EASTSIDE RESERVOIR PROJECT Three Dams, One Reservoir - PowerPoint PPT Presentation

1 / 1
About This Presentation
Title:

EASTSIDE RESERVOIR PROJECT Three Dams, One Reservoir

Description:

earthquakes. the San Jacinto Fault (6 mi away) the San Andreas Fault ... Capable to supply southern California with six months. worth of water in an emergency ... – PowerPoint PPT presentation

Number of Views:197
Avg rating:3.0/5.0
Slides: 2
Provided by: rts502
Category:

less

Transcript and Presenter's Notes

Title: EASTSIDE RESERVOIR PROJECT Three Dams, One Reservoir


1
EASTSIDE RESERVOIR PROJECT Three Dams, One
Reservoir
  • The Eastside Reservoir project holds back 800,000
    acre-ft
  • of water
  • Has a total embankment volume of more than 110
    million yd3
  • The construction required the excavation of 40
    million yd3
  • of foundation material
  • The three dams are made from soil and rock
    materials
  • Dam design took into consideration the effects of
  • earthquakes
  • the San Jacinto Fault (6 mi away)
  • the San Andreas Fault (19 mi away)
  • Reservoir is 8,000 ft wide at its west end,
    10,000 ft wide
  • in the east, and about 2,500 ft wide near the
    middle
  • Capable to supply southern California with six
    months
  • worth of water in an emergency
  • Reservoir is between 160 and 260 ft deep
  • Total area takes up more than 4,500 acres