3Project Overview
US 41 Project Overview
- 17 miles in Winnebago County
- 14 miles in Brown County
- 13 interchanges reconstructed
- 44 roundabouts
- 8 lane Lake Butte des Morts Causeway
- Largest road construction project in the history
of Northeast Wisconsin - Construction start 2009
4Project Cost Estimate
- Brown County 545,000,000
- Winnebago County 443,000,000
- Total 988,000,000
- Costs are SFY 2009 TPC estimates and include
(Let, Non-Let and Delivery)
5US 41 Project Schedule
Schedule subject to funding, NEPA and staging
reviews
6US 41 Construction Schedule
- Orange Lane to Glory Road
- 2011-2015
- Glory Road to Morris Street
- 2011-2015
- Morris Street to Memorial Drive
- 2013-2015
- STH 29 Interchange
- 2011-2015
- Memorial Drive to Lineville Road
- 2013-2016
7US 41 Project Goals
- Deliver the US 41 Mega Project On-Time
- Deliver the US 41 Mega Project On-Budget
- Deliver a High Quality Project
- Maintain Public Support, Trust Confidence
- Create Opportunity
- Achieve IH Design Standards
- Deliver a Safe Project
- Provide Aesthetics that Enhance the Character of
the Project and Represent a Desired Community
Image - Enhance Multi-Modal Opportunities
- No Surprises
8Project Highlights
- Urban Service Interchange Reconstruction
- System Interchange Upgrades
- Mainline Capacity Improvements
- Lake Butte des Morts Causeway Capacity
- Safety Operational Improvement-Roundabouts
- Safety Improvement-Lighting
- Multi-Modal Improvements
- Freeway Management Systems
9US 41 Corridor Roundabout PlanA Safer Approach
10US 41 Corridor Roundabout PlanA Safer Approach
11US 41 Corridor Roundabout PlanA Better Approach
12WIS 29 Interchange
- US 41 WIS 29 interchange improvement
- 3-leg system interchange
- Imbedded service interchange(s)
- Shawano Avenue (full)
- Packerland Drive (half)
- Addresses deficiencies
- Meets Interstate Standards
13STH 29 Fly Through
WIS 29 Interchange
14IH 43 Interchange
- US 41 IH 43 interchange improvement
- Addresses deficiencies
- Safety
- Operations
- Geometric
- Meets Interstate Standards
- 65 mph system ramps
- Removes loop ramps
15IH 43 Velp Avenue Access Change
- US 41 IH 43 System Interchange Improvement
- Removes access between IH 43 and Velp Avenue via
US 41 - Safety Operational Need
- System ramps vs close interchange proximity
- Eliminates deficient weaving segments
- Access between IH 43 and Velp Avenue accomplished
via - Velp Avenue and Atkinson Drive Interchange _at_ IH
43 - Lineville Road Interchange _at_ US 41
- Shawano Avenue _at_ US 41
16IH 43 Interchange
17Collector Distributor Road System(Mason Street
to WIS 29)
- A parallel roadway designed to remove weaving
from the main line and to reduce the number of
main line entrances and exits
18Collector Distributor Road System(Mason Street
to WIS 29)
- Significantly improved traffic operations at WIS
29 and Mason Street interchanges - Eliminates freeway weaving
- Improved long term service life of facility
- Improves TMP constructability options (should
WisDOT quantify savings due to easier
construction staging) - C-D retrofit is not a possibility after
construction
19Collector Distributor Road System (Mason Street
to WIS 29)
20Project Aesthetics-Winnebago County
- Retaining Walls
- Fencing/Railing
- Columns
- Roundabout Landscaping
- Parapet Design
- Decorative Lighting
Witzel Avenue Overpass Rendering
21Project Update-Public Involvement
- PI Goals
- To meet with anyone, anyplace, anytime to create
meaningful dialogue with the public - To establish trust and credibility within the
community - To be the first and best source of information
about the project - To seek public input at project milestones
22Project Update-Community Outreach
- Community Stakeholder Committee (CSC)
- Semi-annual opportunity for communication between
WisDOT, community officials and business leaders - February 16th initial meeting _at_ NE Region office
- US 41 Neighborhood Liaisons
- Provide connection to neighborhoods,
communities - Provide opportunity for project input (access)
- Provide timely project information
- Community EventsLet Us Know
23Project Update-Community Outreach-Public Meetings
- Mid-April CTH F Interchange PIM
- Mid-May WIS 29 PIM
- May Initiate Morris to Memorial EIS
- Mid-October WIS 29 EA Public Hearing
- Various Community and Industry Events
24Project Update-CSD
- Community Sensitive Design (CSD)
- Determine corridor aesthetics
- Community coordination
- CSD Committee/Workshops
- Initial CSD Workshop is March 5th
- 6 Workshops between March and September
- Maintenance agreements will need to be developed
- Village of Howard will be represented
25Project Update-NEPA Process
- South Segment (Orange Lane to 9th Street)
- EA Re-evaluation (Summer 2009)
- Middle Segment (9th Street to Memorial Drive and
WIS 29) - EA FONSI (Spring 2010)
- North Segment (Memorial Drive to Lineville Road
and IH 43) - EIS ROD (2012)
- Affects real estate acquisition, utility
relocation and construction lettings
26Project Update-Whats New
- Traffic Management Plan
- 2-lanes NB SB during construction
- Interchange access restrictions-TBD
- Staging workshops
- Business community coordination
- CTH M (Lineville Road) Interchange Reconstruction
- 2013 construction
- Done prior to Velp Avenue Interchange for TMP
27Project Update-Whats New
- GBMSD Utility Conflict
- Mason Street to Velp Avenue
- Potential for 16 million dollar utility
relocation - Local Development Driven Improvements
- WIS 29
- Dousman extension
- East-West connector
- Velp Avenue
- Development access, Wietor Wharf-Riverview Drive
(CTH J)
28US 41 Project Outreach Office
- Project Outreach Office open in Green Bay at 100
N. Packerland Drive - Opportunity for contractors to learn more about
upcoming contracts - Opportunity for firms to learn about DBE
certification, bidding requirements, etc.
292009 Construction Lettings
- 2 Contracts
- Lettings currently scheduled in March and June
- Contract values ranging from 750,000 to
3,000,000 - Winnebago County
- 12 Contracts
- 40 million
30DePere Stormwater Detention Pond
- March 2009 Let
- Series of new stormwater detention ponds adjacent
to US 41 near Grant Street and Main Street (CTH
G) - Contract value of 1,500,000 to 3,000,000
31Brown County Building Razing Removal
- June 2009 Let
- Razing and removal of residential and commercial
buildings along Shawano Avenue, Packerland Drive,
Velp Avenue and Island Court - Contract value of 750,000 to 1,000,000
32US 41 Project Quantities (Current Estimate)
33US 41 Brown County
34THE END
Brett Wallace, PE USH 41 Corridor Program
Manager (920) 492-5693 Brett.wallace_at_dot.state.wi.
us
35Brown County-Property Relocation Summary
- 58 Total Parcels
- Potential for 4-6 additional for GBMSD Conflict
- 8 Commercial Parcels
- 7 in Village of Howard
- 1 in City of Green Bay
- New WIS 29 (Shawano Avenue) Alignment
- Shawano Avenue Taylor Street Intersection
- Packerland Drive Interchange
- Velp Avenue Interchange
- Island Court
36Winnebago County-Property Relocation Summary
- 16 Total Parcels (14 Commercial)
- 1 in City of Neenah
- 2 in Town of Algoma
- 4 in Town of Oshkosh
- 9 in City of Oshkosh
- US 45 Interchange
- WIS 21 Interchange and Washburn Street
- Breezewood Lane Interchange