Extending Your Test Without Extending Your Test - PowerPoint PPT Presentation

1 / 20
About This Presentation
Title:

Extending Your Test Without Extending Your Test

Description:

Often, Extra Capabilities Exist in Test Systems. Don't Polish Off ... Ohmmeter as Current Source. Use Signals from DUT. 9/3/09. Complete Test. 13. Measurements ... – PowerPoint PPT presentation

Number of Views:77
Avg rating:3.0/5.0
Slides: 21
Provided by: jaynemeth
Category:

less

Transcript and Presenter's Notes

Title: Extending Your Test Without Extending Your Test


1
Extending Your Test WithoutExtending Your Test
System
  • Jay Nemeth-Johannes
  • Bill Watry
  • Complete Test
  • Loveland, Colorado

2
The Test Engineers Nightmare
  • Project is Designed and Contract is Signed
  • One Switch Short
  • Rack is Full
  • For the Want of a Switch

3
Dont Panic
  • Often, Extra Capabilities Exist in Test Systems
  • Dont Polish Off Your Resume Yet.

4
Where To Look
  • Auxiliary Connectors
  • Hidden Modes
  • Switching inside the Instrument
  • Use the Computer as an Instrument

5
Tracking Down Elusive Sources
  • Cal Outputs
  • Aux Outputs
  • Computer Resources
  • Power

6
Cal Outputs
  • Well Defined Connectors
  • Signals are Generally Fixed (e.g. 5kHz Square
    Wave, 1V p-p)

7
Aux Outputs
  • Generally Variable
  • Tied to Primary Instrument Function (e.g. Sweep
    Ramp)
  • Often Under documented

8
Use the Computer
  • Bus Clocks
  • Serial and Parallel Ports are good digital
    sources
  • Video Signals from Monitor Aux Connection
  • Sound Card

9
Sound Card As An ARB
  • Microsoft Provides System Calls To Control Sound
    Card.
  • Once Card Configured and Waveform Downloaded,
    Refresh is Handled in Hardware (No Real-Time
    Issue)
  • LabVIEW VIs for W/F Generation at
    www.completetest.com

10
Sound Card
11
Sound Card
  • Very Flexible Arb
  • Output Levels Dependent on Soundcard
  • Max Freq Generally About 25kHz

12
Think Outside the Box
  • Power From unused Digital Outputs
  • Ohmmeter as Current Source
  • Use Signals from DUT

13
Measurements
  • Is there a Voltmeter Hiding Somewhere?
  • Make a Different Measurement
  • Is a Limit Test Good Enough?

14
How About a Scope?
  • Versatile
  • Often Underused in ATE
  • Powerful built-in functions
  • Waveform Math
  • Masks and Limits
  • FFT for Freq Domain
  • Powerful Triggering

15
Triggering
  • Need to Find Signal Before Measuring It
  • DAQ with Pattern Triggers are Tough to do in
    Software
  • Look at Using Instrument with Rich Triggering
    just for the Trigger Capabilities

16
Switching
  • Switching Allows Reuse of Measurements and
    Signals
  • Switching Costs are Generally Calculated as
    /Switch
  • However, if Switch Exceeds Current Card or Card
    Cage, Incremental Cost is Much Higher

17
Switch Cost Analysis
  • 3 Slot Card Cage 1200
  • 40 Chan MUX Card 400
  • 120 Switches Cost (1200(4003))/120
    20/Switch
  • Incremental Cost of Switch 121 is 1600

18
Avoid Switching
  • Use a More Convenient Instrument
  • Dont Need Best Instrument, Just Good Enough
  • Use Non-Obvious Switches (e.g. Front/Rear
    Terminals)
  • Dont Always Need a Switch

19
Combine Functionality
  • A More Expensive Instrument That Can Eliminate
    Switching May Be Less Expensive Overall
  • Voltmeters With Embedded Switching Are Often Cost
    Effective

20
Conclusions
  • Dont Panic, The Solution is Usually There
  • Be Aggressive in Ferreting Out Hidden
    Capabilities
  • Look at Overall System Costs, Instead of
    Individual Instrument Costs
  • Look at Non-Traditional Applications
  • The Computer is Part of the Test System
Write a Comment
User Comments (0)
About PowerShow.com