King Air Deployment in RICO - PowerPoint PPT Presentation

1 / 13
About This Presentation
Title:

King Air Deployment in RICO

Description:

Currently the antenna are switched manually. Planning on implementing fast switching ... Upward and downward pyranometer. Upward and downward pyrgemometer ... – PowerPoint PPT presentation

Number of Views:463
Avg rating:3.0/5.0
Slides: 14
Provided by: eolU
Category:

less

Transcript and Presenter's Notes

Title: King Air Deployment in RICO


1
King Air Deployment in RICO
  • Larry Oolman
  • University of Wyoming

2
Overview
  • Instrumentation
  • Standard and user supplied
  • Additional Requests
  • Operations

3
Wyoming Cloud Radar
  • Four Antenna
  • Down
  • Down slant forward
  • Side/Up switched with a mirror.
  • Side slant forward
  • Currently the antenna are switched manually
  • Planning on implementing fast switching

4
Cloud Physics
  • Cloud Particle Spectrometers
  • FSSP 100
  • 1DC (200X)
  • 2DC
  • 2DP
  • DMT LWC-100
  • PVM-100 (Gerber)

5
Fluxes
  • Licor 6262 Gas Analyzer
  • Carbon Dioxide
  • Water Vapor
  • Friehe temperature probe is unavailable
  • Reverse Flow Temperature
  • User supplied water vapor?
  • Lyman-alpha
  • IRGA

6
Radiation
  • Upward and downward pyranometer
  • Upward and downward pyrgemometer
  • Radiation Pyronometer (Heimann surface
    temperature)
  • User supplied upward-looking narrow beam IR?

7
Other Instruments
  • TECO 40 Ozone detector
  • Wyoming CCN counter

8
Satphone
  • Provides
  • Telemetered data
  • Chat room
  • Voice communications

9
Weather Radar Camera
  • The King Air request included the phrase 'weather
    radar camera'.
  • One video recorder. Must select which camera
    (forward, down, other?)

10
Operations
  • 144 total flight hours
  • 105 research
  • 27 ferry
  • 12 test
  • Two pilots
  • Crew duty should not be an issue
  • Flights should be limited to fours hours

11
Crewing
  • Three or four people
  • Pilot
  • Flight scientist
  • Instrument engineer
  • Fourth seat CCN counter, chat room, observer.
  • Adding the fourth seat decreases the fuel that
    can be carried by 200 pounds (20 minutes).

12
Operations Concerns
  • Coordination of multiple aircraft in cloud.
  • Lowest allowed altitude in cloud.
  • Alternate airports.
  • Low level wind shear.
  • Matching airspeeds, 120 m/s is too fast for the
    KA.

13
Items to Resolve
  • Additional water vapor sensor
  • Upward looking narrow beam IR sensor
  • Weather radar camera
  • Intercomparison with C-130 prior to project
Write a Comment
User Comments (0)
About PowerShow.com