- MOU development
- Installation planning
- Space planning
- Last 6 months very exciting!
- Next 6 months lots of hard work ahead
- Continued strong User participation is critical
to success
25CLAS12 Central Detector
- Charged particle tracking in 5T field
- ?T lt 60psec in CTOF for particle id
- Vertex reconstruction
- Moller shield
- Polarized target operation ?B/B lt 10-4
- in 3x5 cm cylinder around center
- Extension may include
- Central Tracking w/ Micromegas
- Neutron Detector
- Bonus detector
26Hall B Upgrade Schedule
27Hall B 12 GeV Upgrade Cost
DOE Conveened review of Cost and Schedule
External Independent Project Review September
2007
28Cost Profile
29Hall B 12 GeV Upgrade WBS Structure
1.4.2 Hall B
1.4.2.2 Detectors
1.4.2.1 SC Magnet
1.4.2.1.1 Torus
1.4.2.2.1 Tracking
1.4.2.2.2 Calorimeter
1.4.2.2.3 Time of Flight
1.4.2.2.4 Cherenkov
1.4.2.1.2 Solenoid
1.4.2.2.2.3 PCAL
1.4.2.2.1.1 SVT
1.4.2.2.3.1 CTOF
1.4.2.2.4.1 HTCC
1.4.2.2.4.2 LTCC
1.4.2.2.3.2 FTOF
1.4.2.2.1.3 DC
1.4.2.6 Infrastructure
1.4.2.5 Beamline
1.4.2.3 Computing
1.4.2.4 Electronics
1.4.2.5.1 Faraday Cup
1.4.2.3.2 DAQ
1.4.2.3.1 Trigger
1.4.2.4.2 TDC
1.4.2.4.1 ADC
1.4.2.5.2 Moller Polarimeter
1.4.2.6.1 Utilities
1.4.2.6.2 Frames
1.4.2.3.3 Online
1.4.2.4.3 Scalers
1.4.2.3.4 Offline
1.4.2.4.4 High Voltage
1.4.2.6.3 Assembly
1.4.2.6.4 Installation
1.4.2.5.4 Components
1.4.2.3.5 Slow Controls
1.4.2.4.7 Crates, Racks
30Hall B Upgrade Project Organization