Bruss Construction, Inc. - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

Bruss Construction, Inc.

Description:

Bruss Construction, Inc. Established 1982. 3rd Generation Construction Family ... Proctor Eco Dorm. WMS Science. Green Woodlands. LEED Commercial pilot. 1st Gold in NE ... – PowerPoint PPT presentation

Number of Views:47
Avg rating:3.0/5.0
Slides: 15
Provided by: stephan164
Category:

less

Transcript and Presenter's Notes

Title: Bruss Construction, Inc.


1
  • Bruss Construction, Inc.
  • ___________________
  • Established 1982
  • 3rd Generation Construction Family
  • 50 Field employees
  • 30 Years experience in alternative energy
    movement

2
  • 70s Solar
  • Solar Hot Water Systems
  • Green Houses
  • 80s High Performance
  • Envelope Houses
  • High Performance/Solar Homes
  • 90s
  • Rehab
  • Super insulated buildings
  • 2000s Sustainable/Green Building
  • SPNHF
  • Harris Center
  • Proctor Eco Dorm
  • WMS Science
  • Green Woodlands
  • LEED Commercial pilot
  • 1st Gold in NE
  • LEED Residential pilot

3
Green/Sustainable Project Goals
4
  • Project needs to be looked at from all these
    perspectives
  • Site
  • Energy Conservation
  • Water Usage/Treatment
  • Indoor Environment Quality (IEQ)
  • Appropriate Technologies (Passive when possible)
  • Materials/Methods
  • Project Management

5
How are we applying these things at Nubi River?
6
Site Considerations - Re-use/Rehab existing
Governors House - Developing only 3.5 out of
124 acres - Minimize home size- share community
building - High density development reduces hard
surfaces, runoff - Community Planning -
Designed to force the interaction between
neighbors thereby building a sense of
community - Pedestrian Community
7
Energy Conservation - No Fossil Fuels allowed on
site - Centralized wood fired heating plant for
heat hot water - Day lighting implemented to
reduce need for interior lighting - High
performance building envelopes - Integrated
glazing strategies high performance glazing
8
Water Usage/Treatment - Low flow Fixtures -
Tying into Municipal sewer system to minimize
site impact - Grey water recycling
9
Indoor Environmental Quality - Energy Recovery
Units providing fresh air to occupants while
capturing energy from exhausted air - Low or
No V.O.C. material choices - Thermal comfort -
Noise control strategies
10
Appropriate Technologies - Solar Thermal -
Solar P/V - Renewable (Woodpellet Fired) heating
hot water systems - Grey water recycling
supporting Bio Dynamic Organic Agriculture
(CSA) (under consideration)
11
Materials Methods - Local materials - High
recycled content material choices - Life cycle
analysis - Low maintenance finishes
12
Project Management - Integrated Design - Job
site recycling - Follow through on design
details Carry the message to the field -
Manage what you measure -Blower Door Testing of
all buildings - Building commissioning - Post
Occupancy Survey
13
Green Building Results (Society for Protection
of NH Forests) - 61 less BTUs to heat than
normal - 90 less water consumption than
normal - 33 less Electricity than normal -
Construction Costs matched state average for
office buildings of similar size
14
For more information on this project Please
Visit www.PeterboroughCo-housing.org OR www.br
usscon.com
Write a Comment
User Comments (0)
About PowerShow.com