Project originated from traffic studies done by the Evansville ... Large culvert structure south of Keystone Hills Drive needs replaced. Project Development ... – PowerPoint PPT presentation

Number of Views:41
Avg rating:3.0/5.0
Slides: 25
Provided by: johns266
Category:

less

Transcript and Presenter's Notes

Title: Public Information Meeting


1
Public Information Meeting
  • St. George Road - Oak Hill Road
  • Intersection Reconstruction Project

2
Project History
  • Project originated from traffic studies done by
    the Evansville Urban Transportation Study (EUTS)
  • Traffic counts that were completed in 1999 and
    2002 showed that a traffic signal was justified
    at the intersection
  • Traffic increased by 9.7 on Oak Hill between
    1999 and 2002

3
Project Development
  • Left turn lane needed for northbound left turns
    from Oak Hill to St. George in addition to
    traffic signal

4
Project Development
  • Large culvert structure south of Keystone Hills
    Drive needs replaced

5
Project Development Culvert Replacement
6
Project Development Drainage Improvements
  • Storm water from 24 pipe from Ivy Meadow
    Subdivision drains to 15 and 18 pipes on Oak
    Hill Road

7
Project Limits
8
Project Development
  • Design contract signed with RQAW Corporation on
    Oct. 21, 2002
  • Survey work completed in Nov. 2002
  • Preliminary plans submitted to the county in May
    2003
  • Copies of plans sent to affected property owners
    in May 2003

9
Project Development
  • Right of way engineering and acquisition began in
    February 2004
  • Right of way acquisition completed in December
    2004
  • Final draft of plans submitted to county in March
    2005
  • Final plans submitted on April 25, 2005

10
Evaluation of Maintenance of Traffic Plan
  • Original plans showed two road closure periods on
    Oak Hill Road estimated project completion was
    October 2005 based on that plan

11
Evaluation of Maintenanceof Traffic Plan
  • Two options were evaluated to attempt to leave
    Oak Hill Road open during construction a
    temporary runaround and a temporary traffic signal

12
Temporary Runaround Design
  • INDOT design standards require 2 12 lanes with
    6 shoulders

13
Temporary Runaround Options
  • Construction of temporary runaround on west side
    of Oak Hill not possible due to proximity of
    houses to Oak Hill

14
Temporary Runaround Options
  • Temporary runaround would fit on the east side of
    Oak Hill safety concerns do not make it
    practical road closure would still be needed to
    replace large culvert

15
Temporary Traffic Signal
  • A temporary traffic signal could be installed at
    both ends of the project safety concerns due to
    all of the driveways in between the signals

16
Project Schedule
  • April 26, 2005 County Commissioners approve
    advertising of notice to bidders
  • April 29, 2005 First advertising date
  • May 6, 2005 Second advertising date
  • May 17, 2005 Open bids
  • May 24, 2005 Award Bids

17
Project Schedule
  • May 25, 2005 First day that Oak Hill Road is
    allowed to be closed
  • May 28, 2005 Scheduled completion date of INDOT
    project on Highway 41
  • August 5, 2005 Final day of road closure for
    Oak Hill Road St. George may remain closed
  • September 16, 2005 Project completion date

18
Contract Provisions
  • Contractor will receive 1,000.00 per day bonus
    for each day prior to Aug. 5 that Oak Hill is
    opened (up to a maximum of 20,000.00)
  • Contractor will be assessed liquidated damages of
    1,000.00 for each day that Oak Hill remains
    closed past Aug. 5
  • The large culvert structure has already been
    ordered by Vanderburgh County

19
Detour Routes
  • Signed detour routes will be Heckel Road, Green
    River Road, Lynch Road, and Hitch Peters Road

20
Other Upcoming Projects
  • Green River Road between Lynch Road and Hirsch
    Road
  • Project will consist of widening Green River Road
    to four lanes and elevating Green River Road out
    of flood plain
  • Estimated bid date Fall 2005

21
Other Upcoming Projects
  • Green River Road Millersburg Road Intersection
    Reconstruction
  • Project will consist of adding turn lanes and
    installing a traffic signal
  • Estimated bid date Fall 2006

22
Other Upcoming Projects
  • Oak Hill Road Bergdolt Road Intersection
    Reconstruction
  • Project will consist of adding turn lanes and
    installing a traffic signal
  • Estimated bid date 2007

23
Other Upcoming Projects
  • Green River Road between Hirsch Road and Heckel
    Road
  • Project will consist of widening Green River Road
    to four lanes and elevating Green River Road out
    of the floodplain will also include new bridge
    over Pigeon Creek
  • Estimated bid date 2008

24
Contact Information
  • County Engineering Dept. phone number 435-5773