2nd workshop on SuperB - PowerPoint PPT Presentation

About This Presentation
Title:

2nd workshop on SuperB

Description:

Olympic medals. Beam Polarization. Run at 4.0 GeV. M.Ciuchini ... Decision on the baseline design for the machine. Start writing the first conceptual document. ... – PowerPoint PPT presentation

Number of Views:63
Avg rating:3.0/5.0
Slides: 16
Provided by: gio8
Category:

less

Transcript and Presenter's Notes

Title: 2nd workshop on SuperB


1
2nd Workshop on SuperBFRASCATI 16- 18 March 2006
Closeout Remarks
  • Marcello A. GiorgiUniversità di Pisa and INFN
    Pisa

2
OUTLINE
From my opening talk
  • More on physics case at Super Flavour Factory
  • Status of the art
  • Goals of the workshop

3
From Physics presentation
M.Ciuchini
4
Olympic medals
M.Ciuchini
Beam Polarization
Run at 4.0 GeV
5
ON THE MACHINE
  • Pantaleo has presented the results of simulations
    on various possible designs.
  • John has presented a solution possibly making use
    of he present PEPII setup and components
    (including the tunnel)

6
Machine design under discussion
  • USE of ILC DR ILC FF Requires virtually no RD
  • Uses all the work done for ILC
  • Ring and ff layouts virtually done, 3km
    circunference rings
  • 100 Synergy with ILC
  • IR extremely simplified 80-100 m straight line
  • Beam stay clear about 30sigmas with 1cm radius
    beam pipe
  • Currents around 1.5Amps
  • Background better than PEP and KEKB
  • Possibly to operate at the tau with L1035
  • Polarization of one beam considered
  • UNDER STUDY the possibility to run down to the
    phi with lumilt1034
  • Total cost about half of the ILC e DRs (2 e 6km
    rings in ILC)
  • Power around 40MW, still to be further optimized
    (goal 25MW)
  • Possible to reuse PEP RF system, power supplies,
    Vacuum pumps, etc., further reducing the overall
    cost
  • Needs the standard injector system, probably a
    C-band 7GeV linac like in KEKB upgrade (already
    designed)

7
(No Transcript)
8
Simplified layout in the Small Disruption Regime
Collisions every Turn Uncompressed
bunches Crossing angle 225 mrad Crabbed Y-Waist
ILC ring ILC FF
FF
FF
IP
9
  • John Seeman idea
  • 4400m collider (2 rings in the 2200m tunnel of
    PEPII)

10
Raimondi Feb 2006
ILC ring with ILC FF ILC Compressor Colliding
every turn crossing angle optional
C 6000 m
Decompressor
Decompressor
FF
FF
IP
Compressor
Compressor
11
Layout of One Ring Other Ring is the Reverse!
Linac injector

Bunch compressor
Bunch expander
Damping ring 2200 m
Final Focus
Reverse Final Focus
IP And Detector
12
Super-B-Factory in a 4400 m Tunnel 0.4 mm

13
2 most popular solutions
  • John and Pantaleo designs seems so far the
    closest to a possible baseline choice.
  • We need from now and next workshop a lot and well
    coordinated work to arrive to a satisfactory
    decision before the summer.

14
  • First meeting of the steering Committee
    Yesterday, we will meet again tomorrow morning at
    9.0
  • Next workshop on june 14,15,16 (To be confirmed)
    at SLAC.
  • Decision on the baseline design for the machine.
  • Start writing the first conceptual document.

15
Toward the CDR
  • A final workshop is needed in October (beginning
    of) to be able to write a reasonable CDR before
    the end of the current year.
  • A theory workshop will be held contiguous to ours
    and devoted to the preparation of the physics
    chapter of the CDR
Write a Comment
User Comments (0)
About PowerShow.com