Title: Things that Happened Before You were Born
1Things that Happened Before You were Born
- (The earth and SWMM were created)
- a story by
- Dr. Larry A. Roesner, Ph.D.,P.E.
- based (loosely) on biblical quotes
- and his own bigger than life experiences
Actually very loosely
2The earth and SWMM parallels
- In the beginning, there was the Rational Method
Qpeak CI A
3The earth and SWMM parallels
And darkness covered the drainage world because
of the limited applicability of the Rational
Method
4The earth and SWMM parallels
- Then forward looking engineers said let there be
light
- And so, they created more rational models
- SCS TR20 and TR55
- HEC-1,2,3,4,5,6, and RAS
- SWMM
5The earth and SWMM parallels
- SCS Method accounts for initial soil moisture and
time varying C - Runoff hydrographs can be computed
6The earth and SWMM parallels
- HEC model produces runoff hydrograph from
rainfall hyetograph using unit hydrograph
technique (Who knows the Schneider coefficient
for a 30 pervious urban area? ) - Hydrologic routing produces channel flows
- Hec 2 computes steady state backwater through
maximum discharge profile
7The earth and SWMM parallels
- SWMM was to be the mother of all models
- It would trace runoff from its point of origin,
through the stormwater system to and through the
receiving waters, computing flows and water
levels - It would trace wet weather pollution from its
point of origin to its final fate in the
receiving waters
8Concept of SWMM
Rainfall hyetograph
Watershed Data
RUNOFF
Q (t) C(t)
Q (t)
Inlets
Transport System Data
Transport System Data
EXTRAN
TRANSPORT
Q (t)
Q (t) C(t)
Outfalls
Point Source Loads
Receiving Water System Data
RECEIVE
Q (t), C(t) in Receiving Water
9The earth and SWMM parallels
And so it was, and (most) Civil Engineers saw the
models and they were good.
for 30yrs!!?
10SWMM Runoff Module
11SWMM Extran Module
12INTRODUCTION TO SWMM AND MIKE SWMM
- CE 580 Analysis of Urban Water Systems
- Session 10 Sept 25, 2000
13SWMM Computer Program Layout
14Interrelationship of theSWMM Blocks
15SWMM Schematic
16MIKE SWMM Demonstration
17This presentation is an embellishment of the road
culvert example contained in the Mike SWMM
documentation. In order to see the results of
road overtopping, the weirs at nodes 110 and 60
have been changed to box conduits. Three
simuations were performed o The "existing"
condition File name Exam11e.dat - culvert 110
diameter 1.0 ft - culvert 60 diameter 3.0
ft o The "existing" condition File name
Exam11p1.dat - culvert 110 diameter 2.0
ft - culvert 60 diameter 3.5 ft o The
"existing" condition File name Exam11p2.dat -
culvert 110 diameter 4.0 ft - culvert 60
diameter 5.0 ft The first simulation shows
severe overtopping of the road at both location,
with prolonged backwater at junction 110. The
second simulation shows much improvement, and the
third simulation shows the problem fixed except
for a small 15 minute overtopping of the the road
at junction 110. Modifications by LAR 12/2/98
18Camp Dresser McKeeDanish Hydraulic Institute
19Danish Hydraulic Institute- a Consulting and
Research Organization
- Objectives
- to develop and apply advanced methods and
technologies - within hydraulic and hydrological engineering
- to provide specialised consulting services
- to contribute to the technological development
through - international research collaboration and through
- transfer of know-how and technology
20MIKE SWMM
21MIKE 11
- 1-D modeling system for rivers and channels
- HD, AD, WQ, ST, FF, GIS
- more than 400 users world-wide
22MIKE 21
- a modelling system for estuaries, coastal waters
and seas - more than one hundred users in 35 countries
23MIKE SHE
- an integrated hydrological modeling system
- 3-D Groundwater movement, unsaturated zone,
Solute transport, dynamic link to MIKE 11 - some 50 users in 10 countries
24MIKE BASIN
- Water Master Planning
- use of available water resources
- planning for future water developments
- GIS
- defining the network
- evaluating results
- integrated analysis with spatial data
25LITPACK
- an integrated modelling system for Littoral
Processes And Coastline Kinetics - more than 60 users in 20 countries
26MIKE SWMM Demonstration
27(No Transcript)
28(No Transcript)
29(No Transcript)
30(No Transcript)
31(No Transcript)
32(No Transcript)
33(No Transcript)
34(No Transcript)
35(No Transcript)
36(No Transcript)
37(No Transcript)
38(No Transcript)
39(No Transcript)
40(No Transcript)
41(No Transcript)
42(No Transcript)
43Road Elev.
Road Elev.
Junction 110
Junction 60
Road
Road
Culvert
Culvert
44Road Elev.
Road
Culvert
Junction 110
45Road Elev.
Road
Culvert
Junction 110
46Road Elev.
Road
Culvert
Junction 110
47Road Elev.
Road Elev.
Junction 110
Junction 60
Culvert
Culvert
Road
Road
48Questions?