Title: Bruss Construction, Inc.
1- Bruss Construction, Inc.
- ___________________
- Established 1982
- 3rd Generation Construction Family
- 50 Field employees
- 30 Years experience in alternative energy
movement
2- 70s Solar
- Solar Hot Water Systems
- Green Houses
- 80s High Performance
- Envelope Houses
- High Performance/Solar Homes
- 90s
- Rehab
- Super insulated buildings
- 2000s Sustainable/Green Building
- SPNHF
- Harris Center
- Proctor Eco Dorm
- WMS Science
- Green Woodlands
- LEED Commercial pilot
- 1st Gold in NE
- LEED Residential pilot
3Green/Sustainable Project Goals
4- Project needs to be looked at from all these
perspectives - Site
- Energy Conservation
- Water Usage/Treatment
- Indoor Environment Quality (IEQ)
- Appropriate Technologies (Passive when possible)
- Materials/Methods
- Project Management
5How are we applying these things at Nubi River?
6Site Considerations - Re-use/Rehab existing
Governors House - Developing only 3.5 out of
124 acres - Minimize home size- share community
building - High density development reduces hard
surfaces, runoff - Community Planning -
Designed to force the interaction between
neighbors thereby building a sense of
community - Pedestrian Community
7Energy Conservation - No Fossil Fuels allowed on
site - Centralized wood fired heating plant for
heat hot water - Day lighting implemented to
reduce need for interior lighting - High
performance building envelopes - Integrated
glazing strategies high performance glazing
8Water Usage/Treatment - Low flow Fixtures -
Tying into Municipal sewer system to minimize
site impact - Grey water recycling
9Indoor Environmental Quality - Energy Recovery
Units providing fresh air to occupants while
capturing energy from exhausted air - Low or
No V.O.C. material choices - Thermal comfort -
Noise control strategies
10Appropriate Technologies - Solar Thermal -
Solar P/V - Renewable (Woodpellet Fired) heating
hot water systems - Grey water recycling
supporting Bio Dynamic Organic Agriculture
(CSA) (under consideration)
11Materials Methods - Local materials - High
recycled content material choices - Life cycle
analysis - Low maintenance finishes
12Project Management - Integrated Design - Job
site recycling - Follow through on design
details Carry the message to the field -
Manage what you measure -Blower Door Testing of
all buildings - Building commissioning - Post
Occupancy Survey
13Green Building Results (Society for Protection
of NH Forests) - 61 less BTUs to heat than
normal - 90 less water consumption than
normal - 33 less Electricity than normal -
Construction Costs matched state average for
office buildings of similar size
14For more information on this project Please
Visit www.PeterboroughCo-housing.org OR www.br
usscon.com