Title: MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION Ltd. Nepean Sea Road, Adj. to Priyadarshini Park, Mum
1Presentation on The Road ahead..
Maharashtra State Road Development Corporation
Limited
2MSRDC
3Board of Directors
4Organisation structure
5 Project steps
6Project finance
7Financial Arrangement Repayment
Income from Toll
- Toll levied on users of improved facilities
- Toll levied at entry roads to city
- Income from cess
- Cess on petrol and diesel in Cities
- Income from other assets and
- developments
- Way side amenities
- Hoardings and advertisement rights
- Telecom ducts other utility lines
- commercial development of land
- Pay and Park
8Projects completed Figures in Rs.
Cr.
9Projects Nearing Completion
Figures in Rs. Cr.
10 Ongoing Projects Figures
in Rs. Cr.
11Projects Close to Take Off
Figures in Rs. Cr.
12Projects on the anvil
- Mumbai-Nasik Expressway
- Bandra Versova Sea link
- IRDP Sangli, Ahmednagar,
- ROBs Tumsar, Warora, Katol
-
13 14View of Mumbai-Pune Expressway On Completion
15Mumbai-Pune Expressway
16BHATAN TUNNEL- 1100M LONG - MUMBAI FACE THE
LONGEST TUNNEL ON THE EXPRESSWAY
17THE EXPRESSWAY95 km of class and convenience
18THE EXPRESSWAY95 km of class and convenience
19THE EXPRESSWAY95 km of class and convenience
20Bandra WorliSea Link
21Bandra Worli Sea Link Project
22Package I Lovegrove Flyover
Bandra Worli Sea Link Project
Package II Mahim Interchange
23Package III Solid Approach Road at Bandra
Bandra Worli Sea Link Project
24- Bandra Worli Sea Link
- Creation of MSRDC Government of Maharashtra
25Bandra-Worli Sea Link
26 27(No Transcript)
28(No Transcript)
29(No Transcript)
30(No Transcript)
31(No Transcript)
32(No Transcript)
33- Bandra-Worli Sea Link, a new landmark in Mumbai
34WFSL Project
- WFSL project to connect Bandra to Nariman Point
with Dispersal Arms at Worli, Haji Ali, BD Marg
Cuffe Parade - Approved by MoEF in 2003
35WFSL Project
36WFSL Phase II-A Worli to Haji Ali
Bandra
- 8 lane Sea Link
- Cost Rs 4300 Cr.
- Global Tenders on BOT
- Toll rights from Bandra to HajiAli
- Two bids received
- Proposal submitted to GOM
Worli
Phase II-A
Nariman Point
Gateway of India
Cuffee Parade
36
37WFSL Phase II-B HAJI ALI to N. POINT
- Various alternatives explored
- Tunnel from Haji Ali to Nariman Point
- Coastal road Haji Ali to Nariman Point,
Combination of Coastal road, sea link and
tunnel - Feasibility study
- report submitted.
38- Varsova Bandra Sea Link Project (VBSL)
39(No Transcript)
40VBSL
- Options Studied
- Alignment along Coast -10.63 km
- Alignment Partly in Sea partly along
Coast-10.40 km - Alignment in Sea -10.15 km
- Preferred option Alignment along coast by cut
Cover method - No of Lanes 6
- Approx cost of Preferred alignment Rs.2300 Cr
- FIRR of Preferred alignment 22.0
41Mumbai Trans Harbour Link
- Eight lane Road Bridge from Sewree to Nhava
- Total Length 22.0 Km of which 17.0 Km on sea
5.0 km on Land - Vertical clearance of 31 m for navigational
spans - Base Cost Rs. 5500 cr (approx)
- Total Construction period -5 years
42Mumbai Trans Harbour Link
- Minimum Span 50 m
- No. of cable stayed bridges 2
- Bridge Control Stations / Bird observatory
- 99 lane toll plaza
- Interchanges and Ramps
- Disaster Management Plan
- 100 year design life
43MTHL
44MTHL
- MSRDC to implement MMRDA to own and fund the
project - Bids on Design and Build contract
- proposed under VGF to GOI
- Detailed Proposal under preperation
45Mumbai Urban Infrastructure Project (MUIP),
MMRDA
- A Government of Maharashtra (MMRDA) Initiative
- Focus on improvement of roads, construction of
missing links, ROBs. flyovers, bridges and
pedestrian facilities
46FLYOVERS UNDER MUIP MMRDA
- Flyover at Dindoshi junction on WEH (Completed)
- Flyover at Thakur Complex Junction on WEH
(Completed) - Flyover at Times of India on WEH ( June 10)
- Flyover at Suman Nagar Junction on EEH (end May
10) - Flyover and pedestrian Cum Vehicular Subway at
Barfiwala Junction across S V Road and Gokhale
Bridge (end May 2010 ) - Flyover at Santacruz Airport ( Completed )
46
47Extended MUIP (MMRDA Funded)
(Costs in Rs Crores)
48Road Components of MUTP
- Roads
- Jogeshwari-Vikhroli Link Road Sec.I III
Rs.104.67 Cr - Jogeshwari-Vikhroli Link Road Sec.II Rs.112.33 Cr
- Santacruz-Chembur Link Road Sec. I Rs.63.05 Crs
- Santacruz-Chembur Link Road Sec. II Rs.191.68
Crs -
49LOCATION PLAN OF THE LINKS
50Present status
51The Road ahead.Some points for discussion
52The Road ahead.Some points for discussion
53- We Can,
- If we think we can!
54MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
LTD. PWD Compound, Nepean Sea Road,
Priyadarshini Park, Mumbai 400 036Maharashtra,
INDIA.
Thank You