FLOODWAY EXPANSION GROUNDWATER ACTION RESPONSE PLAN - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

FLOODWAY EXPANSION GROUNDWATER ACTION RESPONSE PLAN

Description:

MFA MAY DELIVER POTABLE WATER. MFA MAY LOWER RESIDENT'S PUMP DEPTH ... MFA Provides Potable Water. Determine Action Plan. Manitoba. Floodway Authority. Manitoba ... – PowerPoint PPT presentation

Number of Views:44
Avg rating:3.0/5.0
Slides: 11
Provided by: gpa8
Category:

less

Transcript and Presenter's Notes

Title: FLOODWAY EXPANSION GROUNDWATER ACTION RESPONSE PLAN


1
FLOODWAY EXPANSION GROUNDWATER ACTION RESPONSE
PLAN
  • 1. OVERVIEW
  • GROUNDWATER IS A TOP PRIORITY
  • DESIGN IS TO WIDEN THE CHANNEL NOT DEEPEN,
    TO MINIMIZE ANY GROUNDWATER
    IMPACTS
  • MONITORING IS ONGOING ALONG CHANNEL
  • CARBONATE BEDROCK AQUIFER
  • GROUNDWATER CONFINED BY OVERLYING CLAY
  • WATER LEVEL PRESSURE IN BEDROCK ABOVE CHANNEL
    BOTTOM

2
  • 2. CONSTRUCTION REQUIREMENTS
  • TEMPORARILY LOWER OR DRAWDOWN WATER LEVEL LOCALLY
    TO INSTALL BRIDGE FOUNDATIONS
  • TO FACILITATE CONSTRUCTION, WATER MUST BE REMOVED
    FROM THE EXCAVATIONS
  • 3. REASON FOR TEMPORARY DRAWDOWN
  • TO PREVENT GROUNDWATER SEEPAGE INTO THE EXCAVATION

3
  • 4. EXPECTED IMPACTS
  • GROUNDWATER DRAWDOWN WORK IS ANTICIPATED FOR
    APPROXIMATELY 2 TO 3 MONTHS, STARTING IN
    NOVEMBER, 2005
    AND IN FALL, 2006 (HWY. BRIDGE
    59S).
  • LOCAL DRAWDOWN FOR CENTRAL BRIDGE PILES WILL
    EXTEND OUTWARD BEYOND BRIDGE.
  • TEMPORARY DRAWDOWN ESTIMATED TO BE 1.5 M OR LESS
    AT CLOSEST DOMESTIC WELLS.
  • MOST SUBMERSIBLE PUMPS SET WELL BELOW OPERATING
    LEVEL FOR DRY SEASONS, AND CAN HANDLE 1.5 M
    ADDITIONAL DRAWDOWN.
  • SLIGHT RISK FOR A FEW PUMPS TO GO TEMPORARILY DRY
    - MFA TO MITIGATE.

4
  • 5. MITIGATION OPTIONS
  • MFA MAY DELIVER POTABLE WATER
  • MFA MAY LOWER RESIDENTS PUMP DEPTH
  • MFA MAY MODIFY CONSTRUCTION PROCEDURES
  • OTHER (SUGGESTIONS FROM THE PUBLIC?)

5
(No Transcript)
6
GROUNDWATER ACTION RESPONSE PLAN
  • RESIDENT ACTION
  • COMPLAINT RECEIVED BY MFA FROM RESIDENT ADJACENT
    TO PROJECT DRAWDOWN ACTIVITIES
  • MFA CONTACT
  • Toll Free Telephone 1-877-456-1201

7
  • PROPOSED MFA ACTION
  • 1. PRELIMINARY SCREENING
  • DISCUSS WITH RESIDENT WITHIN 1 HOUR OF COMPLAINT
    RECEIPT
  • INTERFERENCE MAY HAVE OCCURRED
  • MFA Provides Potable Water
  • Determine Action Plan

8
  • PROPOSED RESPONSE PROCEDURES
  • 2. SECONDARY WELL ASSESSMENT
  • MFA ONSITE TIMELY ASSESSMENT AS ARRANGED WITH
    RESIDENT
  • 3. MFA POSSIBLE MITIGATION ACTIONS
  • CONTINUE WATER DELIVERY
  • LOWER OWNERS PUMP
  • MODIFY PROJECT PUMPING AND DRAWDOWN
  • OTHER (SUGGESTIONS FROM THE PUBLIC?)

9
  • 4. PROPOSED DOCUMENTATION NOTIFICATION
  • PREPARE INCIDENT REPORT FOR REGULATORS
  • LOCATION OF COMPLAINT
  • INVESTIGATIONS AND RESULTS
  • ACTIONS TAKEN
  • MFA WILL NOTIFY MANITOBA WATER STEWARDSHIP (MWS),
    WATER LICENSING BRANCH, MANITOBA CONSERVATION AND
    FEDERAL RESPONSIBLE AUTHORITIES (PHONE AND
    E-MAIL)
  • MFA WILL SUBMIT INCIDENT REPORT TO MWS
    WITHIN 1 WEEK OF ASSESSMENT

10
  • 5. ONGOING PLAN IMPROVEMENTS
  • GROUNDWATER ACTION PLAN WILL BE AMENDED TO
    IMPROVE RESPONSE AS REQUIRED.