Title: Instrument PreDevelopment


1
  • Instrument Pre-Development
  • Roland Meynart
  • Head of Instrument Pre-Development Office

2
Instrument pre-development
  • General Objectives
  • Risk reduction before committing to full
    development of instruments approved for flight or
    of specific strategic interest
  • How ?
  • Demonstration of instrument performances vs
    defined requirements
  • Design, manufacturing and tests of critical
    subsystems, possibly up to full or partial
    instrument model (PDM Pre-Development Model)
  • Space-representative build standards
  • Realisation of ground/airborne instruments, to
    measure science data in order to validate new
    mission concepts
  • Current pre-developments
  • ALADIN (ADM-Aeolus Core Explorer)
  • APEX (airborne hyperspectral imager)
  • L-band SAR (candidate Earth Watch)

3
ALADIN Instrument Pre-Development (1)
  • Incoherent Doppler Wind Lidar in monostatic
    configuration
  • Laser transmitter tripled-frequency NdYAG at
    355 nm, 150-mJ per pulse, operating in
    burst-mode laser 7s ON, 21 s OFF
  • Receivers
  • Fizeau or 2-wave interferometer for
    aerosol-scattered signal
  • dual-filter Fabry-Pérot etalon for
    molecular-scattered signal
  • Averaging on chip of returns from successive
    pulses using an accumulation CCD

4
ALADIN instrument pre-development (2)
  • Pre-Development Programme
  • Pre-Development Model (PDM) of Lidar Receiver
  • Three interferometers (2 Mie, 1 Rayleigh)
  • Detection chains (ACCD Electronics)
  • Routing Optics Diplexer breadboard
  • Structure
  • OGSE, EGSE
  • Full performance and environmental tests
  • Refurbishment as ground/airborne lidar in 2004
  • Two parallel contracts on laser transmitter
  • Deliverables laser test beds to validate FM
    design concepts and demonstrate performances.
  • Laser test bed to be integrated with PDM for
    end-to-end tests

5
ALADIN instrument pre-development (3)
Receiver (PDM)
Opto-mechanical model of Rayleigh spectrometer
6
ALADIN instrument pre-development (4)
Laser test-bed (seeder)
OGSE for PDM
7
ALADIN instrument pre-development (5)
  • Pump Diode Assessment programme
  • Support selection of pump diodes type and
    definition of qualification programme by early
    endurance testing under various nominal and
    stressed conditions
  • Choice of diode types
  • Pulsed High-Power (1 kW) diode bar stacks
  • CW laser diodes ( 1W)
  • Two European manufacturer per type
  • 4. Others
  • Feasibility study of phase-conjugate mirrors
  • High-efficiency non-linear conversion
  • Science studies to support definition of
    requirements

8
ALADIN and ADM-Aeolus planning
2000 2001 2002
2003 2004
Phase B
Phase C
Phase B/C/D/E
PDR
Selection laser supplier
ALADIN PDM
Design
Airborne inst
PDM manufacturing and test
CDR
Integration of one test bed in PDM
Lasers
Phase 1
Phase 2
Laser 1
PDM interface electonics
Phase 1
Phase 2
Laser 2
Diode assessment
9
L-band SAR Instrument Pre-development (1)
  • L-band SAR antenna is made of 10 columns of 2
    tiles (140 T/R modules), size 11 x 2.5 m2
  • Satellite configuration in two parts folded for
    launch (Snapdragon)
  • Stripmap
  • Quad-pol 40 km swath at 9 x 5 m resolution
  • Dual-pol 60 km swath at 9 x 5 m resolution
  • ScanSAR
  • 200 km at 30 x 30 m resolution

10
L-band SAR Instrument Pre-development (2)
  • Pre-Development Programme
  • Two-tile column
  • Full antenna column (2 tiles) with
    flight-representative units
  • structure,
  • RF and control electronics,
  • radiating panels, T/R modules
  • Demonstration of L-band tailored calibration
    scheme
  • Procurement of equipment in competition
  • Radiating panels funded by GSTP
  • T/R modules
  • Initial prototyping, including new MMICs, funded
    by TRP and GSTP
  • Production run in PDM contract

11
L-band SAR Instrument Pre-development (3)
  • 2-tile column
  • 14 TRM (40 W peak power)
  • Functions of central electronics by EGSE
  • No redundancy
  • Includes production run of T/R modules and
    design proving
  • Procurement status
  • Sub-system contractors selected by best
    practices

Flight design showing redundancy
12
L-band SAR Instrument Pre-development (4)
Radiating sub-arrays
13
L-band SAR pre-development planning
2002
2003
2004
PDM F 1
F 2
TRM MMICs (TRP)
TRM Prototypes (GSTP)
Radiating panels (GSTP)
Terrasar consolidation Phase
14
Airborne PRIM Experiment APEX (1)
  • Airborne Hyperspectral Imager in support of
    SPECTRA and other hyperspectral missions
  • PRODEX funding, managed by Earth Observation
    staff
  • Pushbroom imaging principle, 28 deg FOV, 1000
    pixels
  • Two spectrometers
  • VNIR 380-1050 mnm, 5-10 nm, CCD detector array
  • SWIR 1000-2500 nm, 10 nm resolution, hybrid
    HgCdTe detector array
  • SWIR detector array developed with requirements
    of SPECTRA mission (EOPP/EOEP funding)
  • Improvements to CCD also considered
  • Calibration Home Base for regular re-calibration
    during operations (EOEP funding)
  • Commissioning on Do-228 of DLR in 2004

15
Airborne PRIM Experiment APEX (2)
  • Development of SWIR detector array in common for
    APEX and SPECTRA
  • HgCdTe detector array hybridised on CMOS
    multiplexer
  • 1000 x 256 pixel, addressable read-out, fast
    operation
  • Cut-off 2.5 mm
  • Integrated detector-cryostat-cooler assembly for
    APEX

16
Lessons from 1st EOEP slice
  • IPD proved effective in risk reduction.
  • IPD on critical instruments enables phase B and
    following phases in good conditions
  • IPD stimulated European space lidar leadership
  • IPD started line of airborne instruments in
    support of EO campaigns.
  • Procurement based on competition, wherever
    practical
  • Large participation of SMEs and non-primes at
    early development stage
  • ALADIN
  • PDM SIRA, Patria, Rovsing, E2V, SESO, TPD-TNO,
    Sonaca
  • Laser transmitters Galileo Avionica, Thales
    Lasers, Quantel, CESI, Innolight, Tesat
  • Laser diodes Thales Diodes, DILAS, FBH,
    Innolight
  • Others MPB, U.Bern,
  • APEX HTS, OIP, Sofradir
  • L-band SAR to come

17
Future activities in 2nd EOEP slice
  • Continuation of programme with pre-development
    activities for
  • Candidate Core Explorers (EarthCare, SPECTRA,
    WALES) and Opportunity Explorers (ACE, EGPM)
  • Initially with selected sub-systems, later focus
    on missions approved for implementation
    (mid-2004)
  • Strengthening of lidar expertise with new
    developments for backscatter and dial lidars
    (H2O, CO2, O3,)
  • Strengthening line of activities on airborne
    instruments, in response to specific scientific
    needs
  • Support to new instrument initiatives, e.g.
    technology development and flights of opportunity
    (Incubatorconcept)