Long Term Rod Testing in US - PowerPoint PPT Presentation

About This Presentation
Title:

Long Term Rod Testing in US

Description:

University of California, Riverside. CMS Tracker Week October 2003 Patrick Gartung ... Laser output is checked on oscilloscope ... – PowerPoint PPT presentation

Number of Views:468
Avg rating:3.0/5.0
Slides: 10
Provided by: patrick294
Category:

less

Transcript and Presenter's Notes

Title: Long Term Rod Testing in US


1
Long Term Rod Testing in US
  • Patrick Gartung
  • University of California, Riverside

2
Rod Acceptance Testing
  • No electrical test done yet
  • To readout frames you need to attach/detach
    hybrid
  • Following example of TEC
  • Rod is powered and connected to FEC
  • I2C commands sent to optohybird to vary gain and
    bias
  • Laser output is checked on oscilloscope
  • Rod is unpacked and visually inspected for damage
    then placed in the assembly fixture

3
Module installation testing
  • Rod is powered and connected to DAQ
  • The rod is biased and noise and calibration
    measurements are made to determine if any bonds
    were broken (as indicated by low noise and
    calibration response).
  • Modules with broken bonds are replaced and the
    rod is retested.
  • For double sided rods test after inner 6 modules
    are installed then install outer 6
  • Modules are installed in the rod

4
Long Term Testing
  • Rods are placed in test box, connected to the
    chiller, powered and connected to DAQ
  • Rods are biased and thermal cycled for several
    days
  • Periodic measurements are made with test software
    to determine any failures
  • Chiller is controlled by independent interlock
    system which can communicate with test software
    on DAQ system.

5
Single Rod Test Stand
OEC (12 channels)
DAQ PC with 2 FED
CTRL adapter and cables
Cold box with dry air
chiller
High voltage (36 channels)
Low voltage
  • Work done by Jim Lamb (UCSB student)
  • Readout 1 SS or DS rod
  • Prototype set up at UCSB
  • Currently using XROD to take pedestals
  • Will thermal cycle rod with chiller control

6
Multi-rod test stand status
  • Prototype freezer moved from Rochester to
    Fermilab October 11.
  • Second freezer will be shipped to UCSB early
    December.
  • Designed and built an electronic circuit to
    command the coolant, vacuum and compressed air
    valves
  • Allows a low current signal to completely control
    flow of coolant and the application of compressed
    air and vacuum
  • Completed the automation of the procedure for
    loading and unloading of rods
  • Work done by Ricardo Eusebi (Rochester student)
  • Labview VI running on interlock PC will guide
    user
  • User selects install rods and PC sets freezer
    in proper condition
  • PC closes coolant valves and drains pipes
  • User is prompted to install rods and click
    continue
  • PC opens coolant valves and fills pipes
  • After long term test user will select remove
    rods and the reverse procedure will be followed.

7
Assembly diagnostic software
  • Currently using XROD
  • Quickly determine optohybrid gain and bias
    settings, FED timing and PLL timing
  • Perform quick noise measurements to check for
    opens

8
Long term test software
  • Lt is being extended to test modules on
    substructures
  • Working with Wim Beamont to define settings for
    rods
  • Will beta test on rod in the next few weeks
  • Chiller control system listens on TCP port for
    set temperature commands from Lt
  • Ability to read and record temperatures and
    currents for free
  • Scripting of temperature change, voltage change
    and various tests for free

9
Equipment needs
  • To complete two single rod test stands
  • Need 1 TSC, 2 OEC (2nd OEC on motherboard)
  • 2 OMUX crates with 4 mux cards each
  • (Optional) 4 electrometers
  • Short term for multi-rod test stands
  • 2 TSC, 2 FED, 2 FEC
  • 2 OMUX crates with 4 mux cards each
  • 4 OEC on 2 motherboards
  • 2 CERN low voltage power supplies
Write a Comment
User Comments (0)
About PowerShow.com