1HSE-MS based upon Risk Management
2Workplace Hazard Information Management
System(WHIMS)
3WHIMS
- To ensure that all work is conducted safely,
before any job of work can start a Job Safety
Plan must the produced.
WHIMS is used to do this.
4A JOB SAFETY PLAN
- Lists the Activities and Hazards involved in
performing work.
- Lists the Control Measures required to ensure the
work is carried out safely.
- Carries signatures of Applicant and Responsible
Supervisor.
5JOB SAFETY PLANS
- WHIMS has a library of generic or Reference Job
Safety Plans (JSPs) that can be used as the basis
for new JSPs.
- JSPs can be copied, either within the Users Area
or from another Area.
- Only JSPs within the Users own Area can be
edited.
6JOB SAFETY PLANS
A Job Safety Plan (JSP) is produced by
- Creating the Steps, if applicable
- Selecting ACTIVITIES (the type of work to be done)
- Reviewing the HAZARDS (the events that could
happen)
- Reviewing the CONTROLS (measures taken to
control the Hazards)
7JOB SAFETY PLAN
contained by
Activities
Hazards
Controls
incur
Naked Flame
Protective Headgear
Welding
Tripping Hazard
Check equipment .
Welding
Smoke
Safety Harness to be worn
Grinding
Projectiles
Hard hats
Grit Blasting
etc.
Barriers to be .
etc.
etc.
8JOB SAFETY PLAN
contained by
Activities
Hazards
Controls
incur
Naked Flame
Protective Headgear
Welding
Tripping Hazard
Check equipment .
Welding
Smoke
Safety Harness to be worn
Grinding
Projectiles
Hard hats
Grit Blasting
etc.
Barriers to be .
etc.
etc.
Select the Activities for your Job Safety Plan
9JOB SAFETY PLAN
contained by
Activities
Hazards
Controls
incur
Welding
Naked Flame
Grinding
Protective Headgear
Welding
Tripping Hazard
Check equipment .
Smoke
Safety Harness to be worn
Projectiles
Hard hats
Grit Blasting
etc.
Barriers to be .
etc.
etc.
Select the Activities for your Job Safety Plan
10JOB SAFETY PLAN
contained by
Activities
Hazards
Controls
incur
Welding
Naked Flame
Grinding
Protective Headgear
Welding
Tripping Hazard
Check equipment .
Smoke
Safety Harness to be worn
Projectiles
Hard hats
Grit Blasting
etc.
Barriers to be .
etc.
etc.
The Hazards are selected automatically by the
Activities
11JOB SAFETY PLAN
contained by
Activities
Hazards
Controls
incur
Tripping Hazard
Welding
Naked Flame
Grinding
Protective Headgear
Welding
Projectiles
Check equipment .
Smoke
Safety Harness to be worn
Hard hats
Grit Blasting
etc.
Barriers to be .
etc.
etc.
The Hazards are selected automatically by the
Activities
12JOB SAFETY PLAN
contained by
Activities
Hazards
Controls
incur
Tripping Hazard
Welding
Naked Flame
Grinding
Protective Headgear
Welding
Projectiles
Check equipment .
Smoke
Safety Harness to be worn
Hard hats
Grit Blasting
etc.
Barriers to be .
etc.
etc.
The Hazards are selected automatically by the
Activities
Further Hazards can be selected
13JOB SAFETY PLAN
contained by
Activities
Hazards
Controls
incur
Tripping Hazard
Welding
Smoke
Naked Flame
Grinding
Protective Headgear
Welding
Projectiles
Check equipment .
Safety Harness to be worn
Hard hats
Grit Blasting
etc.
Barriers to be .
etc.
etc.
The Hazards are selected automatically by the
Activities
Further Hazards can be selected
14JOB SAFETY PLAN
contained by
Activities
Hazards
Controls
incur
Tripping Hazard
Welding
Smoke
Naked Flame
Grinding
Protective Headgear
Welding
Projectiles
Check equipment .
Safety Harness to be worn
Hard hats
Grit Blasting
etc.
Barriers to be .
etc.
etc.
The Controls are selected automatically by the
Hazards and the Activities
15JOB SAFETY PLAN
contained by
Activities
Hazards
Controls
incur
Tripping Hazard
Welding
Protective Headgear
Smoke
Naked Flame
Grinding
Welding
Projectiles
Check equipment .
Barriers to be erected ..
Safety Harness to be worn
Hard hats
Grit Blasting
etc.
etc.
etc.
The Controls are selected automatically by the
Hazards and the Activities
Further Controls can be typed in
16JOB STEPS
- Steps are new to Pharos Ver. 2.1.
- Steps are used to break a large, complex job down
into smaller jobs.
- A Job Safety Plan is produced for each Step.
- The work for each Step is carried out independent
of the other Steps.
17JOB STEPS
STEP 1
All Steps are carried out independently, either
one after the other or at the same time
STEP 3
STEP 2
STEP 4
STEP 5
18JOB STEPS
First, do Step 1.
STEP 1
Steps 2 and 3 can be done at the same time.
STEP 3
Or Steps 2 and 4 could be done at the same time,
but Step 4 must always follow 3.
STEP 2
STEP 4
Finally, Step 5 is done after Steps 2 and 4 are
complete.
STEP 5
19(No Transcript)